Heat Glo LifeStyle Indoor Fireplace BE 41C User Manual

Para obtener un ejemplar en Español de este  
Pour demander un exemplaire en français de ce Manuel  
Owner’s Manual  
Installation and Operation  
Models:  
BE-41C  
BE-41LPC  
BE-41IPIC  
BE-41IPILPC  
NOTICE  
DO NOT DISCARD THIS MANUAL  
• Important operating  
and maintenance  
instructions included.  
• Read, understand and follow  
these instructions for safe  
installation and operation.  
• Leave this manual with  
party responsible for use  
and operation.  
WARNING  
WARNING: If the information in these  
instructions is not followed exactly, a re  
or explosion may result causing property  
damage, personal injury, or death.  
HOT SURFACES!  
Glass and other surfaces are hot during  
operation AND cool down.  
Hot glass will cause burns.  
DO NOT touch glass until it is cooled  
• NEVER allow children to touch glass  
• Keep children away  
DO NOT store or use gasoline or other am-  
mable vapors and liquids in the vicinity of this  
or any other appliance.  
• CAREFULLY SUPERVISE children in same room as  
replace.  
• Alert children and adults to hazards of high temperatures.  
• What to do if you smell gas  
- DO NOT try to light any appliance.  
High temperatures may ignite clothing or other ammable  
materials.  
• Keep clothing, furniture, draperies and other ammable  
materials away.  
- DO NOT touch any electrical switch. DO  
NOT use any phone in your building.  
- Immediately call your gas supplier from a  
neighbor’s phone. Follow the gas suppli-  
er’s instructions.  
This appliance has been supplied with an integral barrier  
to prevent direct contact with the xed glass panel. DO  
NOT operate the appliance with the barrier removed.  
- If you cannot reach your gas supplier, call  
Contact your dealer or Hearth & Home Technologies if the  
barrier is not present or help is needed to properly install one.  
the re department.  
• Installation and service must be performed  
by a qualied installer, service agency, or the  
gas supplier.  
In the Commonwealth of Massachusetts installation must be  
performed by a licensed plumber or gas tter.  
See Table of Contents for location of additional Commonwealth  
of Massachusetts requirements.  
This appliance may be installed as an OEM installation in  
manufactured home (USA only) or mobile home and must be  
installed in accordance with the manufacturer’s instructions  
and the manufactured home construction and safety standard,  
Title 24 CFR, Part 3280 or Standard for Installation in Mobile  
Homes, CAN/CSA Z240MH, in Canada.  
Installation and service of this appliance should be  
performed by qualied personnel. Hearth & Home  
Technologies suggests NFI certied or factory trained  
professionals, or technicians supervised by an NFI  
certied professional.  
This appliance is only for use with the type(s) of gas indicated  
on the rating plate.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1
Safety Alert Key:  
• DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.  
• WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.  
• CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.  
• NOTICE: Used to address practices not related to personal injury.  
Table of Contents  
A. Congratulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2  
B. Limited Lifetime Warranty. . . . . . . . . . . . . . . . . . . . . . . . . . 5  
7 Vent Information and Diagrams  
Î
A. Approved Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24  
B. Vent Table Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24  
C. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24  
D. Measuring Standards. . . . . . . . . . . . . . . . . . . . . . . . . . . . 24  
E. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25  
1 Listing and Code Approvals  
A. Appliance Certication . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
B. Tempered Glass Specications . . . . . . . . . . . . . . . . . . . . . 7  
C. BTU Specications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
D. High Altitude Installations. . . . . . . . . . . . . . . . . . . . . . . . . . 7  
E. Non-Combustible Materials Specication. . . . . . . . . . . . . . 7  
F. Combustible Materials Specication . . . . . . . . . . . . . . . . . 7  
G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
H. Requirements for the Commonwealth of Massachusetts. . 8  
8 Vent Clearances and Framing  
A. Pipe Clearances to Combustibles . . . . . . . . . . . . . . . . . . 34  
B. Wall Penetration Framing. . . . . . . . . . . . . . . . . . . . . . . . . 34  
C. Install the Ceiling Firestop . . . . . . . . . . . . . . . . . . . . . . . . 35  
D. Install Attic Insulation Shield. . . . . . . . . . . . . . . . . . . . . . . 36  
User Guide  
9 Appliance Preparation  
A. Top Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37  
B. Rear Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38  
C. Installing the Non-combustible Board. . . . . . . . . . . . . . . . 39  
D. Securing and Leveling the Appliance. . . . . . . . . . . . . . . . 39  
2 Operating Instructions  
A. Gas Fireplace Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9  
B. Your Fireplace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9  
C. Fan Kit (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10  
D. Clear Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10  
E. Decorative Doors and Fronts . . . . . . . . . . . . . . . . . . . . . . 10  
F. Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 10  
G. Remote Controls, Wall Controls and Wall Switches. . . . . 10  
H. Before Lighting Fireplace . . . . . . . . . . . . . . . . . . . . . . . . . 10  
I. Lighting Instructions (IPI) . . . . . . . . . . . . . . . . . . . . . . . . . 11  
J. Lighting Instructions (Standing Pilot) . . . . . . . . . . . . . . . . 12  
K. After Fireplace is Lit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13  
L. Frequently Asked Questions . . . . . . . . . . . . . . . . . . . . . . 13  
10 Installing Vent Pipe (DVP and SLP Pipe)  
A. Assemble Vent Sections (DVP Pipe Only) . . . . . . . . . . . . 40  
B. Assemble Vent Sections (SLP Pipe Only) . . . . . . . . . . . . 41  
C. Assemble Slip Sections . . . . . . . . . . . . . . . . . . . . . . . . . . 41  
D. Secure the Vent Sections. . . . . . . . . . . . . . . . . . . . . . . . . 42  
E. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . 42  
F. Install Decorative Ceiling Components (SLP only). . . . . . 43  
G. Install Metal Roof Flashing. . . . . . . . . . . . . . . . . . . . . . . . 44  
H. Assemble and Install Storm Collar. . . . . . . . . . . . . . . . . . 44  
I. Install Vertical Termination Cap . . . . . . . . . . . . . . . . . . . . 45  
J. Install Decorative Wall Components (SLP only). . . . . . . . 45  
K. Heat Shield Requirements for Horizontal Termination . . . 45  
L. Install Horizontal Termination Cap (DVP and SLP Pipe) . 46  
3 Maintenance and Service  
A. Maintenance Tasks-Homeowner . . . . . . . . . . . . . . . . . . . 14  
B. Maintenance Tasks-Qualied Service Technician . . . . . . 15  
Installer Guide  
11 Gas Information  
4 Getting Started  
A. Fuel Conversion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47  
B. Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47  
C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47  
D. High Altitude Installations. . . . . . . . . . . . . . . . . . . . . . . . . 47  
A. Typical Appliance System. . . . . . . . . . . . . . . . . . . . . . . . . 17  
B. Design and Installation Considerations . . . . . . . . . . . . . . 18  
C. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . 18  
D. Inspect Appliance and Components. . . . . . . . . . . . . . . . . 18  
12 Electrical Information  
5 Framing and Clearances  
A. Wiring Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48  
B. IntelliFire Ignition System Wiring . . . . . . . . . . . . . . . . . . . 48  
C. Standing Pilot Ignition System Wiring . . . . . . . . . . . . . . . 48  
D. Optional Accessories Requirements . . . . . . . . . . . . . . . . 48  
E. Electrical Service and Repair. . . . . . . . . . . . . . . . . . . . . . 49  
F. Junction Box Installation. . . . . . . . . . . . . . . . . . . . . . . . . . 50  
G. Wall Switch Installation for Fan (Optional) . . . . . . . . . . . . 50  
A. Selecting Appliance Location . . . . . . . . . . . . . . . . . . . . . . 19  
B. Constructing the Appliance Chase. . . . . . . . . . . . . . . . . . 20  
C. Clearances. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20  
D. Mantel and Wall Projections. . . . . . . . . . . . . . . . . . . . . . . 21  
6 Termination Locations  
A. Vent Termination Minimum Clearances . . . . . . . . . . . . . . 22  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3
13 Finishing  
A. Mantel and Wall Projections. . . . . . . . . . . . . . . . . . . . . . . 51  
B. Facing Material. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51  
C. Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52  
14 Appliance Setup  
A. Remove Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . 53  
B. Remove the Shipping Materials . . . . . . . . . . . . . . . . . . . . 53  
C. Clean the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53  
D. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53  
E. Ember Placement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53  
F. Install the Log Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . 54  
G. Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 56  
H. Install Trim and/or Surround. . . . . . . . . . . . . . . . . . . . . . . 56  
I. Air Shutter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56  
15 Troubleshooting  
A. Standing Pilot Ignition System . . . . . . . . . . . . . . . . . . . . . 57  
B. IntelliFire Ignition System. . . . . . . . . . . . . . . . . . . . . . . . . 59  
16 Reference Materials  
Î A. Appliance Dimension Diagram. . . . . . . . . . . . . . . . . . . . . 61  
B. Vent Components Diagrams . . . . . . . . . . . . . . . . . . . . . . 62  
C. Service Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69  
D. Contact Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73  
Î = Contains updated information.  
4
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Î
B. Limited Lifetime Warranty  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
5
Î
B. Limited Lifetime Warranty (continued)  
6
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Listing and Code Approvals  
1
A. Appliance Certication  
C. BTU Specications  
Maximum  
Input  
BTU/h  
Minimum  
Input  
BTU/h  
Orice  
Size  
(DMS)  
Models  
MODELS: BE-41C / LP, BE-41IPIC / LP  
U.S. (0-2000 FT) or Canada (2000-4500 FT)  
LABORATORY: Underwriters Laboratories, Inc. (UL)  
TYPE: Direct Vent Gas Appliance Heater  
US  
27,000  
24,300  
27,000  
24,300  
18,500  
16,650  
17,300  
15,570  
38  
39  
52  
53  
BE-41C  
BE-41IPIC  
CANADA  
STANDARD: ANSI Z21.88-2000 • CSA 2.33-M98 • UL307B  
US  
BE-41LPC  
BE-41IPILPC  
CANADA  
This product is listed to ANSI standards for “Vented Gas  
Appliance Heaters” and applicable sections of “Gas Burn-  
ing Heating Appliances for Manufactured Homes and  
Recreational Vehicles”, and “Gas Fired Appliances for  
Use at High Altitudes”.  
D. High Altitude Installations  
NOTICE: If the heating value of the gas has been reduced,  
these rules do not apply. Check with your local gas utility  
or authorities having jurisdiction.  
NOTICE: This installation must conform with local codes.  
In the absence of local codes you must comply with the  
National Fuel Gas Code, ANSI Z223.1-latest edition in  
the U.S.A. and the CAN/CGA B149 Installation Codes in  
Canada.  
When installing above 2000 feet elevation:  
• In the USA: Reduce input rate 4% for each 1000 feet  
above 2000 feet.  
• In CANADA: Reduce input rate 10% for elevations  
between 2000 feet and 4500 feet. Above 4500 feet,  
consult local gas utility.  
NOT INTENDED FOR USE AS A PRIMARY HEAT SOURCE.  
This appliance is tested and approved as either supplemen-  
tal room heat or as a decorative appliance. It should not be  
factored as primary heat in residential heating calculations.  
Check with your local gas utility to determine proper  
orice size.  
E. Non-Combustible Materials Specication  
B. Tempered Glass Specications  
Material which will not ignite and burn. Such materials are  
those consisting entirely of steel, iron, brick, tile, concrete,  
slate, glass or plasters, or any combination thereof.  
Hearth & Home Technologies appliances manufactured  
with tempered glass may be installed in hazardous loca-  
tions such as bathtub enclosures as dened by the Con-  
sumerProductSafetyCommission(CPSC).Thetempered  
glass has been tested and certied to the requirements  
of ANSI Z97.1 and CPSC 16 CFR 1202 (Safety Glazing  
Certication Council SGCC# 1595 and 1597. Architectur-  
al Testing, Inc. Reports 02-31919.01 and 02-31917.01).  
Materials that are reported as passing ASTM E 136,  
Standard Test Method for Behavior of Materials in a  
Vertical Tube Furnace at 750 ºC and UL763 shall be  
considered non-combustible materials.  
F. Combustible Materials Specication  
This statement is in compliance with CPSC 16 CFR Sec-  
tion 1201.5 “Certication and labeling requirements”  
which refers to 15 U.S. Code (USC) 2063 stating “…Such  
certicate shall accompany the product or shall otherwise  
be furnished to any distributor or retailer to whom the  
product is delivered.”  
Materials made of or surfaced with wood, compressed pa-  
per, plant bers, plastics, or other material that can ignite  
and burn, whether ame proofed or not, or plastered or  
unplastered shall be considered combustible materials.  
G. Electrical Codes  
Some local building codes require the use of tempered  
glass with permanent marking in such locations. Glass  
meeting this requirement is available from the factory.  
Please contact your dealer or distributor to order.  
NOTICE: This appliance must be electrically wired and  
grounded in accordance with local codes or, in the absence  
of local codes, with National Electric Code ANSI/NFPA  
70-latest edition or the Canadian Electric Code CSA  
C22.1.  
• A 110-120 VAC circuit for this product must be pro-  
tected with ground-fault circuit-interrupter protection,  
in compliance with the applicable electrical codes,  
when it is installed in locations such as in bathrooms  
or near sinks.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
7
Inspection  
Note: The following requirements reference various  
Massachusetts and national codes not contained in this  
document.  
The state or local gas inspector of the side wall horizon-  
tally vented gas fueled equipment shall not approve the  
installation unless, upon inspection, the inspector ob-  
serves carbon monoxide detectors and signage installed  
in accordance with the provisions of 248 CMR 5.08(2)(a)1  
through 4.  
H. Requirements for the Commonwealth of  
Massachusetts  
For all side wall horizontally vented gas fueled equipment  
installed in every dwelling, building or structure used in  
whole or in part for residential purposes, including those  
owned or operated by the Commonwealth and where the  
side wall exhaust vent termination is less than seven (7)  
feet above nished grade in the area of the venting, in-  
cluding but not limited to decks and porches, the following  
requirements shall be satised:  
Exemptions  
The following equipment is exempt from 248 CMR  
5.08(2)(a)1 through 4:  
• The equipment listed in Chapter 10 entitled “Equipment  
Not Required To Be Vented” in the most current edition  
of NFPA 54 as adopted by the Board; and  
• Product Approved side wall horizontally vented gas fu-  
eled equipment installed in a room or structure separate  
from the dwelling, building or structure used in whole or  
in part for residential purposes.  
Installation of Carbon Monoxide Detectors  
At the time of installation of the side wall horizontal vented  
gas fueled equipment, the installing plumber or gas tter  
shall observe that a hard wired carbon monoxide detector  
with an alarm and battery back-up is installed on the oor  
level where the gas equipment is to be installed. In addi-  
tion, the installing plumber or gas tter shall observe that  
a battery operated or hard wired carbon monoxide detec-  
tor with an alarm is installed on each additional level of  
the dwelling, building or structure served by the side wall  
horizontal vented gas fueled equipment. It shall be the  
responsibility of the property owner to secure the services  
of qualied licensed professionals for the installation of  
hard wired carbon monoxide detectors.  
MANUFACTURER REQUIREMENTS  
Gas Equipment Venting System Provided  
When the manufacturer of Product Approved side wall  
horizontally vented gas equipment provides a venting  
system design or venting system components with the  
equipment, the instructions provided by the manufacturer  
for installation of the equipment and the venting system  
shall include:  
• Detailed instructions for the installation of the venting  
system design or the venting system components; and  
In the event that the side wall horizontally vented gas fu-  
eled equipment is installed in a crawl space or an attic,  
the hard wired carbon monoxide detector with alarm and  
battery back-up may be installed on the next adjacent  
oor level.  
• A complete parts list for the venting system design or  
venting system.  
Gas Equipment Venting System NOT Provided  
In the event that the requirements of this subdivision can  
not be met at the time of completion of installation, the  
owner shall have a period of thirty (30) days to comply  
with the above requirements; provided, however, that dur-  
ing said thirty (30) day period, a battery operated carbon  
monoxide detector with an alarm shall be installed.  
When the manufacturer of a Product Approved side wall  
horizontally vented gas fueled equipment does not pro-  
vide the parts for venting the ue gases, but identies  
“special venting systems”, the following requirements  
shall be satised by the manufacturer:  
• The referenced “special venting system” instructions  
shall be included with the appliance or equipment in-  
stallation instructions; and  
Approved Carbon Monoxide Detectors  
Each carbon monoxide detector as required in accor-  
dance with the above provisions shall comply with NFPA  
720 and be ANSI/UL 2034 listed and IAS certied.  
• The “special venting systems” shall be Product Ap-  
proved by the Board, and the instructions for that sys-  
tem shall include a parts list and detailed installation  
instructions.  
Signage  
A metal or plastic identication plate shall be permanent-  
ly mounted to the exterior of the building at a minimum  
height of eight (8) feet above grade directly in line with the  
exhaust vent terminal for the horizontally vented gas fu-  
eled heating appliance or equipment. The sign shall read,  
in print size no less than one-half (1/2) in. in size, “GAS  
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB-  
STRUCTIONS”.  
A copy of all installation instructions for all Product Ap-  
proved side wall horizontally vented gas fueled equip-  
ment, all venting instructions, all parts lists for venting  
instructions, and/or all venting design instructions shall  
remain with the appliance or equipment at the completion  
of the installation.  
See Gas Connection section for additional Common-  
wealth of Massachusetts requirements.  
8
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
User Guide  
Operating Instructions  
2
• Keep remote controls out of reach of children.  
A. Gas Fireplace Safety  
• Never leave children alone near a hot replace, whether  
operating or cooling down.  
WARNING  
HOT SURFACES!  
Teach children to NEVER touch the replace.  
Glass and other surfaces are hot during  
operation AND cool down.  
• Consider not using the replace when children will be  
present.  
Hot glass will cause burns.  
DO NOT touch glass until it is cooled  
• NEVER allow children to touch glass  
• Keep children away  
Contact your dealer for more information, or visit: www.  
hpba.org/staysafe.  
To prevent unintended operation when not using your re-  
place for an extended period of time (summer months,  
vacations, trips, etc):  
• CAREFULLY SUPERVISE children in same room as  
replace.  
• Alert children and adults to hazards of high temperatures.  
• Remove batteries from remote controls.  
• Turn off wall controls.  
High temperatures may ignite clothing or other  
ammable materials.  
• Keep clothing, furniture, draperies and other ammable  
materials away.  
• Unplug 3 volt adapter plug and remove batteries on IPI  
models.  
This appliance has been supplied with an integral barrier  
to prevent direct contact with the xed glass panel. DO  
NOT operate the appliance with the barrier removed.  
• Turn off gas controls valve on standing pilot models.  
When lighting the pilot light on replaces with a standing  
pilot, remove the xed glass assembly so you can de-  
tect presence of residual gas build-up. See Standing Pilot  
Lighting instructions and Maintenance Tasks.  
Contact your dealer or Hearth & Home Technologies if the  
barrier is not present or help is needed to properly install one.  
If you expect that small children or vulnerable adults may  
come into contact with this replace, the following precau-  
tions are recommended:  
B. Your Fireplace  
WARNING! DO NOT operate replace before read-  
ing and understanding operating instructions. Failure  
to operate replace according to operating instructions  
could cause re or injury.  
• Install a physical barrier such as:  
- A decorative rescreen.  
- Adjustable safety gate.  
• Install a switch lock or a wall/remote control with child  
protection lockout feature.  
DECORATIVE DOORS  
(NOT SHOWN)  
SECTION 2.E.  
FIXED GLASS ASSEMBLY  
(NOT SHOWN)  
SECTION 14.G.  
MANTEL  
FAN KIT  
SECTION 2.C  
HEARTH  
CLEAR SPACE  
SECTION 2.D.  
Figure 2.1 General Operating Parts  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
9
C. Fan Kit (optional)  
F. Fixed Glass Assembly  
If desired, a fan kit may be added. Contact your dealer to  
order the correct fan kit.  
See Section 14.G.  
G. Remote Controls, Wall Controls and Wall  
Switches  
D. Clear Space  
WARNING! DO NOT place combustible objects in front  
of the replace or block louvers. High temperatures may  
start a re. See Figure 2.2.  
Follow the instructions supplied with the control installed  
to operate your replace:  
For safety:  
Avoid placing candles and other heat-sensitive objects on  
mantel or hearth. Heat may damage these objects.  
• Install a switch lock or a wall/remote control with child  
protection lockout feature.  
• Keep remote controls out of reach of children.  
See your dealer if you have questions.  
H. Before Lighting Fireplace  
Before operating this replace for the rst time, have a  
qualied service technician:  
• Verify all shipping materials have been removed from  
inside and/or underneath the rebox.  
• Review proper placement of logs, ember material and/or  
other decorative materials.  
• Check the wiring.  
• Check the air shutter adjustment.  
• Ensure that there are no gas leaks.  
• Ensure that the glass is sealed and in the proper position  
and that the integral barrier is in place.  
WARNING! Risk of Fire or Asphyxiation! DO NOT op-  
erate replace with xed glass assembly removed.  
Figure 2.2 Clear Space  
Determine if this replace has a standing pilot or an  
IntelliFire ignition system. Ask your dealer or open control  
access panel, look at gas valve assembly.  
E. Decorative Doors and Fronts  
WARNING! Risk of Fire! Install ONLY doors or fronts  
approved by Hearth & Home Technologies. Unapproved  
doors or fronts may cause replace to overheat.  
• A standing pilot ignition will have a red or black ignitor  
button (refer to Figure 2.3).  
• An IntelliFire ignition system will not have a button.  
This fireplace has been supplied with an integral  
barrier to prevent direct contact with the xed glass  
panel. DO NOT operate the replace with the barrier  
removed.  
RED OR  
BLACK  
BUTTON  
Contact your dealer or Hearth & Home Technologies if  
the barrier is not present or help is needed to properly  
install one.  
For more information refer to the instructions supplied with  
your decorative door or front.  
Figure 2.3 Ignitor Button  
10  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
I. Lighting Instructions (IPI)  
The IPI system may be operated with two D-cell batteries. When using batteries, unplug the transformer. To prolong battery  
life, remove them when using the transformer.  
FOR YOUR SAFETY  
READ BEFORE LIGHTING  
LIGHTING  
INSTRUCTIONS  
(IPI)  
WARNING: If you do not follow these instructions exactly, a re or explosion  
may result causing property damage, personal injury or loss of life.  
1. Turn off all electric power to the appliance.  
• Immediately call your gas supplier  
from a neighbor’s phone. Follow the  
gas supplier’s instructions.  
A. This appliance is equipped with an  
intermittent pilot ignition (IPI) device  
which automatically lights the burn-  
er. DO NOT try to light the burner by  
hand.  
2. This appliance is equipped with an ignition  
device which automatically lights the burner.  
DO NOT try to light the burner by hand.  
• If you cannot reach your gas sup-  
plier, call the re department.  
B. BEFORE LIGHTING, smell all around  
the appliance area for gas. Be sure to  
smell next to the oor because some  
gas is heavier than air and will settle  
on the oor.  
GAS  
VALVE  
C. DO NOT use this appliance if any  
part has been under water. Imme-  
diately call a qualied service tech-  
nician to inspect the appliance and  
to replace any part of the control  
system and any gas control which  
has been under water.  
3. Wait ve (5) minutes to clear out any gas.  
Then smell for gas, including near the oor. If  
you smell gas, STOP! Follow “B” in the Safety  
Information located on the left side of this la-  
bel. If you do not smell gas, go to next step.  
WHAT TO DO IF YOU SMELL GAS  
DO NOT try to light any appliance.  
DO NOT touch any electric switch; do  
not use any phone in your building.  
4. Turn on all electric power to the appliance.  
WARNING: CAUTION:  
5. To light the burner, ip the ON/OFF switch to  
the “ON” position. (The ON/OFF switch may  
include a wall switch if so equipped).  
Hot while in operation. DO NOT touch.  
Keep children, clothing, furniture, gaso-  
line and other liquids having ammable  
vapors away.  
DO NOT CONNECT 110 VAC TO  
THE CONTROL VALVE.  
6. If the appliance will not operate, follow the in-  
structions “To Turn Off Gas to Appliance” and  
call your service technician or gas supplier.  
Improper installation, adjustment, al-  
teration, service or maintenance can  
cause injury or property damage. Re-  
fer to the owner’s information manual  
provided with this appliance.  
DO NOT operate the appliance with  
xed glass assembly removed, cracked  
or broken. Replacement of the xed  
glass assembly should be done by a  
licensed or qualied service person.  
TO TURN OFF  
GAS TO APPLIANCE  
This appliance needs fresh air for  
safe operation and must be installed  
so there are provisions for adequate  
combustion and ventilation air.  
1. Turn wall control or ON/OFF switch to “OFF”.  
NOT FOR USE  
WITH SOLID FUEL  
2. Turn off all electric power to the appliance if  
If not installed, operated, and main-  
tained in accordance with the man-  
ufacturer’s instructions, this product  
could expose you to substances in fuel  
or fuel combustion which are known to  
the State of California to cause can-  
cer, birth defects, or other reproductive  
harm.  
service is to be performed.  
For use with natural gas and propane.  
A conversion kit, as supplied by the  
manufacturer, shall be used to convert  
this appliance to the alternate fuel.  
593-913F  
Also Certied for Installation in a  
Bedroom or a Bedsitting Room.  
For assistance or additional informa-  
tion, consult a qualied installer, ser-  
vice agency or the gas supplier.  
Keep burner and control compartment  
clean. See installation and operating  
instructions accompanying appliance.  
For additional information on operating your  
Hearth & Home Technologies replace, please refer to www.replaces.com.  
Final inspection by  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
11  
J. Lighting Instructions (Standing Pilot)  
LIGHTING  
INSTRUCTIONS  
1. Open control access panel.  
FOR YOUR SAFETY  
READ BEFORE LIGHTING  
WARNING: If you do not follow these instructions exactly, a re or explosion  
may result causing property damage, personal injury or loss of life.  
2. Turn off all electric power to  
the appliance.  
3. Push in gas control knob  
slightly and turn clockwise  
to “OFF”.  
• If you cannot reach your gas sup-  
plier, call the re department.  
A. This appliance has a pilot which  
must be lighted by hand. When  
lighting the pilot, follow these in-  
structions exactly.  
C. Use only your hand to push in or  
turn the gas control knob. Never use  
tools. If the knob will not push in or  
turn by hand, DO NOT try to repair  
it, call a qualied service technician.  
Force or attempted repair may re-  
sult in a re or explosion.  
Note: Knob cannot be turned from “PILOT” to “OFF”  
unless knob is pushed in slightly. DO NOT force.  
B. BEFORE LIGHTING, smell all around  
the appliance area for gas. Be sure to  
smell next to the oor because some  
gas is heavier than air and will settle  
on the oor.  
4. Open the xed glass assembly. You may need to  
remove the decorative front.  
5. Wait ve (5) minutes to clear out any gas. Then  
smell for gas, including near the oor. If you smell  
gas, STOP! Follow “B” in the Safety  
Information located on the left side  
of this label. If you don’t smell gas,  
go to next step.  
D. DO NOT use this appliance if any  
part has been under water. Imme-  
diately call a qualied service tech-  
nician to inspect the appliance and  
to replace any part of the control  
system and any gas control which  
has been under water.  
WHAT TO DO IF YOU SMELL GAS  
DO NOT try to light any appliance.  
DO NOT touch any electric switch; do  
not use any phone in your building.  
6. Find the pilot. The pilot is inside  
combustion chamber next to the  
main burner  
• Immediately call your gas supplier  
from a neighbor’s phone. Follow the  
gas supplier’s instructions.  
7. Turn knob on gas control counterclockwise  
to “PILOT”.  
8. Push in control knob all the way and hold in. Immedi-  
ately depress red or black piezo button. It may require  
several depressions of the red or black piezo button  
until PILOT lights. If PILOT light does not light after  
10 seconds, return to step 3. Continue to hold the  
control knob in for about one minute after the pilot is  
lit. Release knob and it will pop back out. Pilot should  
remain lit. If it goes out, repeat steps 3 through 6.  
WARNING: CAUTION:  
Hot while in operation. DO NOT touch.  
DO NOT CONNECT 110 VAC TO  
Keep children, clothing, furniture, gaso-  
THE CONTROL VALVE.  
line and other liquids having ammable  
Improper installation, adjustment, al-  
vapors away.  
If knob does not pop up when released, stop and  
immediately call your service technician or gas  
supplier.  
teration, service or maintenance can  
DO NOT operate the appliance with  
xed glass assembly removed, cracked  
or broken. Replacement of the xed  
glass assembly should be done by a  
licensed or qualied service person.  
cause injury or property damage. Re-  
fer to the owner’s information manual  
provided with this appliance.  
If the pilot will not stay lit after several tries, turn  
the gas control knob to “OFF” and call your ser-  
vice technician or gas supplier.  
This appliance needs fresh air for  
safe operation and must be installed  
so there are provisions for adequate  
combustion and ventilation air.  
9. Reinstall xed glass assembly. Reinstall decorative  
front.  
NOT FOR USE  
WITH SOLID FUEL  
10. Turn gas control knob counterclockwise  
to “ON”. Close access panel.  
If not installed, operated, and main-  
tained in accordance with the man-  
ufacturer’s instructions, this product  
could expose you to substances in fuel  
or fuel combustion which are known to  
the State of California to cause can-  
cer, birth defects, or other reproductive  
harm.  
For use with natural gas and propane.  
A conversion kit, as supplied by the  
manufacturer, shall be used to convert  
this appliance to the alternate fuel.  
11. Turn on all electric power to the appliance.  
12. To light burner, turn the wall control or on/off switch  
to “ON”.  
TO TURN OFF  
GAS TO APPLIANCE  
1. Turn off all electric power to the appliance if ser-  
Also Certied for Installation in a  
Bedroom or a Bedsitting Room.  
For assistance or additional informa-  
tion, consult a qualied installer, ser-  
vice agency or the gas supplier.  
Keep burner and control compartment  
clean. See installation and operating  
instructions accompanying appliance.  
vice is to be performed.  
2. Open control access panel.  
3. Move switch to “OFF” position.  
For additional information on operating your  
Hearth & Home Technologies replace, please refer to www.replaces.com.  
4. Push in gas control knob slightly and turn clock-  
wise  
to OFF”. DO NOT force.  
5. Close control access panel.  
Final inspection by  
464-903H  
12  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
K. After Fireplace is Lit  
Initial Break-in Procedure  
• The fireplace should be run three to four hours  
continuously on high.  
• Turn the replace off and allow it to completely cool.  
• Remove xed glass assembly. See Section 14.G.  
• Clean xed glass assembly. See Section 3.  
• Replace the xed glass assembly and run continuously  
on high an additional 12 hours.  
This cures the materials used to manufacture the re-  
place.  
NOTICE! Open windows for air circulation during re-  
place break-in.  
• Some people may be sensitive to smoke and odors.  
• Smoke detectors may activate.  
L. Frequently Asked Questions  
ISSUE  
SOLUTIONS  
This is a result of gas combustion and temperature variations. As the appliance warms, this  
condensation will disappear.  
Condensation on the glass  
This is a result of normal operation and the ames will begin to yellow as the appliance is al-  
lowed to burn for 20 to 40 minutes.  
Blue ames  
When rst operated, this appliance may release an odor for the rst several hours. This is caused  
by the curing of the paint and the burning off of any oils remaining from manufacturing. Odor may  
also be released from nishing materials and adhesives used around the appliance.  
Odor from appliance  
Film on the glass  
This is a normal result of the curing process of the paint and logs. Glass should be cleaned  
within 3 to 4 hours of initial burning to remove deposits left by oils from the manufacturing  
process. A non-abrasive cleaner such as gas replace glass cleaner may be necessary. See  
your dealer.  
Noise is caused by metal expanding and contracting as it heats up and cools down, similar to  
the sound produced by a furnace or heating duct. This noise does not affect the operation or  
longevity of the appliance.  
Metallic noise  
Is it normal to see the pilot ame burn In an IntelliFire ignition system it is normal to see the pilot ame, but it should turn off when  
continually?  
ON/OFF is turned off. In a standing pilot system the pilot will always stay on.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
13  
Maintenance and Service  
3
Doors, Surrounds, Fronts  
Any safety screen or guard removed for servicing must be  
replaced prior to operating the replace.  
Frequency: Annually  
By: Homeowner  
When properly maintained, your replace will give you  
many years of trouble-free service. We recommend an-  
nual service by a qualied service technician.  
Tools needed: Protective gloves, stable work surface  
• Assess condition of screen and replace as necessary.  
A. Maintenance Tasks-Homeowner  
• Inspect for scratches, dents or other damage and repair  
as necessary.  
Installation and repair should be done by a qualied service  
technician only. The replace should be inspected before  
use and at least annually by a professional service person.  
• Check that louvers are not blocked.  
• Vacuum and dust surfaces.  
The following tasks may be performed annually by the  
homeowner. If you are uncomfortable performing any of  
the listed tasks, please call your dealer for a service ap-  
pointment.  
Remote Control  
Frequency: Seasonally  
By: Homeowner  
More frequent cleaning may be required due to lint from  
carpeting or other factors. Control compartment, burner  
and circulating air passageway of the replace must be  
kept clean.  
Tools needed: Replacement batteries and remote con-  
trol instructions.  
• Locate remote control transmitter and receiver.  
• Verify operation of remote. Refer to remote control  
operation instructions for proper calibration and setup  
procedure.  
CAUTION! Risk of Burns! The replace should be turned  
off and cooled before servicing.  
Glass Cleaning  
Frequency: Seasonally  
By: Homeowner  
• Place batteries as needed in remote transmitters and  
battery-powered receivers.  
• Place remote control out of reach of children.  
Tools Needed: Protective gloves, glass cleaner, drop  
cloth and a stable work surface.  
If not using your replace for an extended period of time  
(summer months, vacations/trips, etc), to prevent unin-  
tended operation:  
CAUTION! Handle xed glass assembly with care.  
Glass is breakable.  
• Avoid striking, scratching or slamming glass  
• Avoid abrasive cleaners  
• Remove batteries from remote controls.  
• Unplug 3 volt adapter plug on IPI models.  
DO NOT clean glass while it is hot  
• Prepare a work area large enough to accommodate xed  
glass assembly and door frame by placing a drop cloth  
on a at, stable surface.  
Note: Fixed glass assembly and gasketing may have res-  
idue that can stain carpeting or oor surfaces.  
• Remove door or decorative front from replace and set  
aside on work surface.  
• See Section 14.G for instructions to remove xed glass  
assembly.  
• Clean glass with a non-abrasive commercially available  
cleaner.  
- Light deposits: Use a soft cloth with soap and water  
- Heavy deposits: Use commercial fireplace glass  
cleaner (consult with your dealer)  
• Carefully set xed glass assembly in place on replace.  
Hold glass in place with one hand and secure glass  
latches with the other hand.  
• Reinstall door or decorative front.  
14  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
• Replace replace if rebox has been perforated.  
Venting  
Frequency: Seasonally  
By: Homeowner  
Control Compartment and Firebox Top  
Frequency: Annually  
Tools needed: Protective gloves and safety glasses.  
By: Qualied Service Technician  
• Inspect venting and termination cap for blockage or  
obstruction such plants, bird nests, leaves, snow, debris,  
etc.  
Tools needed: Protective gloves, vacuum cleaner, dust  
cloths  
• Vacuum and wipe out dust, cobwebs, debris or pet hair.  
Use caution when cleaning these areas. Screw tips that  
have penetrated the sheet metal are sharp and should  
be avoided.  
• Verify termination cap clearance to subsequent construc-  
tion (building additions, decks, fences, or sheds). See  
Section 6.  
• Inspect for corrosion or separation.  
• Remove all foreign objects.  
• Verify weather stripping, sealing and ashing remains  
• Verify unobstructed air circulation.  
intact.  
Burner Ignition and Operation  
Frequency: Annually  
• Inspect draft shield to verify it is not damaged or missing.  
B. Maintenance Tasks-Qualied Service  
By: Qualied Service Technician  
Technician  
Tools needed: Protective gloves, vacuum cleaner, whisk  
broom, ashlight, voltmeter, indexed drill bit set, and a  
manometer.  
The following tasks must be performed by a qualied ser-  
vice technician.  
Gasket Seal and Glass Assembly Inspection  
Frequency: Annually  
• Verify burner is properly secured and aligned with pilot  
or igniter.  
• Clean off burner top, inspect for plugged ports, corrosion  
or deterioration. Replace burner if necessary.  
By: Qualied Service Technician  
Tools needed: Protective gloves, drop cloth and a stable  
work surface.  
• Replace Glowing embers with new dime-size pieces.  
DO NOT block ports or obstruct lighting paths. Refer to  
Section 14 for proper ember placement.  
• Inspect gasket seal and its condition.  
• Inspect xed glass assembly for scratches and nicks that  
can lead to breakage when exposed to heat.  
• Verify batteries have been removed from battery back-  
up IPI systems to prevent premature battery failure or  
leaking.  
• Conrm there is no damage to glass or glass frame.  
Replace as necessary.  
• Check for smooth lighting and ignition carryover to all  
ports. Verify that there is no ignition delay.  
• Verify that xed glass assembly is properly retained and  
attachment components are intact and not damaged.  
Replace as necessary.  
• Inspect for lifting or other ame problems.  
• Verify air shutter setting is correct. See Section 14 for  
required air shutter setting. Verify air shutter is clear of  
dust and debris.  
Logs  
Frequency: Annually  
• Inspect orice for soot, dirt and corrosion. Verify orice  
size is correct. See Service Parts List for proper orice  
sizing.  
By: Qualied Service Technician  
Tools needed: Protective gloves.  
• Verify manifold and inlet pressures. Adjust regulator as  
required.  
• Inspect for damaged or missing logs. Replace as neces-  
sary. Refer to Section 14 for log placement instructions.  
• Inspect pilot ame pattern and strength. See Figures 3.1  
and 3.2 for proper pilot ame pattern. Clean or replace  
orice spud as necessary.  
• Verify correct log placement and no ame impingement  
causing sooting. Correct as necessary.  
Firebox  
• Inspect thermocouple/thermopile or IPI ame sensing rod  
for soot, corrosion and deterioration. Clean with emery  
cloth or replace as required.  
Frequency: Annually  
By: Qualied Service Technician  
Tools needed: Protective gloves, sandpaper, steel wool,  
cloths, mineral spirits, primer and touch-up paint.  
• Verify thermocouple/thermopile millivolt output. Replace  
pilot as necessary. (Standing pilot only)  
• Inspect for paint condition, warped surfaces, corrosion  
or perforation. Sand and repaint as necessary.  
• Verify that there is not a short in ame sense circuit  
by checking continuity between pilot hood and ame  
sensing rod. Replace pilot as necessary. (IPI only)  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
15  
Figure 3.1 IPI Pilot Flame Patterns  
Figure 3.2 Standing Pilot Flame Patterns  
16  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installer Guide  
Getting Started  
4
A. Typical Appliance System  
NOTICE: Illustrations and photos reect typical installations and are for design purposes only. Illustrations/diagrams are not  
drawn to scale. Actual product may vary from pictures in manual  
HORIZONTAL  
TERMINATION CAP  
(SECTION 10.M )  
Note: Dual venting configurations  
ARE NOT allowed. Appliance MUST  
be vented EITHER vertically OR  
horizontally.  
VERTICAL TERMINATION CAP  
(SECTION 10.J)  
NON-COMBUSTIBLE ROOF FLASHING  
MAINTAINS MINIMUM CLEARANCE  
AROUND PIPE (SECTION 10.G)  
STORM COLLAR  
(SECTION 10.H)  
VENT PIPE PENETRATES ROOF  
PREFERABLY WITHOUT AFFECTING  
ROOF RAFTERS (SECTION 8.C)  
ATTIC INSULATION SHIELD (NOT  
VENT PIPE (SECTIONS 7 and 8)  
SHOWN) MUST BE USED HERE TO  
KEEP INSULATION AWAY FROM  
VENT PIPE IF ATTIC IS INSULATED  
(SECTION 8.D)  
CEILING FIRESTOP  
ON FLOOR OF ATTIC  
(SECTION 8.C)  
FRAMING/HEADER  
(SECTION 5.B)  
FRAMING HEADED OFF  
IN CEILING JOISTS  
(SECTION 8.C)  
OPTIONAL  
WALL SWITCH  
MANTEL AND  
MANTEL LEG  
(SECTION 5.D)  
SURROUND  
HEARTH EXTENSION  
GAS LINE  
(SECTION 11)  
Figure 4.1 Typical System  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
17  
B. Design and Installation Considerations  
D. Inspect Appliance and Components  
Heat & Glo direct vent gas appliances are designed to  
operate with all combustion air siphoned from outside of  
the building and all exhaust gases expelled to the outside.  
No additional outside air source is required.  
• Carefully remove the appliance and components from  
the packaging.  
• The vent system components and decorative doors and  
fronts may be shipped in separate packages.  
Installation MUST comply with local, regional, state and  
national codes and regulations. Consult insurance carrier,  
local building inspector, re ofcials or authorities having  
jurisdiction over restrictions, installation inspection and  
permits.  
• If packaged separately, the log set and appliance grate  
must be installed.  
• Report to your dealer any parts damaged in shipment,  
particularly the condition of the glass.  
Read all of the instructions before starting the instal-  
lation. Follow these instructions carefully during the  
installation to ensure maximum safety and benet.  
Before installing, determine the following:  
• Where the appliance is to be installed.  
• The vent system conguration to be used.  
• Gas supply piping requirements.  
• Electrical wiring requirements.  
WARNING! Risk of Fire or Explosion! Damaged parts  
could impair safe operation. DO NOT install damaged, in-  
complete or substitute components. Keep appliance dry.  
• Framing and nishing details.  
Hearth & Home Technologies disclaims any responsibility for,  
and the warranty will be voided by, the following actions:  
• Whether optional accessories—devices such as a fan,  
wall switch, or remote control—are desired.  
• Installation and use of any damaged appliance or vent  
system component.  
Improper installation, adjustment, alteration, service or  
maintenance can cause injury or property damage. For  
assistance or additional information, consult a qualied  
service technician, service agency or your dealer.  
• Modication of the appliance or vent system.  
• Installation other than as instructed by Hearth & Home  
Technologies.  
• Improper positioning of the gas logs or the glass door.  
• Installation and/or use of any component part not approved  
by Hearth & Home Technologies.  
C. Tools and Supplies Needed  
Before beginning the installation be sure that the following  
tools and building supplies are available.  
Any such action may cause a re hazard.  
Tape measure  
Pliers  
Framing material  
WARNING! Risk of Fire, Explosion or Electric Shock!  
DO NOT use this appliance if any part has been under  
water. Call a qualied service technician to inspect the  
appliance and to replace any part of the control system  
and/or gas control which has been under water.  
High temperature caulking material  
Phillips screwdriver  
Hammer  
Gloves  
Framing square  
Voltmeter  
Plumb line  
Level  
Electric drill and bits (1/4 in.)  
Safety glasses  
Reciprocating saw  
Manometer  
Flat blade screwdriver  
Non-corrosive leak check solution  
1/2 - 3/4 in. length, #6 or #8 Self-drilling screws  
One 1/4 in. female connection (for optional fan).  
18  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Framing and Clearances  
5
NOTICE: Illustrations reect typical installations and are  
FOR DESIGN PURPOSES ONLY. Illustrations/diagrams  
are not drawn to scale. Actual installation may vary due to  
individual design preference.  
A. Selecting Appliance Location  
When selecting a location for the appliance it is important to  
consider the required clearances to walls (see Figure 5.1).  
WARNING! Risk of Fire or Burns! Provide adequate  
clearance around air openings and for service access.  
Due to high temperatures, the appliance should be locat-  
ed out of trafc and away from furniture and draperies.  
A
G
1/2 IN.  
B
ALCOVE  
INSTALLATION  
E
A
B
C
TOP VENT  
ONE 90º ELBOW  
REAR VENT,  
HORIZONTAL TERMINATION,  
TWO ELBOWS  
REAR VENT,  
ONE ELBOW  
REAR VENT,  
NO ELBOWS  
B
B
D
B
D
F
D
H
D
A
51  
B
42  
C
72  
D
E
F
G
H
8
Inches  
56-5/8  
1438  
22  
17-3/4  
451  
See Section D.  
Mantel Projections  
Millimeters  
1295  
1067  
1829  
559  
203  
Figure 5.1 Appliance Locations  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
19  
To further prevent drafts, the wall shield and ceiling re-  
stops should be caulked with high temperature caulk to  
seal gaps. Gas line holes and other openings should be  
caulked with high temperature caulk or stuffed with un-  
faced insulation. If the appliance is being installed on a  
cement surface, a layer of plywood may be placed under-  
neath to prevent conducting cold up into the room.  
B. Constructing the Appliance Chase  
A chase is a vertical box-like structure built to enclose the  
gas appliance and/or its vent system. In cooler climates  
the vent should be enclosed inside the chase.  
NOTICE: Treatment of ceiling restops and wall shield  
restops and construction of the chase may vary with the  
type of building. These instructions are not substitutes  
for the requirements of local building codes. Therefore,  
you MUST check local building codes to determine the  
requirements to these steps.  
C. Clearances  
NOTICE: Install appliance on hard metal or wood surfaces  
extending full width and depth. DO NOT install directly  
on carpeting, vinyl, tile or any combustible material other  
than wood.  
Chases should be constructed in the manner of all out-  
side walls of the home to prevent cold air drafting prob-  
lems. The chase should not break the outside building  
envelope in any manner.  
WARNING! Risk of Fire! Maintain specied air space  
clearances to appliance and vent pipe:  
Walls, ceiling, base plate and cantilever oor of the chase  
should be insulated. Vapor and air inltration barriers  
should be installed in the chase as per regional codes for  
the rest of the home. Additionally, in regions where cold  
air inltration may be an issue, the inside surfaces may be  
sheetrocked and taped for maximum air tightness.  
• Insulation and other materials must be secured to prevent  
accidental contact.  
• The chase must be properly blocked to prevent blown  
insulation or other combustibles from entering and  
making contact with replace or chimney.  
• Failure to maintain airspace may cause overheating and  
a re.  
A
E
J
F
B
H
C
D
G
I
*MINIMUM FRAMING DIMENSIONS  
A
B
C**  
D
E
F
G
H
I
J
Rough  
Opening  
(Vent Pipe)  
Rough  
Opening  
(Height)  
Rough  
Opening  
(Depth)  
Rough  
Opening  
(Width)  
Clearance  
to Ceiling  
Combustible  
Floor  
Combustible  
Flooring  
Behind  
Appliance  
Sides of  
Appliance  
Front of  
Appliance  
Inches  
10  
38-1/2  
978  
22  
42  
26-5/8  
676  
0
0
0
0
1/2  
13  
1/2  
13  
36  
Millimeters  
254  
559  
1067  
915  
* Adjust framing dimensions for interior sheathing (such as sheetrock)  
C** Add 12 inches for rear venting with one 90º elbow.  
Figure 5.2 Clearances to Combustibles  
20  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Combustible Mantel Legs or Wall Projections  
D. Mantel and Wall Projections  
WARNING! Risk of Fire! Comply with all minimum clear-  
ances as specied. Framing or nishing material closer than  
the minimums listed must be constructed entirely of noncom-  
bustible materials (i.e., steel studs, concrete board, etc).  
INTERIOR WALL  
TOP VIEW  
Combustible Mantels  
TO CEILING  
18  
A
B
12  
11  
FIREPLACE OPENING  
10  
32  
9
8
25  
7
MANTEL LEG OR WALL PROJECTIONS  
19  
6
18  
5
17  
If A minimum is ____, then B maximum is_____.  
4
16  
3
Inches  
15  
2-7/16 3-7/16 4-7/16 5-7/16 6-7/16 7-7/16  
A
Millimeters  
14  
62  
1
87  
2
113  
3
138  
4
164  
5
189  
13  
Inches  
B
12  
Millimeters  
25  
51  
76  
102  
127  
2-1/2  
11  
10  
Figure 5.4 Clearances to Mantel Legs or Wall Projections  
(Acceptable on both sides of opening.)  
5
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
Note: All measurements in inches.  
Note: Measurement is taken from top of the  
opening, NOT the top of the replace.  
Figure 5.3 Minimum Vertical and Maximum Horizontal  
Dimensions of Combustibles  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
21  
Termination Locations  
6
A. Vent Termination Minimum Clearances  
A
B
6 in. (minimum) up to 20 in.  
152 mm/508 mm  
18 in. minimum  
457 mm  
WARNING  
20 in. and over  
0 in. minimum  
Fire Risk.  
Gas, Wood or Fuel Oil  
Termination Cap  
Maintain vent clearance to combustibles as  
specied.  
DO NOT pack air space with insulation or other  
materials.  
Failure to keep insulation or other materials away  
B
from vent pipe may cause overheating and re.  
A*  
HORIZONTAL  
OVERHANG  
Gas  
Termination  
Cap **  
2 FT.  
20 INCHES MIN.  
VERTICAL  
MIN.  
WALL  
LOWEST  
DISCHARGE  
OPENING  
GAS DIRECT VENT  
TERMINATION CAP  
X
12  
*
If using decorative cap cover(s), this distance may need to be  
increased. Refer to the installation instructions supplied with the  
decorative cap cover.  
ROOF PITCH  
IS X/ 12  
H (MIN.) - MINIMUM HEIGHT FROM ROOF  
TO LOWEST DISCHARGE OPENING  
** In a staggered installation with both gas and wood terminations, the  
wood termination cap must be higher than the gas termination cap.  
Figure 6.2 Staggered Termination Caps  
Roof Pitch  
H (Min.) Ft.  
Flat to 6/12...........................................................1.0*  
Over 6/12 to 7/12.................................................1.25*  
Over 7/12 to 8/12.................................................1.5*  
Over 8/12 to 9/12.................................................2.0*  
Over 9/12 to 10/12...............................................2.5  
Over 10/12 to 11/12.............................................3.25  
Over 11/12 to 12/12.............................................4.0  
Over 12/12 to 14/12.............................................5.0  
Over 14/12 to 16/12.............................................6.0  
Over 16/12 to 18/12.............................................7.0  
Over 18/12 to 20/12.............................................7.5  
Over 20/12 to 21/12.............................................8.0  
* 3 foot minimum in snow regions  
Figure 6.1 Minimum Height From Roof To Lowest Discharge  
Opening  
22  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
O
N
V
P
L
K
K
Electrical  
Service  
R
V
V
E
C
V
Q
A
F
C
(See Note 2)  
V
Measure vertical clearances from this surface.  
B
J
U.S  
(3 FT.)  
B
V
V
V
B
V
i
M
D
V
G
V
X
A
H or i  
Measure horizontal clearances from this surface.  
= VENT TERMINAL  
X
= AIR SUPPLY INLET  
= AREA WHERE TERMINAL IS NOT PERMITTED  
V
A
B
= 12 inches.................clearances above grade, veranda,  
J** = 7 ft.......................... clearance above paved  
(See Note 1)  
(See Note 1)  
porch, deck or balcony  
sidewalk or a paved driveway  
located on public property  
= 12 inches.................clearances to window or door  
that may be opened, or to perma-  
K
L
=
6 inches.................clearance from sides of electri-  
(See Note 5)  
cal service  
nently closed window. (Glass)  
= 12 inches................clearance above electrical  
C
= 18 inches.................vertical clearance to unventilated  
soft or to ventilated soft located  
above the terminal  
(See Note 5)  
service  
Covered Alcove Applications  
M*** = 18 inches .............clearance under veranda, porch,  
deck, balcony or overhang  
30 inches.................for vinyl clad softs and below  
electrical service  
D
E
F
= 9 inches...................clearance to outside corner  
= 6 inches...................clearance to inside corner  
42 inches ......... vinyl  
N
O
P
= 6 inches ........... non-vinyl sidewalls  
12 inches ......... vinyl sidewalls  
= 18 inches ......... non-vinyl soft and overhang  
42 inches ......... vinyl soft and overhang  
= 8 ft.  
= 3 ft. (Canada)..........not to be installed above a gas  
meter/regulator assembly within 3  
feet (90 cm) horizontally from the  
center-line of the regulator  
G
H
= 3 ft...........................clearance to gas service regulator  
vent outlet  
= 9 inches (U.S.A.)  
QMIN  
3 feet  
6 feet  
9 feet  
12 feet  
RMAX  
12 inches (Canada) clearance to non-mechanical  
1 cap  
2 caps  
3 caps  
4 caps  
2 x Q ACTUAL  
1 x Q ACTUAL  
2/3 x Q ACTUAL  
1/2 x Q ACTUAL  
(See Note 2)  
air supply inlet to building or the  
combustion air inlet to any other  
appliance  
i
= 3 ft. (U.S.A.)  
6 ft. (Canada)...........clearance to a mechanical (pow-  
(See Note 2)  
ered) air supply inlet  
QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL  
** a vent shall not terminate directly above a sidewalk or paved driveway  
which is located between two single family dwellings and serves both  
dwellings.  
Note 3: Local codes or regulations may require different  
clearances.  
*** only permitted if veranda, porch, deck or balcony is fully open on a  
Note 4: Termination caps may be hot. Consider their proximity to  
doors or other trafc areas.  
minimum of 2 sides beneath the oor, or meets Note 2.  
Note 1: On private property where termination is less than 7 feet above a  
sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap  
shield is suggested. (See vents components page)  
Note 5: Location of the vent termination must not interfere with  
access to the electrical service.  
In the U.S and Canada: Vent system termination is NOT permitted  
in screened porches.  
Note 2: Termination in a covered alcove space (spaces open only on one  
side and with an overhang) are permitted with the dimensions specied  
for vinyl or non-vinyl siding and softs. 1. There must be 3 feet minimum  
between termination caps. 2. All mechanical air intakes within 10 feet  
of a termination cap must be a minimum of 3 feet below the termination  
cap. 3. All gravity air intakes within 3 feet of a termination cap must be a  
minimum of 1 foot below the termination cap.  
Vent system termination is permitted in porch areas with two or more  
sides open. You must follow all side walls, overhang and ground  
clearances as stated in the instructions.  
Heat & Glo assumes no responsibility for the improper performance  
of the appliance when the venting system does not meet these  
requirements.  
Figure 6.3 Minimum Clearances for Termination  
CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
23  
Vent Information and Diagrams  
7
A. Approved Pipe  
This appliance is approved for use with Hearth & Home  
Technologies DVP or SLP venting systems. Refer to Sec-  
tion 16B for vent component information.  
DO NOT mix pipe, ttings or joining methods from differ-  
ent manufacturers.  
Vertical  
The pipe is tested to be run inside an enclosed wall.  
There is no requirement for inspection openings at each  
joint within the wall.  
8-1/2 in.  
WARNING! Risk of Fire or Asphyxiation. This appli-  
ance requires a separate vent. DO NOT vent to a pipe  
serving a separate solid fuel burning appliance.  
B. Vent Table Key  
Horizontal  
The abbreviations listed in this vent table key are used in  
the vent diagrams.  
Figure 7.1  
Symbol  
Description  
D. Measuring Standards  
First section (closest to appliance) of vertical length  
V1  
Vertical and horizontal measurements listed in the vent  
diagrams were made using the following standards.  
Second section of vertical length  
V2  
H1  
H2  
First section (closest to appliance) of horizontal length  
Subsequent sections of horizontal length  
• Pipe measurements are shown using the effective length  
of pipe (see Figure 7.2).  
• Horizontal terminations are measured to the outside  
mounting surface (ange of termination cap) (see Figure  
6.3).  
C. Use of Elbows  
• Vertical terminations are measured to bottom of  
termination cap.  
Diagonal runs have both vertical and horizontal vent as-  
pects when calculating the effects. Use the rise for the  
vertical aspect and the run for the horizontal aspect (see  
Figure 7.1).  
• Horizontal pipe installed level with no rise.  
Two 45º elbows may be used in place of one 90º elbow.  
On 45º runs, one foot of diagonal is equal to 8-1/2 in. (216  
mm) horizontal run and 8-1/2 in. (216 mm) vertical run. A  
length of straight pipe is allowed between two 45º elbows  
(see Figure 7.1).  
Effective Length  
Pipe  
Inches  
4
Millimeters  
102  
DVP4  
DVP6  
6
12  
152  
305  
DVP12  
DVP24  
DVP36  
DVP48  
DVP6A  
Effective  
Height/Length  
24  
610  
36  
914  
48  
1219  
76 to 152  
3 to 6  
DVP12A 3 to 12 76 to 305  
DVP12MI 3 to 12 76 to 305  
DVP24MI 3 to 24 76 to 610  
Figure 7.2 DVP Pipe Effective Length  
24  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
E. Vent Diagrams  
Top Vent - Horizontal Termination  
WARNING  
Fire Risk. Explosion Risk.  
Note: The 6000 series replaces can adapt to SLP series vent  
pipe, if desired.  
Do NOT pack insulation or other combustibles  
between ceiling restops.  
When venting off the top of the unit, use a DVP-2SL adapter and a  
minimum 48 inch vertical section of SLP series vent pipe.  
• ALWAYS maintain specied clearances around  
venting and restop systems.  
A DVP-SLP24 adapter may also be used with a 24 inch vertical  
section of SLP series vent pipe.  
• Install wall shield and ceiling restops as speci-  
ed.  
After the 48 inch vertical section, the venting table rules must be  
followed. The rst 48 inch vertical section is NOT counted as part  
of the vertical components in the table. It is still counted as part of  
the overall maximum run. All venting table rules for the vent run  
must still be followed.  
Failure to keep insulation or other material away  
from vent pipe may cause re.  
WARNING  
Example: DVP pipe 3 ft. min. vertical = 11 ft. max. horizontal  
Fire Risk.  
SLP pipe 7 ft. min. vertical = 11 ft. max. horizontal  
• When using DVP-HRC-SS and DVP-HRC-ZC-  
SS termination caps on top vented replaces, a  
6 inch minimum vertical vent section is required  
before installing rst elbow.  
Top Vent - Horizontal Termination  
One Elbow  
V1 Minimum  
H1 Maximum  
Elbow only  
2 ft  
610 mm  
914 mm  
1.8 m  
1 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
3 ft.  
6 ft.  
2 ft.  
3 ft.  
4 ft.  
11 ft.  
20 ft.  
3.4 m  
6.1 m  
V1  
V1 + H1 = 40 ft. (12.2 m) Maximum  
H1 = 20 ft. (6.1 m) Maximum  
H1  
Note: For corner installations: A 6 inch (152  
mm) section of straight pipe may need to  
be attached to the appliance before a 90º  
elbow, to allow the vent pipe to clear the top  
standoffs.  
Figure 7.3  
V1 Minimum  
H1 + H2 Maximum  
Two Elbows  
Note: For corner installations: A 6 inch  
(152 mm) section of straight pipe may  
need to be attached to the appliance  
before a 90º elbow, to allow the vent  
pipe to clear the top standoffs.  
Elbow only  
1 ft.  
2 ft.  
305 mm  
610 mm  
610 mm  
1.2 m  
6 in.  
152 mm  
305 mm  
610 mm  
914 mm  
1.2 m  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
5 ft.  
2 ft.  
4 ft.  
9 ft.  
2.7 m  
18 ft.  
20 ft.  
5.5 m  
1.5 m  
6.1 m  
V1 + H1 + H2 = 40 ft. (12.2 m) Maximum  
H1 + H2 = 20 ft. (6.1 m) Maximum  
V1  
H2  
H1  
INSTALLED  
HORIZONTALLY  
Figure 7.4  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
25  
Top Vent - Horizontal Termination - (continued)  
Three Elbows  
V1 Min.  
H1 Max.  
V2 Min.  
0 mm  
H2 Max.  
305 mm  
Elbow only  
2 ft.  
610 mm  
914 mm  
1.8 m  
0 in.  
6 in.  
1 ft.  
1 ft.  
2 ft.  
6 ft.  
6 in.  
152 mm  
305 mm  
3 ft  
152 mm  
305 mm  
610 mm  
1.8 m  
1 ft.  
2 ft.  
3 ft.  
6 ft.  
610 mm  
914 mm  
11 ft.*  
16 ft *  
3.4 m*  
4.9 m*  
2 ft.  
3 ft.  
610 mm  
914 mm  
10 ft.*  
14 ft.*  
3.1 m*  
4.3 m*  
*H1 + H2 = 20 ft. (6.1 m) Maximum  
V1 + V2 + H1 + H2 = 40 ft. (12.2 m) Maximum  
H2  
V2  
V1  
H1  
Figure 7.5  
26  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Top Vent - Vertical Termination  
No Elbow  
Flue Restrictor Instructions  
1. Remove exhaust shield using a 1/4 inch nut driver by  
removing the four screws securing it in place (see Figure  
7.7).  
V1 = 40 ft. Max. (12.4 m)  
V1 = 3 ft. Min. (914 mm)  
Note: If installing a vertical vent/  
termination off the top of the ap-  
pliance, the ue restrictor should  
be used.  
EXHAUST  
SHIELD  
FLUE  
RESTRICTOR  
Figure 7.7  
2. Break the ue restrictor into two pieces. Do this by  
bending the part back and forth until it breaks (see  
Figure 7.8).  
V1  
BREAK  
HERE  
Figure 7.6  
Figure 7.8 Flue Restrictor  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
27  
4. Center the Flue Restrictor on vent and secure in place  
by using two self-tapping screws (see Figure 7.10).  
Top Vent - Vertical Termination (continued)  
3. Match the amount of vertical you have in the system  
with the chart to nd the appropriate position to set the  
Flue Restrictor (see Figure 7.9).  
5. Reinstall the Exhaust Shield.  
TOP VENT  
NG  
REAR VENT  
Vertical  
4 ft.  
1
2
3
4 5  
LP  
NG  
LP  
No  
No  
No  
1-1  
2-2  
3-3  
3-4  
3-4  
4-4  
4-4  
5-4  
Restrictor Restrictor Restrictor  
No  
8 ft.  
1-2  
3-2  
3-3  
3-3  
3-4  
3-4  
4-4  
1-1  
2-2  
3-3  
3-3  
3-4  
3-4  
4-4  
Restrictor  
1-2  
SETTING  
15 ft.  
20 ft.  
25 ft.  
30 ft.  
35 ft.  
2-3  
2-3  
3-3  
3-3  
3-4  
1
2
3
4 5  
Figure 7.10  
40 ft.  
Figure 7.9  
Note: If the DVP-2SL or DVP-SLP24 adapter is used with  
SLP pipe, you MUST subtract one number from the table  
above.  
Example: Top vent 40 ft vertical with DVP pipe = 5-4  
Top vent 40 ft vertical with SLP pipe = 4-3  
V1  
Elbow only  
6 in. 152 mm 6 ft.  
H1 Maximum  
V2 V1 + V2 Min.  
Two Elbows  
2 ft. 610 mm  
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
1.8 m  
3.4 m  
4.9 m  
6.1 m  
2 ft.  
3 ft.  
4 ft.  
610 mm 11 ft.  
914 mm 16 ft.  
1.2 m  
20 ft  
V1 + V2 + H1 = 50 ft (15.2 m) Maximum  
*No specic restrictions on this value EXCEPT  
V1 + V2 + H1 cannot exceed 50 ft (15.2 m)  
V2  
V1  
H1  
Figure 7.11  
28  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Top Vent - Vertical Termination - (continued)  
V1  
H1 + H2  
V2  
*
V1 + V2 Minimum H1 + H2 Maximum  
Three Elbows  
Elbow only  
1 ft.  
305 mm  
610 mm  
610 mm  
1.2 m  
*
*
*
*
*
*
*
*
*
*
*
*
1 ft.  
2 ft.  
2 ft.  
4 ft.  
9 ft.  
18 ft.  
305 mm  
610 mm  
610 mm  
1.2 m  
6 in.  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
152 mm  
305 mm  
610 mm  
914 mm  
1.2 m  
2 ft.  
2 ft.  
4 ft.  
9 ft.  
18 ft.  
*
*
*
2.7 m  
*
2.7 m  
5.5 m  
*
5.5 m  
H1 + H2 = 20 ft (6.1 m) Maximum  
V1 + V2 + H1 + H2 = 40 ft (12.2 m) Maximum  
V2  
H1  
H2  
V1  
INSTALLED  
HORIZONTALLY  
Figure 7.12  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
29  
Rear Vent - Horizontal Termination  
No Elbow  
H1 = 16 in. (406 mm) Maximum  
H1  
Figure 7.13  
One 45º Elbow  
Do not use a 45º elbow in corner installations.  
Use two 90º elbows instead.  
H1  
Figure 7.14  
30  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Rear Vent - Horizontal Termination - (continued)  
H1 Maximum  
V1 Minimum  
H2  
305 mm  
H1 + H2 Maximum  
Two Elbows  
Back to Back  
90º Elbows  
1 ft.  
305 mm  
1 ft.  
2 ft.  
610 mm  
2 ft.  
3 ft.  
3 ft.  
3 ft.  
3 ft.  
610 mm 6 in.  
914 mm 1 ft.  
914 mm 2 ft.  
914 mm 3 ft.  
152 mm  
305 mm  
610 mm  
914 mm  
1.2 m  
2 ft.  
2 ft.  
610 mm  
610 mm  
1.2 m  
4 ft.  
5 ft.  
1.2 m  
1.5 m  
2.1 m  
3.7 m  
6.1 m*  
4 ft.  
7 ft.  
9 ft.  
2.7 m  
12 ft.  
20 ft.*  
914 mm  
4 ft  
18 ft.  
5.5 m  
V1 + H1 + H2 = 40 ft (12.2 m) Maximum  
H1 = 3 ft (914 mm) Maximum  
*H1 + H2 = 20 ft (6.1 m) Maximum  
V1  
H2  
H1  
Figure 7.15  
H1 Maximum  
V1 Minimum  
H2+ H3  
305 mm  
H1+ H2+ H3 Max.  
Three Elbows  
Back to Back  
90º Elbows  
1 ft. 305 mm  
1 ft.  
2 ft.  
610 mm  
2 ft. 610 mm 6 in.  
152 mm 1.5 ft. 457 mm 3.5 ft.  
1.1 m  
1.5 m  
2.1 m  
3.7 m  
4.6 m  
3 ft. 914 mm  
3 ft. 914 mm  
3 ft. 914 mm  
3 ft. 914 mm  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
2 ft.  
4 ft.  
610 mm  
1.2 m  
5 ft.  
7 ft.  
9 ft.  
2.7 m  
12 ft.  
15 ft.  
INSTALLED  
HORIZONTALLY  
12 ft.  
3.7 m  
V1+ H1+ H2+ H3= 40 ft (12.2 m) Maximum  
H1= 3 ft (914 mm) Maximum  
H1+ H2+ H3= 20 ft (6.1 m) Maximum  
H3  
H2  
V1  
H1  
Figure 7.16  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
31  
Rear Vent - Vertical Termination  
One Elbow  
V1 Minimum  
6 in. 152 mm  
H1 Maximum  
2 ft. 610 mm  
3 ft. 914 mm  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
5 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
5 ft.  
7 ft.  
8 ft  
1.5 m  
2.1 m  
2.4 m  
2.4 m  
1.5 m  
8 ft  
V1 + H1 = 40 ft (12.2 m) Maximum  
H1 = 8 ft (2.4 m) Maximum  
V1  
H1  
Figure 7.17  
H1 + H2 Maximum  
Back to Back 90º Elbows  
V1 Minimum  
Two Elbows  
3 ft.  
914 mm  
2 ft  
4 ft  
610 mm  
1.2 m  
6 ft.  
9 ft.  
1.8 m  
2.7 m  
3.7 m  
4.6 m  
6 ft.  
8 ft.  
1.8 m  
2.4 m  
12 ft.  
15 ft.  
V1 + H1 = 40 ft (12.2 m) Maximum  
H1 + H2 = 8 ft (2.4 m) Maximum  
V2  
INSTALLED  
HORIZONTALLY  
H1  
H2  
Figure 7.18  
32  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Rear Vent - Vertical Termination - (continued)  
H1 Maximum  
V1 Minimum  
H2  
H1 + H2 Maximum  
Three Elbows  
610  
mm  
2 ft.  
610 mm  
6 in.  
152 mm  
2 ft.  
4 ft.  
1.2 m  
3 ft.  
5 ft.  
7 ft.  
8 ft  
914 mm  
1.5 m  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
4 ft.  
6 ft.  
1.2 m  
1.8 m  
2.4 m  
3.1 m  
7 ft.  
11 ft.  
15 ft.  
18 ft.  
2.1 m  
3.4 m  
4.6 m  
5.5 m  
2.1 m  
8 ft.  
V2  
2.4 m  
10 ft.  
H1= 8 ft (2.4 m) Max.  
V1 + V2 + H1 + H2= 40 ft (12.2 m) Max.  
H1 + H2 = 20 ft (6.1 m) Max.  
H2  
V1  
Figure 7.19  
H1  
H1  
H2  
H3  
V1 Minimum  
H1 + H2 + H3 Maximum  
Three Elbows  
*
*
*
*
*
*
*
*
*
*
*
*
8 ft.  
9 ft.  
2.4 m  
2.7 m  
3.1 m  
3.1 m  
6 ft.  
7 ft.  
8 ft.  
8 ft.  
1.8 m  
2.1 m  
2.4 m  
2.4 m  
10 ft.  
10 ft.  
V1 + H1 + H2 + H3 = 40 ft. (12.2 m) Maximum  
*No specic restrictions on this value EXCEPT  
V1  
V1 + H1 + H2 + H3 cannot exceed 40 ft. (12.2 m) Maximum  
H1 + H2 + H3 = 8 ft. (2.4 m) Maximum  
H3  
H1  
H2  
INSTALLED  
Figure 7.20  
HORIZONTALLY  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
33  
Vent Clearances and Framing  
8
A. Pipe Clearances to Combustibles  
B. Wall Penetration Framing  
Combustible Wall Penetration  
WARNING! Risk of Fire! Maintain air space clearance to  
vent. DO NOT pack insulation or other combustibles:  
Whenever a combustible wall is penetrated, you must  
frame a hole for the wall shield restop(s). The wall shield  
restop maintains minimum clearances and prevents cold  
air inltration.  
• Between ceiling restops  
• Between wall shield restops  
• Around vent system  
• The opening must be framed on all four sides using the  
same size framing materials as those used in the wall  
construction.  
Failure to keep insulation or other material away from  
vent pipe may cause over heating and re.  
• SLP pipe - A wall shield restop must be placed on each  
side of an interior wall. A minimum 1-1/2 in. (38 mm)  
overlap of attached heat shields must be maintained.  
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).  
DVP heat shield - designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184  
mm) thick.  
• DVP pipe - A wall shield restop is required on one side  
only on interior walls. If your local inspector requires a  
wall shield restop on both sides, then both wall shield  
restops must have a heat shield (refer to Section 16.B.)  
attached to them.  
• If wall thickness is less than 4 in. the existing heat shields must be field trimmed. If  
wall thickness is greater than 7-1/4 in. a DVP-HSM-B will be required.  
SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to  
194 mm thick).  
• If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed.  
If wall thickness is greater than 7-5/8 in. a DVP-HSM-B will be required.  
• See Section 10.M. for information for regarding the in-  
stallation of a horizontal termination cap.  
(DVP-SLP Pipe Shown)  
Non-Combustible Wall Penetration  
Heat  
Shield  
3 in. (76 mm)  
top clearance *  
Heat  
If the hole being penetrated is surrounded by noncom-  
bustible materials such as concrete, a hole with diameter  
one inch greater than the pipe is acceptable.  
3 in. (76 mm)  
top clearance  
Shield  
1 in. (25 mm)  
clearance around  
vertical sections  
Whenever a non-combustible wall is penetrated, the wall  
shield restop is only required on one side and no heat  
shield is necessary.  
1 in. (25 mm)  
clearance  
bottom & sides  
Wall  
Shield  
Firestop  
WALL  
3 in. (76 mm)  
top clearance *  
Heat  
Shield  
Heat  
Shield  
10 in.  
12 in.  
12 in.  
1 in. (25 mm)  
clearance  
bottom & sides  
C
Wall  
Shield  
Firestop  
D
10 in.  
B*  
WALL  
A*  
* When using SLP or SL-D pipe, minimum clearances from the vent pipe to combus-  
tible materials at inside wall firestops are: Top: 2-1/2 in. (64 mm)  
Bottom: 1/2 in. (13 mm)  
Sides: 1 in. (25 mm)  
Figure 8.1 Horizontal Venting Clearances To Combustible  
Materials  
A*  
B*  
27-7/8  
C
D
Inches  
42-3/4  
41-3/4  
26-7/8  
* Shows center of vent framing hole for top or rear venting. The center of the  
hole is one (1) in. (25.4 mm) above the center of the horizontal vent pipe.  
Figure 8.2 Wall Penetration  
Note: When terminating horizontally off the top of the unit  
using SLP pipe, a 10 in. x 10 in. framing hole is required.  
34  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
C. Install the Ceiling Firestop  
A ceiling restop MUST be used between  
oors and attics.  
DVP pipe only - Frame an opening 10 in.  
by 10 in. (254 mm by 254 mm) whenever  
the vent penetrates a ceiling/oor (see  
Figure 8.3).  
ATTIC ABOVE  
SLP pipe only - Frame opening 9 in. x 9  
in. (229 mm x 229 mm) whenever the vent  
penetrates a ceiling/oor (see Figure 8.3).  
• Frame the area with the same sized lumber  
A
as used in ceiling/oor joist.  
• The ceiling restop may be installed above or  
below the ceiling joists when installed with a  
attic insulation shield. It must be under joists  
between oors that are not insulated. Refer  
to Figure 8.4.  
• Secure with three fasteners on each side.  
A
WARNING! Risk of Fire! DO NOT pack insu-  
lation around the vent. Insulation must be kept  
back from the pipe to prevent overheating.  
A
PIPE  
DVP  
SLP  
10 in. (254 mm)  
9 in. (229 mm)  
Figure 8.3 Installing Ceiling Firestop  
INSTALL ATTIC INSULATION SHIELDS  
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM  
3 FASTENERS  
PER SIDE  
CEILING FIRESTOP  
CEILING FIRESTOP  
INSTALLED BELOW CEILING  
INSTALLED ABOVE CEILING  
Figure 8.4 Installing the Attic Shield  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
35  
D. Install Attic Insulation Shield  
BEND ALL TABS INWARD 90°  
TO MAINTAIN CLEARANCE  
AND PREVENT INSULATION  
FROM FALLING INSIDE  
WARNING! Fire Risk. DO NOT allow loose materials or  
insulation to touch vent. Hearth & Home Technologies  
Inc. requires the use of an attic shield.  
The National Fuel Gas Code ANSI Z223.1 and NFPA 54  
requires an attic shield constructed of 26 gauge minimum  
metal that extends at least 2 in. (51 mm) above insulation.  
BEND 3 TABS  
OUTWARD TO  
Attic shields must meet specied clearance and be se-  
cured in place.  
FASTEN TO CEILING  
FIRESTOP-BEND  
REMAINING TABS  
INWARD 90 DEGREES  
TO MAINTAIN  
Flat Ceiling Installation  
• Remove one shield from box.  
NOTICE: Cut previously installed batt insulation to make  
room for the attic insulation shield.  
CLEARANCE  
INSERT 3  
SCREWS  
• Wrap shield around pipe if pipe is already installed in  
area to be insulated.  
• Match the three holes in each side and fasten with three  
screws to form a tube.  
• Bend three tabs on the bottom of the shield outward to  
allow attachment to the ceiling restop.  
Figure 8.5 Attic Insulation Shield  
• Bend the remaining bottom tabs inward 90º to maintain  
the air space between the pipe and the shield. Set the  
shield on the ceiling restop and attach to the restop.  
• Bend all tabs inward 90º around the top of the shield.  
These tabs must be used to prevent blown insulation  
from getting between the shield and vent pipe, and to  
maintain air space clearance.  
Vaulted Ceiling Installation  
• Remove one shield from box.  
NOTICE: Cut previously installed batt insulation to make  
room for the attic insulation shield.  
• Cut the attic insulation shield (if application is for vaulted  
ceiling) to t your ceiling pitch. Snip cut edge to recreate  
1 in. bend tabs all the way around the bottom.  
• Wrap shield around pipe if pipe is already installed in  
area to be insulated.  
• Match the three holes in each side and fasten with three  
screws to form a tube.  
• Bend three tabs on the bottom of the shield outward to  
allow attachment to the ceiling restop.  
• Bend the remaining bottom tabs inward 90º to maintain  
the air space between the pipe and the shield. Set the  
shield on the ceiling restop and attach to the restop.  
• Bend all tabs inward 90º around the top of the shield.  
These tabs must be used to prevent blown insulation  
from getting between the shield and vent pipe, and to  
maintain air space clearance.  
36  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Appliance Preparation  
9
A. Top Vent  
CAUTION! Risk of Cuts, Abrasions or Flying Debris.  
Wear protective gloves and safety glasses during instal-  
lation. Sheet metal edges are sharp.  
NOTICE: Once appliance is set up for top or rear venting,  
it CANNOT be changed at a later time.  
Figure 9.3 Remove the seal cap.  
NOTICE: Once the seal cap has been removed it CANNOT  
be reattached.  
Figure 9.1 Cut the seal cap strap across the rectangles  
next to the disk.  
Figure 9.4 Remove the insulation basket and white insula-  
tion from the center vent pipe.  
Figure 9.2 Remove the white gasket material covering  
the seal cap.  
Figure 9.5 Remove the insulation from the outer vent  
pipe. For rear venting there is no insulation in the outer  
vent pipe.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
37  
NOTICE: Once the seal cap has been removed it CANNOT  
be reattached.  
Figure 9.6 To attach the rst section of vent pipe, make  
sure to use the berglass gasket in the manual bag to seal  
between the rst vent component and the outer replace  
wrap. Use 2 self tapping screws to secure the gasket to  
the outer wrap.  
Figure 9.9 Fold the center parts of the retaining band out  
Secure the rst section of venting to the replace by screw-  
ing through the two straps left over from cutting the seal  
cap strap in step 2.  
and use to remove the seal cap.  
B. Rear Vent  
CAUTION! Risk of Cuts, Abrasions or Flying Debris.  
Wear protective gloves and safety glasses during instal-  
lation. Sheet metal edges are sharp.  
NOTICE: Once appliance is set up for top or rear venting,  
it CANNOT be changed at a later time.  
Figure 9.10 Discard the vent cap, remove and discard  
the insulation basket.  
Figure 9.7 Fold the tabs toward the center of the seal  
cap (90º) and remove the insulation gasket.  
Figure 9.11 Attach the rst vent section (it will snap into  
place). Slide the insulation gasket onto the vent section,  
up against the appliance and over the tabs.  
Figure 9.8 Cut the metal retaining band and fold the  
sides out.  
38  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
C. Installing the Non-combustible Board  
D. Securing and Leveling the Appliance  
The factory supplied non-combustible board spans the  
distance from the top of the replace to the center of  
the framing header. This board must be used. See  
Figure 9.12.  
WARNING! Risk of Fire! Prevent contact with:  
• Sagging or loose insulation  
• Insulation backing or plastic  
• Framing and other combustible materials  
Block openings into the chase to prevent entry of blown-  
in insulation. Make sure insulation and other materials  
are secured.  
HEADER  
DO NOT notch the framing around the appliance  
standoffs.  
Failure to maintain air space clearance may cause  
overheating and re.  
The diagram shows how to properly position and secure  
the appliance (see Figure 9.13). Nailing tabs are provided  
to secure the appliance to the framing members.  
Figure 9.12 Non-combustible Board  
• Bend out nailing tabs on each side.  
• Place the appliance into position.  
• Keep nailing tabs ush with the framing.  
• Level the appliance from side to side and front to back.  
• Shim the appliance as necessary. It is acceptable to use  
wood shims underneath the appliance.  
• Secure the appliance to the framing by using nails or  
screws through the nailing tabs.  
• Secure the appliance to the oor by inserting two screws  
through the pilot holes at the bottom of the appliance.  
NAILING TABS  
(BOTH SIDES)  
PILOT HOLES  
Figure 9.13 Proper Positioning and Securing of an Appliance  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
39  
Installing Vent Pipe (DVP and SLP Pipe)  
10  
A. Assemble Vent Sections (DVP Pipe Only)  
Attach Vent to the Firebox Assembly  
Note: The end of the pipe sections with the lanced tabs will face  
toward the appliance.  
Attach the rst pipe section to the starting collar:  
• Lanced pipe end to the starting collar  
• Inner pipe over inner collar  
• Push the pipe section until all lanced tabs snap in place  
• Lightly tug on pipe to conrm it has locked.  
Commercial, Multi-family (Multi-level exceeding two sto-  
ries), or High-Rise Applications  
All outer pipe joints must be sealed with high temperature  
silicone, including the slip section that connects directly to  
the horizontal termination cap.  
Figure 10.1 High Temperature Silicone Sealant  
• Apply a bead of silicone sealant inside the female outer  
pipe joint prior to joining sections. See Figure 10.1  
A
Lances  
• Only outer pipes need to be sealed. All unit collar, pipe,  
slip section, elbow and cap outer ues shall be sealed  
in this manner, unless otherwise stated.  
WARNING! Risk of Fire or Explosion! DO NOT break  
silicone seals on slip sections. Use care when remov-  
ing termination cap from slip pipe. If slip section seals  
are broken during removal of the termination cap, vent  
may leak.  
B
Figure 10.3  
Figure 10.2  
Assemble Pipe Sections  
Note: Make sure that the seams are not aligned to prevent  
unintentional disconnection.  
Per Figure 10.2:  
• Start the inner pipe on the lanced end of section A into  
the ared end of section B.  
• Start the outer pipe of section A over the outer pipe of  
section B.  
• Once both vents sections are started, push rmly until  
all lanced tabs lock into place.  
• Lightly tug on the pipe to conrm the tabs have locked.  
It is acceptable to use screws no longer than 1/2 in. (13  
mm) to hold outer pipe sections together. If predrilling holes,  
DO NOT penetrate inner pipe.  
CORRECT  
For 90º and 45º elbows that are changing the vent direction  
from horizontal to vertical, one screw minimum should be  
put in the outer ue at the horizontal elbow joint to prevent  
the elbow from rotating. Use screws no longer than 1/2  
in. (13 mm). If predrilling screw holes, DO NOT penetrate  
inner pipe.  
INCORRECT  
Figure 10.4 Seams  
40  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Assemble Vent Sections (SLP Pipe Only)  
C. Assemble Slip Sections  
To attach the rst vent component to the starting collars  
of the appliance:  
• Slide the inner ue of the slip section into the inner ue of  
the pipe section and the outer ue of the slip section over  
the outer ue of the pipe section. See Figure 10.6.  
• Attach a DVP-2SL or DVP-SLP24 adapter to the starting  
collar of the appliance.  
• Slide together to the desired length.  
• Lock the vent components into place by sliding the pipe  
section onto the collar.  
• Align the seam of the pipe and seam of collar to allow  
engagement. Rotate the vent component to lock into  
place. Use this procedure for all vent components. See  
Figure 10.5.  
• Slide the gasket over the rst vent section and place it  
ush to the appliance. This will prevent cold air inltration.  
High temperature caulk may be used to hold the part in  
place.  
Pilot hole  
• Continue adding vent components, locking each  
succeeding component into place.  
Figure 10.6 Slip Section Pilot Holes  
• Ensure that each succeeding vent component is securely  
tted and locked into the preceding component.  
• Maintain a 1-1/2 in. (38 mm) overlap between the slip  
section and the pipe section.  
• Secure the pipe and slip section with two screws no  
longer than 1/2 in. (13 mm), using the pilot holes in the  
slip section. See Figure 10.7.  
Commercial, Multi-family (Multi-level exceeding two sto-  
ries), or High-Rise Applications  
For Installation into a commercial, multi-family (multi-level  
exceeding two stories) or high-rise applications: All outer  
pipe joints must be sealed with high temperature silicone,  
including the slip section that connects directly to the hori-  
zontal termination cap.  
• Apply a bead of silicone sealant inside the female outer  
pipe joint prior to joining sections. See Figure 10.1.  
• Only outer pipes need to be sealed. All unit collar, pipe,  
slip section, elbow and cap outer ues shall be sealed  
in this manner, unless otherwise stated.  
WARNING! Risk of Fire or Explosion! DO NOT break  
silicone seals on slip sections. Use care when remov-  
ing termination cap from slip pipe. If slip section seals  
are broken during removal of the termination cap, vent  
may leak.  
Figure 10.7 Screws into Slip Section  
• Continue adding pipe as necessary following instructions  
in “Assembling Pipe Sections.”  
NOTICE: If slip section is too long, the inner and outer ues  
of the slip section can be cut to the desired length.  
NOTICE: When installing a vent system with an HRC  
termination cap, all pipe system joints shall be sealed using  
a high temperature silicone sealant.  
Apply a bead of silicone sealant inside the female outer  
pipe joint prior to joining sections.  
Note: Align seams to engage pipe,  
then rotate counterclockwise to lock  
Only outer pipes are sealed, sealing the inner ue is not  
Figure 10.5 Adding Venting Components  
required.  
All unit collar, pipe, slip section, elbow and cap outer  
ues shall be sealed.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
41  
D. Secure the Vent Sections  
E. Disassemble Vent Sections  
• Vertical runs of DVP pipe must be supported every 8 ft.  
(2.44 m) after the 25 ft. (7.62 m) maximum unsupported  
rise.  
• Rotate either section (see Figure 10.10) so the seams  
on both pipe sections are aligned as shown in Figure  
10.11.  
• Vertical runs of SLP pipe must be supported every 8 ft.  
(2.44 m).  
• Pull carefully to separate the pieces of pipe.  
• Horizontal sections must be supported every 5 feet  
(1.52 m).  
• Vent supports or plumbers strap (spaced 120º apart)  
may be used to support vent sections. See Figures 10.8  
and 10.9.  
• Wall shield restops may be used to provide horizontal  
support vent sections.  
• SLP ceiling restops have tabs that may be used to  
provide vertical support.  
WARNING! Risk of Fire, Explosion or Asphyxiation!  
Improper support may allow vent to sag and separate.  
Use vent run supports and connect vent sections per in-  
stallation instructions. DO NOT allow vent to sag below  
connection point to appliance.  
Figure 10.10 Rotate Seams for Disassembly  
120º  
Figure 10.11 Align and Disassemble Vent Sections  
Figure 10.8 Securing Vertical Pipe Sections  
120º  
Figure 10.9 Securing Horizontal Pipe Sections  
42  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
F. Install Decorative Ceiling Components  
(SLP only)  
LEVEL  
A decorative ceiling thimble can be installed on a at ceil-  
ing through which the vent passes. The decorative ceiling  
thimble is used to cover the restop.  
CATHEDRAL CEILING  
SUPPORT BOX  
• Seal the gap between the vent pipe and restop using  
high temperature silicone to prevent cold air inltration.  
• Install the decorative ceiling thimble by sliding it up to  
the ceiling and attaching it using the provided screws.  
2 in. (51 mm) MIN. BELOW  
FINISHED CEILING  
Adecorative cathedral ceiling support box can be installed  
on a cathedral ceiling through which the vent passes.  
CUT HOLE 1/8 in. (3 mm)  
GREATER IN SIZE THAN  
PATTERN OF SUPPORT  
BOX AS IT IS PROJECTED  
ONTO ROOF LINE  
• Use a plumb-bob to mark the center line of the venting  
system on the ceiling and drill a small hole through the  
ceiling and roof at this point. Locate the hole and mark  
the outline of the cathedral ceiling support box on the  
outside roof.  
• Remove shingles or other roof covering as necessary  
to cut the rectangular hole for the support box. Cut the  
hole 1/8 in. (3 mm) larger than the support box outline.  
Figure 10.12  
• Lower the support box through the hole in the roof until its  
bottom is at least 2 in. (51 mm) below the ceiling (Figure  
10.12).  
• Level the support box both vertically and horizontally and  
temporarily tack it in place through the inside walls into  
the roof sheathing.  
• Use tin snips to cut the support box from the top corners  
down to the roof line and fold the resulting aps to the  
roof. See Figure 10.13.  
• Nail the aps to the roof AFTER running a bead of non  
hardening sealant between the aps and the roof.  
WARNING! Risk of Fire! Clean out ALL materials from  
inside the support box and complete the vertical vent run  
and termination.  
Figure 10.13  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
43  
G. Install Metal Roof Flashing  
• See minimum vent heights for various pitched roofs  
(Figure 10.14) to determine the length of pipe to extend  
through the roof.  
CAULK  
• Slide the roof ashing over the pipe sections extending  
through the roof as shown in Figure 10.15.  
HORIZONTAL  
OVERHANG  
2 FT.  
20 INCHES MIN.  
VERTICAL  
MIN.  
WALL  
LOWEST  
DISCHARGE  
OPENING  
Figure 10.15  
GAS DIRECT VENT  
TERMINATION CAP  
H. Assemble and Install Storm Collar  
X
CAUTION! Risk of Cuts, Abrasions or Flying Debris.  
Wear protective gloves and safety glasses during instal-  
lation. Sheet metal edges are sharp.  
12  
ROOF PITCH  
IS X/ 12  
• Connect both halves of the storm collar with two screws  
(see Figure 10.16).  
H (MIN.) - MINIMUM HEIGHT FROM ROOF  
TO LOWEST DISCHARGE OPENING  
• Wrap the storm collar around the exposed pipe section  
closest to the roof and align brackets. Insert a bolt  
(provided) through the brackets and tighten the nut to  
complete the storm collar assembly. Make sure the collar  
is tight against the pipe section.  
Roof Pitch  
H (Min.) Ft.  
Flat to 6/12........................................1.0*  
Over 6/12 to 7/12............................1.25*  
Over 7/12 to 8/12..............................1.5*  
Over 8/12 to 9/12..............................2.0*  
Over 9/12 to 10/12............................. 2.5  
Over 10/12 to 11/12......................... 3.25  
Over 11/12 to 12/12........................... 4.0  
Over 12/12 to 14/12........................... 5.0  
Over 14/12 to 16/12........................... 6.0  
Over 16/12 to 18/12........................... 7.0  
Over 18/12 to 20/12........................... 7.5  
Over 20/12 to 21/12........................... 8.0  
• Slide the assembled storm collar down the pipe section  
until it rests on the roof ashing (see Figure 10.17).  
• Caulk around the top of the storm collar (see Figure 10.18).  
* 3 foot minimum in snow regions  
Figure 10.14 Minimum Height From Roof To Lowest Discharge  
Opening  
Figure 10.16 Assembbling the Storm Collar  
NOTICE: Failure to properly caulk the roof ashing could  
cause water entry.  
• Caulk the gap between the roof ashing and the outside  
diameter of the pipe.  
• Caulk the perimeter of the ashing where it contacts the  
roof surface. See Figure 10.15.  
Figure 10.17 Assembling the Storm Collar Around the Pipe  
44  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
I. Install Vertical Termination Cap  
K. Heat Shield Requirements for Horizontal  
Termination  
• Attach the vertical termination cap by sliding the inner  
collar of the cap into the inner ue of the pipe section  
while placing the outer collar of the cap over the outer  
ue of the pipe section.  
WARNING! Risk of Fire! To prevent overheating and re,  
heat shields must extend through the entire wall thick-  
ness.  
• Secure the cap by driving three self-tapping screws  
(supplied) through the pilot holes in the outer collar of the  
cap into the outer ue of the pipe (see Figure 10.18).  
DO NOT remove the heat shields attached to the  
wall shield restop and the horizontal termination cap  
(shown in Figure 10.20).  
• Heat shields must overlap 1-1/2 in. (38 mm) mini-  
mum.  
TERMINATION CAP  
There are two sections of the heat shield. One section  
is factory-attached to the wall shield restop. The other  
section is factory-attached to the cap. See Figure 10.20.  
If the wall thickness does not allow the required 1-1/2 in.  
(38 mm) heat shield overlap when installed, an extended  
heat shield must be used.  
• If the wall thickness is less than 4 in./102 mm (DVP)  
or 4-3/8 in./ 111 mm (SLP), the heat shields on the cap  
and wall shield restop must be trimmed. A minimum  
1-1/2 in. (38 mm) overlap MUST be maintained.  
(1 of 3)  
• Useanextendedheatshieldifthenishedwallthickness  
is greater than 7-1/4 in. (184 mm).  
STORM  
COLLAR  
• The extended heat shield may need to be cut to length  
maintaining sufcient length for a 1-1/2 in. (38 mm)  
overlap between heat shields.  
SCREWS  
CAULK  
• Attach the extended heat shield to either of the existing  
heatshieldsusingthescrewssuppliedwiththeextended  
heat shield. Refer to vent components diagrams in the  
back of this manual.  
Figure 10.18  
• Rest the small leg on the extended heat shield on top  
of the pipe section to properly space it from the pipe  
section.  
J. Install Decorative Wall Components (SLP  
only)  
A decorative wall thimble can be installed on wall through  
which the vent passes. The decorative wall thimble is used  
to cover the wall shield restop.  
Important Notice: Heat shields may not be eld constructed.  
• Slide the decorative wall thimble over the last section of  
horizontal pipe before connecting the termination cap to  
the pipe.  
Once the pipe section and the termination cap have been  
connected, slide the wall thimble up to the interior wall  
surface and attach with screws provided. See Figure  
10.19.  
Figure 10.19 Wall Thimble  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
45  
Note: When using termination caps with factory-supplied  
heat shield attached, no additional wall shield restop is  
required on the exterior side of a combustible wall.  
L. Install Horizontal Termination Cap (DVP  
and SLP Pipe)  
WARNING! Risk of Fire! The telescoping ue section of  
the termination cap MUST be used when connecting vent.  
• 1-1/2 (38 mm) minimum overlap of ue telescoping  
section is required.  
HEAT SHIELD OR  
HEAT SHIELD  
EXTENDED  
1-1/2 IN. (38 MM) MIN.  
HEAT SHIELD  
OVERLAP  
WALL SHIELD  
FIRESTOP  
Failure to maintain overlap may cause overheating and  
re.  
• Vent termination must not be recessed in the wall. Siding  
may be brought to the edge of the cap base.  
SLIP SECTION  
CAN BE EXTENDED  
• Flash and seal as appropriate for siding material at  
outside edges of cap.  
INNER VENT  
SHEATHING  
• When installing a horizontal termination cap, follow  
the cap location guidelines as prescribed by current  
ANSI Z223.1 and CAN/CGA-B149 installation codes  
and refer to Section 6 of this manual.  
OUTER VENT  
INTERIOR  
EXTERIOR  
VENT DEPTH FROM BACK OF APPLIANCE TO  
OUTSIDE SURFACE OF EXTERIOR WALL  
(SEE CHART BELOW)  
CAUTION! Risk of Burns! Local codes may require in-  
stallation of a cap shield to prevent anything or anyone  
from touching the hot cap.  
Figure 10.20 Venting through the wall  
NOTICE: For certain exposures which require superior  
resistance to wind-driven rain penetration, a ashing kit and  
HRC caps are available. When penetrating a brick wall, a  
brick extension kit is available for framing the brick.  
Cap Specication Chart  
(depth without using additional pipe sections)  
DVP-TRAPK1 DVP-TRAP1 DVP-TRAPK2 DVP-TRAP2  
Top Vent  
Depth  
Rear Vent  
Depth  
Top Vent  
Depth  
Rear Vent  
Depth  
2-3/4 in. to  
4-5/8 in.  
3-1/8 in. to  
5 in.  
5-1/8 in. to  
9-1/8 in.  
5-1/2 in. to  
9-1/2 in.  
6000  
Series  
DVP-HPC1 DVP-HPC1  
DVP-HPC2 DVP-HPC2  
Top Vent  
Depth  
Rear Vent  
Depth  
Top Vent  
Depth  
Rear Vent  
Depth  
2-3/4 in. to  
4-7/8 in.  
3-1/8 in. to  
5-1/4 in.  
4-7/8 in. to  
9 in.  
5-1/4 in. to  
9-3/8 in.  
DVP-TRAP1 can adjust 1-1/2 in. (3-1/8 to 4-5/8 in.)  
DVP-TRAP2 can adjust 4 in. (5-3/8 to 9-3/8)  
DVP-HPC1 can adjust 2-1/8 in. (4-1/4 to 6-3/8)  
DVP-HPC2 can adjust 4-1/8 in. (6-3/8 to 10-1/2)  
46  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Gas Information  
11  
A. Fuel Conversion  
C. Gas Connection  
• Make sure the appliance is compatible with available gas  
types.  
• Refer to Reference Section 16 for location of gas line  
access in appliance.  
• Conversions must be made by a qualified service  
technician using Hearth & Home Technologies specied  
and approved parts.  
• Gas line may be run through knockout(s) provided.  
• The gap between supply piping and gas access hole  
may be caulked with high temperature caulk or stuffed  
with non-combustible, unfaced insulation to prevent cold  
air inltration.  
B. Gas Pressure  
• Optimum appliance performance requires proper input  
pressures.  
• Ensure that gas line does not come in contact with outer  
wrap of the appliance. Follow local codes.  
• Gas line sizing requirements will be determined in ANSI  
Z223.1 National Fuel Gas Code in the USA and CAN/  
CGA B149 in Canada.  
• Pipe incoming gas line into valve compartment.  
• Connect incoming gas line to the 1/2 in. (13 mm)  
connection on manual shutoff valve.  
• Pressure requirements are:  
WARNING! Risk of Fire or Explosion! Support control  
Gas Pressure  
Minimum inlet pressure  
Maximum inlet pressure  
Manifold pressure  
Natural Gas  
5.0 in. w.c.  
14.0 in. w.c.  
3.5 in. w.c.  
Propane  
11.0 in. w.c.  
14.0 in. w.c.  
10.0 in. w.c.  
when attaching pipe to prevent bending gas line.  
• A small amount of air will be in the gas supply lines.  
WARNING! Risk of Fire or Explosion! Gas build-up dur-  
ing line purge could ignite.  
• Purge should be performed by qualified service  
technician.  
• Ensure adequate ventilation.  
• Ensure there are no ignition sources such as sparks  
or open ames.  
WARNING! Risk of Fire or Explosion! High pressure  
will damage valve. Low pressure may cause explosion.  
• Verify inlet pressures. Verify minimum pressures when  
other household gas appliances are operating.  
Light the appliance. It will take a short time for air to purge  
from lines. When purging is complete the appliance will  
light and operate normally.  
• Install regulator upstream of valve if line pressure is  
greater than 1/2 psig.  
WARNING! Risk of Fire, Explosion or Asphyxiation!  
Check all ttings and connections with a non-corrosive  
commercially available leak-check solution. DO NOT use  
open ame. Fittings and connections could have loos-  
ened during shipping and handling.  
WARNING  
Fire Risk.  
Explosion Hazard.  
High pressure will damage valve.  
• Disconnect gas supply piping BEFORE  
pressure testing gas line at test pressures  
above 1/2 psig.  
WARNING! Risk of Fire! DO NOT change valve settings.  
This valve has been preset at the factory.  
• Close the manual shutoff valve BEFORE  
pressure testing gas line at test pressures  
equal to or less than 1/2 psig.  
D. High Altitude Installations  
NOTICE: If the heating value of the gas has been reduced,  
these rules do not apply. Check with your local gas utility  
or authorities having jurisdiction.  
Note: Have the gas supply line installed in accordance with  
local codes, if any. If not, follow ANSI 223.1. Installation  
should be done by a qualied installer approved and/or  
licensed as required by the locality. (In the Commonwealth  
of Massachusetts installation must be performed by a  
licensed plumber or gas tter).  
When installing above 2000 feet elevation:  
• In the USA: Reduce burner orice 4% for each 1000 feet  
above 2000 feet.  
• In CANADA: Reduce burner orice 10% for elevations  
between 2000 feet and 4500 feet. Above 4500 feet,  
consult local gas utility.  
Note: A listed (and Commonwealth of Massachusetts ap-  
proved) 1/2 in. (13 mm) T-handle manual shut-off valve  
and exible gas connector are connected to the 1/2 in. (13  
mm) control valve inlet.  
• If substituting for these components, please consult  
local codes for compliance.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
47  
Electrical Information  
12  
B. IntelliFire Ignition System Wiring  
A. Wiring Requirements  
• Wire the appliance junction box to 110 VAC for proper  
operation of the appliance.  
NOTICE: This appliance must be electrically wired  
and grounded in accordance with local codes or, in the  
absence of local codes, with National Electric Code  
ANSI/NFPA 70-latest edition or the Canadian Electric  
Code CSA C22.1.  
WARNING! Risk of Shock or Explosion! DO NOT wire  
IPI controlled appliance junction box to a switched circuit.  
Incorrect wiring will override IPI safety lockout.  
• Wire the appliance junction box to 110-120 VAC. This is  
required for use of optional accessories (standing pilot  
ignition) or proper operation of the appliance (IntelliFire  
ignition).  
• Refer to Figure 12.2, IntelliFire Pilot Ignition (IPI) Wiring  
Diagram.  
• This appliance is equipped with an IntelliFire control valve  
which operates on a 3 volt system.  
A110-120 VAC circuit for this product must be protected  
with ground-fault circuit-interrupter protection, in  
compliance with the applicable electrical codes, when  
it is installed in locations such as in bathrooms or near  
sinks.  
• Plug the 3-volt AC transformer into the appliance junction  
box to supply power to the unit OR install two D cell  
batteries (not included) into the battery pack before use.  
NOTICE: Batteries should not be placed in the battery  
pack while using the transformer. Remove batteries before  
using the transformer, and unplug the transformer before  
installing the batteries. Battery polarity must be correct or  
module damage will occur.  
• Low voltage and 110 VAC voltage cannot be shared  
within the same wall box.  
WARNING! Risk of Shock or Explosion! DO NOT wire  
110V to the valve or to the appliance wall switch. Incorrect  
wiring will damage controls.  
C. Standing Pilot Ignition System Wiring  
Determine if the appliance uses an IntelliFire ignition sys-  
tem or standing pilot ignition system:  
• The standing pilot ignition system wiring does not require  
a 110 VAC supply to operate. See Figure 12.3  
• Open the control access panel or remove the decorative  
front.  
• A 110 VAC junction box MUST be installed for use with  
a fan or remote control. See Figure 12.4 for junction box  
wiring. Keep wire lengths short as possible.  
• A red or black ignitor button (as shown in Figure 12.1)  
indicates this appliance is standing pilot ignition.  
NOTICE: DO NOT wire 110 VAC to the millivolt valve! This  
will damage the valve.  
• If using a thermostat use one compatible with a millivolt  
gas valve system:  
RED OR  
BLACK  
BUTTON  
- Install the thermostat in the location as indicated in the  
thermostat instructions to ensure proper operation of  
appliance.  
- Use low resistance thermostat wire for wiring from  
ignition system to the wall switch and thermostat.  
- Keep wire lengths short as possible.  
D. Optional Accessories Requirements  
Figure 12.1 Ignitor Button  
• This appliance may be used with a wall switch, wall  
mounted thermostat and/or a remote control.  
Wiring for optional Hearth & Home Technologies approved  
accessories should be done now to avoid reconstruction.  
Follow instructions that come with those accessories.  
48  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PLUG-IN  
3V TRANSFORMER  
IGNITION MODULE 3 VAC  
ON/OFF  
WALL SWITCH  
INTERMITTENT  
PILOT IGNITOR  
IGNITION  
MODULE  
(3V)  
Note: Appliance will not operate  
unless properly grounded.  
LOW VOLTAGE  
SEE NOTE 1  
VALVE  
ORG  
WHT  
GROUND  
REMOTE  
CONTROL HOT  
NEUTRAL  
GROUND TO  
FIREPLACE  
CHASSIS*  
BLACK WIRE CAN BE  
PLUGGED INTO ANY  
OF #1 - #5 LOCATIONS  
ON THE HOT SIDE  
ORG  
BLK  
RED  
THERMOSTAT  
WIRE  
ASSEMBLY  
WHITE WIRE CAN BE  
PLUGGED INTO ANY  
OF#1 - #5 LOCATIONS  
ON THE NEUTRAL SIDE  
VALVE  
TRANSFORMER  
3 VAC  
REMOTE  
JUMPER WIRE  
PLUG-IN  
Figure 12.2 IntelliFire Pilot Ignition (IPI) Wiring Diagram  
E. Electrical Service and Repair  
WARNING! Risk of Shock! Replace damaged wire with  
type 105º C rated wire. Wire must have high temperature  
insulation.  
WARNING! Risk of Shock! Label all wires prior to dis-  
connection when servicing controls. Wiring errors can  
cause improper and dangerous operation. Verify proper  
operation after servicing.  
STANDING  
PILOT  
BRN  
RED  
VALVE  
THERMOSTAT  
WIRE ASSEMBLY  
ON/OFF PIGGYBACK WIRE  
WHT  
RED  
Figure 12.3 Standing Pilot Ignition Wiring Diagram  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
49  
F. Junction Box Installation  
If the box is being wired from the INSIDE of the appli-  
Romex  
Connector  
ance:  
• Remove the screw attaching the junction box/receptacle  
to the outer shell, rotate the junction box inward to dis-  
engage it from the outer shell (see Figure 12.4).  
14/2WG  
Cover Plate  
outside firebox  
• Pull the electrical wires from outside the appliance through  
the opening into the valve compartment and secure wires  
with a Romex connector. See Figure 12.4.  
• Make all necessary wire connections to the junction  
box/receptacle and reattach the junction box/receptacle  
to the outer shell.  
Copper  
ground attached  
to GRN screw with  
GRN wire  
GRN wire  
inside box  
NOTICE: DO NOT wire  
110 VAC to wall switch.  
Figure 12.4 Junction Box Detail  
G. Wall Switch Installation for Fan (Optional)  
If the box is being wired to a wall mounted switch for use  
with a fan (See Figure 12.5):  
Switch  
Minimum 14-3 AWG  
with Ground  
• The power supply for the appliance must be brought into  
a switch box.  
Red  
Black  
White  
Green  
Black  
White  
Green  
Junction Box  
• The power can then be supplied from the switch box to the  
appliance using a minimum of 14-3 with ground wire.  
Power  
Supply  
Wires  
• At the switch box connect the black (hot) wire and red  
(switch leg) wire to the wall switch as shown.  
Switch Box  
• At the appliance connect the black (hot), white (neutral)  
and green (ground) wires to the junction box as shown.  
Knockout  
Red  
• Add a 1/4 in. insulated female connector to the red (switch  
leg) wire, route it through the knockout in the face of the  
junction box, and connect to the top fan switch connector  
(1/4 in. male) as shown.  
Figure 12.5 Junction Box Wired to Wall Switch or BC10  
50  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Finishing  
13  
A. Mantel and Wall Projections  
B. Facing Material  
WARNING! Risk of Fire! Comply with all minimum clear-  
ances as specied. Framing closer than the minimums list-  
ed must be constructed entirely of noncombustible materials  
(i.e., steel studs, concrete board, etc.).  
• Metal front faces may be covered with non-combustible  
materials only.  
• Facing and/or nishing materials must not interfere with  
air ow through louvers, operation of louvers or doors,  
or access for service.  
Combustible Mantels  
• Facing and/or nishing materials must never overhang  
into the glass opening.  
TO CEILING  
• Observe all clearances when applying combustible  
materials.  
18  
Note: All  
measurements  
in inches.  
12  
• Seal joints between the nished wall and appliance top  
and sides using a 300 ºF minimum sealant. Refer to  
Figure 13.3.  
11  
10  
32  
9
8
25  
7
19  
WARNING! Risk of Fire! DO NOT apply combustible  
materials beyond the minimum clearances. Comply with  
all minimum clearances to combustibles as specied in  
this manual. Overlapping materials could ignite and will  
interfere with proper operation of doors and louvers.  
6
18  
5
17  
4
16  
3
15  
14  
13  
12  
2-1/2  
11  
10  
5
NON-COMBUSTIBLE ZONE (Shaded areas)  
41 in.  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
Note: Measurement is taken from top of the opening,  
NOT the top of the replace.  
Figure 13.1 Minimum Vertical and Maximum Horizontal  
Dimensions of Combustibles  
39-3/8 in.  
Combustible Mantel Legs or Wall Projections  
INTERIOR WALL  
TOP VIEW  
1 in.  
1 in.  
A
B
Figure 13.3 Noncombustible Facing Diagram  
FIREPLACE OPENING  
MANTEL LEG OR WALL PROJECTIONS  
If A minimum is ____, then B maximum is_____.  
Inches  
2-7/16 3-7/16 4-7/16 5-7/16 6-7/16 7-7/16  
A
Millimeters  
62  
1
87  
2
113  
3
138  
4
164  
5
189  
Inches  
B
Millimeters  
25  
51  
76  
102  
127  
Figure 13.2 Combustible Mantel Leg or Wall Projections  
(Acceptable on both sides of opening)  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
51  
C. Doors  
Only doors certied for use with this appliance model may  
be used. Contact your dealer for a list of doors that may  
be used. Once you have determined what kind of door  
and nishing material is going to be used on the replace,  
you may use the table below which shows the door mod-  
els and the nishing material thickness allowed. For an  
inside t there is an available template to assist with siz-  
ing the nishing material.  
ELBOW  
HEAT  
FINISHING  
MATERIAL  
FINISHING  
MATERIAL  
SHIELD  
DOOR  
37 in.  
(Outside door width)  
FINISH  
37-1/4 in.  
(Includes 1/8 in. opening each side of door)  
MATERIAL  
MAXIMUM  
THICKNESS  
SEE  
FIGURE  
DOOR  
FIT  
Folio  
Inside  
Overlap  
Inside  
Any  
1 inch  
13.4  
13.5  
13.6  
13.5  
13.7  
13.5  
13.6  
13.5  
13.6  
13.5  
13.7  
Arcadia  
Any  
Overlap  
Inside  
1 inch  
Halston  
Chateau  
Valencia  
Galleria  
33-3/4 in.  
1 inch - 3 inch  
1 inch  
34 in.  
37 in.  
Overlap  
Inside  
(Outside door width)  
Any  
Overlap  
Inside  
1 inch  
37-1/4 in.  
(Includes 1/8 in. opening each side of door)  
Any  
Overlap  
Inside  
1 inch  
Finishing materials over 1 inch thick.  
1 inch - 3 inch  
Figure 13.6 Inside t door  
ELBOW  
HEAT  
SHIELD  
1-2 IN. THICK  
FINISHING  
MATERIAL  
1-2 IN. THICK  
FINISHING  
MATERIAL  
*IF FINISHING MATERIAL IS THICKER THAN  
2 IN., DOORS WILL ONLY OPEN  
AS FAR AS PICTURED  
DOORS  
Stop nishing material ush with opening.  
Figure 13.4 Folio Door  
37 1/4 IN.  
Finishing material between 1 and 3 inches thick.  
Figure 13.7 Operable hinge door  
Finishing materials 1 inch maximum thick.  
Stop nishing material ush with opening.  
Figure 13.5 Overlap Fit Door  
52  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Appliance Setup  
14  
A. Remove Fixed Glass Assembly  
E. Ember Placement  
See Section 14.G.  
WARNING! Risk of Explosion! Follow ember placement  
instructions in manual. DO NOT place embers directly over  
burner ports. Replace ember material annually. Improperly  
placed embers interfere with proper burner operation.  
B. Remove the Shipping Materials  
Remove shipping materials from inside or underneath the  
rebox.  
Ember material is shipped with this gas appliance. To place  
the ember material:  
C. Clean the Appliance  
• Embers CANNOT be placed directly over ports. Care  
should be taken not to cover the lighting trail of ports  
(from back to front).  
Clean/vacuum any sawdust that may have accumulated  
inside the rebox or underneath in the control cavity.  
D. Accessories  
• Place dime-size pieces of Glowing Embers® just in front  
of the port trail, but not on or in between the ports (see  
Figure 14.1). Care should be taken so that the ports are  
not covered. Failure to follow this procedure will likely  
cause lighting and sooting problems.  
Install approved accessories per instructions included  
with accessories. Contact your dealer for a list of ap-  
proved accessories.  
WARNING! Risk of Fire and Electric Shock! Use ONLY  
Hearth & Home Technologies-approved optional acces-  
sories with this appliance. Using non-listed accessories  
could result in a safety hazard and will void the warranty.  
EMBER MATERIAL  
Figure 14.1 Placement of Embers  
• Save the remaining ember materials for use during  
appliance servicing. The embers provided should be  
enough for 3 to 5 applications.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
53  
F. Install the Log Assembly  
LOG ASSEMBLY: LOGS-6000BE  
CAUTION! Logs are fragile! Handle with  
care.  
1. Release four glass clips and set the  
glass assembly aside.  
NOTE: See Step 9 when replacing  
the log set in an existing replace.  
2. Carefully cut the cable tie holding the  
log assembly in place and discard the  
tie. Do not leave any part of the tie in  
the replace. See Figure 2.  
Figure 1  
CAUTION! Risk of Cuts, Use wire cutters.  
DO NOT attempt to cut the tie with a knife.  
3. Grasp the log assembly by the ends.  
Do NOT grasp the log assembly by  
the center. Remove the log assembly  
from the replace and set aside.  
4. Remove the foam pad from the re-  
place and discard. Make sure all  
pieces of the foam are removed. With  
a screwdriver bend up the log place-  
ment tabs. See Figure 3.  
Figure 2  
Log Placement Tabs  
Figure 3  
2024-925D 4/09  
54  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
5. The grate is located in the lower cavity.  
Remove the screw holding the grate  
in place and discard the screw.  
6. Position the grate into the cutout in the  
refractory. Hook the grate into position  
using the tabs on the bottom of the  
grate. Make sure the grate is pulled  
forward on the refractory (see Figure  
4).  
7. Cut shrink wrap and remove from  
around the log assembly.  
NOTICE: Remove all packaging from logs.  
8. Install embers. See Ember Placement  
section of the Owner’s Manual for  
details.  
Figure 4  
WARNING! Risk of Explosion! Follow em-  
ber placement instructions in manual. DO  
NOT place embers directly over burner ports.  
Replace ember material annually. Improperly  
placed embers interfere with proper burner  
operation.  
9. Carefully position the log set in the  
replace. Pull the log set forward until  
the log set contacts the log placement  
tabs. Center the log set in the rebox  
side to side as shown in Figure 5.  
Grate has been removed in Figure 5  
photo only for purpose of illustration.  
Log Placement Tabs  
Figure 5  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
55  
G. Fixed Glass Assembly  
I. Air Shutter Setting  
WARNING! Risk of Asphyxiation! Handle xed glass  
assembly with care. Inspect the gasket to ensure it is  
undamaged and inspect the glass for cracks, chips or  
scratches.  
This appliance has an adjustable air shutter (which controls  
the primary air) factory set for the minimum vertical vent  
run. If your installation has more than the minimum required  
vertical vent length, adjustment of the air shutter may  
be necessary to obtain optimal ame appearance. This  
should be adjusted by a qualied installer at the time  
of installation.  
DO NOT strike, slam or scratch glass.  
DO NOT operate replace with glass removed, cracked,  
broken or scratched.  
To adjust the air shutter, remove the burner and rotate  
the shutter on the end of the burner neck. Care should be  
taken when adjusting the air shutter so as not to cause  
the appliance to soot. If sooting occurs the air shutter will  
need to be rotated open.  
Replace as a complete assembly.  
Removing Fixed Glass Assembly  
• Pull the four glass assembly latches out of the groove on  
the glass frame. Remove glass door from the appliance  
(see Figure 14.2).  
Air Shutter Settings  
NG  
LP  
Replacing Fixed Glass Assembly  
Burner  
3/8 in.  
Full Open  
• Replace the glass door on the appliance. Pull out and  
latch the four glass assembly latches into the groove on  
the glass frame.  
LATCHES  
(BOTH BOTTOM  
AND TOP)  
GLASS  
ASSEMBLY  
Figure 14.2 Fixed Glass Assembly  
H. Install Trim and/or Surround  
• Install optional trim kits and/or surrounds using the  
instructions included with the accessory.  
• Use non-combustible materials to cover the gap between  
the sheet rock and the appliance (when applicable to the  
model).  
56  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Troubleshooting  
15  
With proper installation, operation, and maintenance your gas appliance will provide years of trouble-free service. If you do  
experience a problem, this troubleshooting guide will assist a qualied service technician in the diagnosis of a problem and  
the corrective action to be taken. This troubleshooting guide can only be used by a qualied service technician. Contact  
your dealer to arrange a service call by a qualied service technician.  
A. Standing Pilot Ignition System  
Symptom  
Possible Causes  
Corrective Action  
1. After repeated triggering A. No gas or low gas pressure.  
of the red or black piezo  
Check the remote shut-off valves from the appliance. Usually, there  
is a valve near the gas main. There can be more than one valve be-  
tween the appliance and the main.  
ignitor button, the spark  
ignitor will not light the  
B. No lp in tank.  
pilot.  
Check the LP (propane) tank. You may be out of fuel.  
C. Ignitor.  
Check the spark at the electrode and pilot. If no spark and electrode  
wire is properly connected, replace the ignitor. Verify that there is no  
short in electrode wire.  
D. Pilot or misaligned electrode  
(spark at electrode).  
Using match, light the pilot. If the pilot lights, turn off the pilot and  
trigger the piezo ignitor button again. If the pilot lights, an improper  
gas/air mixture caused the bad lighting and a longer purge period is  
recommended. If the pilot will not light, ensure the gap at the elec-  
trode and pilot is one-eighth in. to have a strong spark. If the gap is  
OK, replace the pilot.  
2. The pilot will not stay lit  
after carefully following  
the lighting instructions.  
A. Thermocouple.  
Check that the pilot ame impinges on the thermocouple. Adjust the  
pilot for proper ame impingement.  
Ensure that the thermocouple connection at the gas valve is fully in-  
serted and tight (hand tighten plus 1/4 turn).  
Verify proper voltage output from the thermocouple to the valve.  
Place one millivolt meter lead wire on the thermocouple copper lead.  
Place the second lead wire on the solder button on the back of the  
valve (blue wire). Start the pilot and hold the valve knob in. The mil-  
livolt reading should read 8-16 millivolts. If millivolt reading is less  
than 8 millivolts, replace thermocouple.  
B. Improper gas inlet pressure. Natural gas should be 5-14 in. w.c. LP should be 10-14 in. w.c. Verify  
pressure with manometer.  
C. Valve.  
If the thermocouple is producing 8-16 millivolts, replace control valve.  
3. The pilot is burning,  
there is no burner  
A. ON/OFF switch or wires.  
Check the ON/OFF switch and wires for proper connections. Place  
the jumper wires across the terminals at the ON/OFF switch. If the  
burner comes on, replace the ON/OFF switch. If the ON/OFF switch  
is OK, place the jumper wires across the ON/OFF switch wires at the  
gas valve. If the burner comes on, the wires are faulty or connections  
are bad.  
ame, the valve knob is  
in the ON position, and  
the ON/OFF switch is in  
the ON position.  
B. Thermopile may not be gen-  
Check that the pilot ame impinges thermopile properly.  
erating sufcient millivoltage.  
Be sure the wire connections from the thermopile at the gas valve  
terminals are tight and that the thermopile is fully inserted into the  
pilot bracket.  
Check the thermopile with a millivolt meter. Take the reading at TH-  
TP&TP terminals of the gas valve. The meter should read 350 mil-  
livolts minimum, while holding the valve knob depressed in the pilot  
position, with the pilot lit, and the ON/OFF switch in the OFF position.  
Replace the thermopile if the reading is below the specied mini-  
mum.  
With the pilot in the ON position, disconnect the thermopile leads  
from the valve. Take a reading at the thermopile leads. The reading  
should be 350 millivolts minimum. Replace the thermopile if the read-  
ing is below the minimum.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
57  
Troubleshooting (continued)  
Symptom  
Possible Cause  
Corrective Action  
3. (Continued)  
C. Valve.  
Turn the valve knob to the ON position. Place the ON/  
OFF switch in the ON position. Take a reading with a  
millivolt meter at the thermopile terminals. The millivolt  
meter should read greater than 125mV. If the reading  
is acceptable, and if the burner does not come on, re-  
place the gas valve.  
D. Plugged burner orice.  
Check the burner orice for stoppage. Remove stop-  
page.  
E. Wall switch or wires.  
Check the wall switch and wires for proper connec-  
tions. Place the jumper wires across the terminals at  
the wall switch. If the burner comes on, replace the  
wall switch. If the wall switch is OK, place the jumper  
wires across the wall switch wires at the gas valve. If  
the burner comes on, the wires are faulty or connec-  
tions are bad.  
4. Frequent pilot outage A. Pilot ame may be too high or too low, or blow- Clean thermocouple and adjust the pilot ame for  
problem.  
ing out (high pressure), causing pilot safety to  
drop out.  
proper ame impingement. Follow lighting instructions  
carefully.  
5. The pilot and main  
burner extinguish  
while in operation.  
A. No LP in tank.  
Check the LP (propane) tank. Rell the fuel tank.  
B. Improper gas inlet pressure.  
Natural gas should be 5-14 in. w.c. LP should be 10-  
14 in. w.c. Verify pressure with manometer.  
C. Inner vent pipe leaking exhaust gases back  
into the system.  
Check venting system for damage. Replace/repair im-  
properly assembled pipe sections.  
D. Glass installed improperly.  
Check to ensure glass is installed properly. Replace  
xed glass panel assembly.  
E. Thermopile or thermocouple.  
F. Improper vent cap installation.  
Replace pilot if necessary.  
Check for proper installation and freedom from debris  
or blockage.  
6. Glass soots.  
A. Flame impingement.  
Adjust the log set so that the ame does not exces-  
sively impinge on it. Refer to log instructions.  
B. Improper air shutter setting.  
Refer to manual for shutter set points. Ensure that set  
point is correct for appliance/gas type. If unit has ad-  
justable shutter, it may be necessary to increase shut-  
ter opening.  
C. Debris around air shutter.  
Inspect the opening at the base of the burner. NO MA-  
TERIAL SHOULD BE PLACED IN THIS OPENING.  
7. Flame burns blue  
and lifts off burner.  
A. Insufcient oxygen being supplied.  
Ensure that the vent cap is installed properly and free  
of debris. Ensure that the vent system joints are tight  
and have no leaks.  
Ensure that no debris has been placed at the base of,  
or in the area of the air holes in the center of the base  
pan beneath the burner.  
Ensure that the glass is tightened properly on the unit,  
particularly on top corners.  
58  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. IntelliFire Ignition System  
Symptom  
Possible Cause  
Corrective Action  
1. Pilot won’t light.  
The ignitor/module  
makes noise, but no  
spark.  
A. Incorrect wiring.  
Verify “S” wire (white) for sensor and “I” wire (orange) for ignitor are  
connected to correct terminals on module and pilot assembly.  
B. Loose connections or electrical  
shorts in the wiring.  
Verify no loose connections or electrical shorts in wiring from mod-  
ule to pilot assembly. Verify connections underneath pilot assem-  
bly are tight; also verify connections are not grounding out to metal  
chassis, pilot burner, pilot enclosure, mesh screen if present, or any  
other metal object.  
C. Ignitor gap is too large.  
D. Module.  
Verify gap of igniter to right side of pilot hood. The gap should be  
approximately .17 in. or 1/8 in. (3 mm).  
Turn ON/OFF rocker switch or wall switch to OFF position. Remove  
ignitor wire “I” from module. Place a grounded wire about 3/16 in. (5  
mm) away from “I” terminal on module. Place ON/OFF rocker switch  
or wall switch in ON position. If there is no spark at “I” terminal module  
must be replaced. If there is a spark at “I” terminal, module is ne.  
Inspect pilot assembly for shorted sparker wire or cracked insulator  
around electrode. Replace pilot if necessary.  
2. Pilot won’t light,  
there is no noise or  
spark.  
A. No power or transformer installed  
incorrectly.  
Verify that transformer is installed and plugged into module. Check  
voltage of transformer under load at spade connection on module  
with ON/OFF switch in ON position. Acceptable readings of a good  
transformer are between 3.2 and 2.8 volts AC.  
B. A shorted or loose connection in  
wiring conguration or wiring har-  
ness.  
Remove and reinstall the wiring harness that plugs into module.  
Verify there is a tight t. Verify pilot assembly wiring to module. Re-  
move and verify continuity of each wire in wiring harness. Replace  
any damaged components.  
C. Improper wall switch wiring.  
D. Module not grounded.  
Verify that 110/VAC power is “ON” to junction box.  
Verify black ground wire from module wire harness is grounded to  
metal chassis of appliance.  
E. Module.  
Turn ON/OFF rocker switch or wall switch to OFF position. Remove  
ignitor wire “I” from module. Place ON/OFF rocker switch or wall  
switch in ON position. If there is no spark at “I” terminal module  
must be replaced. If there is a spark at “I” terminal, module is ne.  
Inspect pilot assembly for shorted sparker wire or cracked insulator  
around electrode.  
3. Pilot sparks, but  
Pilot will not light.  
A. Gas supply.  
Verify that incoming gas line ball valve is “open”. Verify that inlet  
pressure reading is within acceptable limits, inlet pressure must not  
exceed 14 in. W.C.  
B. Ignitor gap is too large.  
C. Module is not grounded.  
Verify gap of igniter to right side of pilot hood. The gap should be  
approximately .17 in. or 1/8 in. (3 mm).  
Verify module is securely grounded to metal chassis of appliance.  
D. Module voltage output / Valve/Pilot Verify battery voltage is at least 2.7 volts. Replace batteries if volt-  
solenoid ohms readings. age is below 2.7.  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
59  
IntelliFire Ignition System - (continued)  
Symptom  
Possible Cause  
Corrective Action  
A. A shorted or loose connection in ame  
Verify all connections to wiring diagram in manual. Verify  
connections underneath pilot assembly are tight. Verify con-  
nections are not grounding out to metal chassis, pilot burn-  
er, pilot enclosure or screen if present, or any other metal  
object.  
4. Pilot lights but contin-  
ues to spark, and main  
burner will not ignite.  
(If the pilot continues  
to spark after the  
pilot ame has been lit,  
ame rectication has  
not occurred.)  
sensing rod.  
B. Poor ame rectication or contaminated With xed glass assembly in place, verify that ame is en-  
ame sensing rod.  
gulng ame sensing rod on left side of pilot hood. Flame  
sensing rod should glow shortly after ignition. Verify cor-  
rect pilot orice is installed and gas inlet is set to pressure  
specications. Clean ame sensing rod with emery cloth to  
remove any contaminants that may have accumulated on  
ame sensing rod.  
C. Module is not grounded.  
Verify module is securely grounded to metal chassis of ap-  
pliance. Verify that wire harness is rmly connected to the  
module.  
D. Damaged pilot assembly or contami-  
Verify that ceramic insulator around the ame sensing rod  
is not cracked, damaged, or loose. Verify connection from  
ame sensing rod to white sensor wire. Clean ame sensing  
rod with emery cloth to remove any contaminants that may  
have accumulated on ame sensing rod. Verify continuity  
with a multimeter with ohms set at lowest range. Replace  
pilot if any damage is detected.  
nated ame sensing rod.  
E. Module.  
Turn ON/OFF rocker switch or wall switch to OFF position.  
Remove ignitor wire “I” from module. Place ON/OFF rocker  
switch or wall switch in ON position. If there is no spark at “I”  
terminal module must be replaced. If there is a spark at “I”  
terminal, module is ne.  
60  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Reference Materials  
16  
A. Appliance Dimension Diagram  
Dimensions are actual appliance dimensions. Use for reference only. For framing dimensions and clearances refer to Section 5.  
K
L
I
J
TOP VIEW  
M
ELECTRICAL  
ACCESS  
GAS LINE  
ACCESS  
H
R
P
D
C
G
N
Q
E
B
A
F
O
LEFT SIDE  
FRONT VIEW  
RIGHT SIDE  
Location  
Inches Millimeters  
Location  
Inches  
Millimeters  
1041  
918  
J
K
L
11-5/8  
28-1/2  
14-1/4  
8 dia  
2-1/8  
6-7/8  
38  
295  
724  
362  
203  
54  
A
B
C
D
E
F
G
H
I
41  
36-1/8  
33-1/2  
34-5/8  
2-3/8  
5
851  
M
N
O
P
Q
R
879  
60  
175  
965  
25  
127  
26-7/8  
6 dia  
21-1/2  
683  
1
152  
Î
39-3/8  
1000  
546  
Figure 16.1 Appliance Dimensions  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
61  
B. Vent Components Diagrams  
Effective Length  
Pipe  
10-1/2 in.  
(267 mm)  
Inches  
4
Millimeters  
102  
°
45  
DVP4  
Effective  
Height/Length  
DVP6  
6
12  
152  
305  
DVP12  
DVP24  
DVP36  
DVP48  
DVP6A  
4-7/8 in.  
( 276 mm)  
24  
610  
36  
914  
10-7/8 in.  
(276 mm)  
48  
1219  
76 to 152  
DVP Pipe (see chart)  
3 to 6  
DVP45 (45º Elbow)  
DVP12A 3 to 12 76 to 305  
DVP12MI 3 to 12 76 to 305  
DVP24MI 3 to 24 76 to 610  
11-3/8 in.  
(289 mm)  
10 in.  
(254 mm)  
10 in.  
(254 mm)  
1 in.  
(25 mm)  
7-3/8 in.  
(187 mm)  
24 in.  
(610 mm)  
1-1/4 in. (32 mm)  
10 in.  
(254 mm)  
9-1/4 in.  
(235 mm)  
1/2 in. TYP  
(13 mm)  
13-1/4 in.  
(337 mm)  
DVP-FS (Ceiling Firestop)  
DVP90ST (90° Elbow)  
DVP-AS (Attic Shield)  
12 in.  
(305 mm)  
1 in.  
(25 mm)  
8 in.  
(203 mm)  
1- 1/2 in.  
(38 mm)  
10 in.  
(254 mm)  
14 in.  
(356 mm)  
UP  
5 in.  
(127 mm)  
12 in.  
(305 mm)  
6 in.  
(152 mm)  
DVP-HVS (Vent Support)  
DVP-WS (Wall Shield Firestop)  
Figure 16.2 DVP vent components  
62  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be  
used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the  
existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B  
will be required.  
8 in.  
(203 mm)  
Heat  
Shield  
15-1/8 in.  
(384 mm)  
Minimum  
Effective Length  
Maximum  
Effective Length  
Term Cap  
Trap1  
Max  
Effective  
Length  
12 in.  
(305 mm)  
3-1/8 in.  
79 mm  
4-5/8 in.  
117 mm  
9-3/8 in.  
238 mm  
DVP-TRAP  
Horizontal Termination Cap  
5-3/8 in.  
137 mm  
Trap2  
DVP-TRAP2  
DVP-TRAP1  
DVP-TRAPK2  
DVP-TRAPK1  
DVP-HPC2  
DVP-HPC1  
Figure 16.3 DVP vent components  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
63  
B. Vent Components Diagrams (continued)  
31 in.  
(787 mm)  
13-1/4 in.  
(367 mm)  
24-5/8 in.  
(625 mm)  
27-1/2 in.  
(127 mm)  
24-5/8 in.  
(625 mm)  
13-1/4 in.  
(367 mm)  
RF6M  
RF12M  
Roof Flashing Multi-pak  
Roof Flashing Multi-pak  
5 in.  
(127 mm)  
11-7/8 in.  
(302 mm)  
5 in.  
(127 mm)  
13-3/4 in.  
(349 mm)  
13-7/8 in.  
(352 mm)  
13-3/4 in.  
(349 mm)  
DVP-BEK2  
DVP-HPC Cap Brick Extension  
BEK  
Trap Cap Brick Extension  
11-5/8 in.  
(295 mm)  
12-1/8 in.  
(308 mm)  
7-1/8 in.  
(181 mm)  
5-3/4 in.  
(146 mm)  
DVP-TRAPFL  
COOL-ADD  
Cap Shield  
Flashing  
13-7/8 in.  
(352 mm)  
9-1/2 in.  
(241 mm)  
26 in.  
660 mm  
14 in.  
(356 mm)  
DVP-HSM-B  
Extended Heat Shield  
DRC-RADIUS  
Cap Shield  
Figure 16.4 DVP vent components  
64  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
7-3/8 in.  
(187 mm)  
1-1/2 in.  
(38 mm)  
17-3/4 in.  
(451 mm)  
14 in.  
(356 mm)  
12 in.  
(305 mm)  
12 in.  
305 mm  
DVP-TB1  
BasementVent Cap  
7-1/4 in.  
(184 mm)  
12-1/2 in.  
(318 mm)  
5-1/4 in.  
(133 mm)  
DVP-TVHW  
VerticalTermination Cap (Highwind)  
PVK-80  
(For use with IPI and DSI appliances only.)  
7-1/4 in.  
(184 mm)  
14 in.  
(356 mm)  
16-7/8 in.  
(429 mm)  
1 in.  
(25 mm)  
12 in.  
(305 mm)  
14 in.  
(356 mm)  
7-1/8 in.  
12-1/8 in.  
(181 mm)  
(314 mm)  
3/8 in. (10 mm)  
1 in. (25 mm)  
8-3/4 in.  
(222 mm)  
7-3/4 to 10-3/8 in.  
(197 to 264 mm)  
1-5/8 in.  
(41 mm)  
DVP-FBHT  
FireBrickTermination Cap  
DVP-HPC  
High Performance Cap  
Figure 16.5 DVP vent components  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
65  
B. Vent Components Diagrams (continued)  
8-1/8 in.  
(206 mm)  
13 in.  
(330 mm)  
Effective Length  
5-3/4 to 8-3/8 in.  
146 to 213 mm  
5-1/2 in.  
140 mm  
8-3/8 in.  
213 mm  
3°  
87°  
15 in.  
(381 mm)  
10-1/2 in.  
267 mm  
10-7/8 in.  
276 mm  
WARNING  
Fire Risk.  
• When using DVP-HRC-SS and DVP-HRC-ZC-  
SS termination caps on top vented replaces, a  
6 inch minimum vertical vent section is required  
before installing rst elbow.  
DVP-HRC-SS  
DVP-HRC-ZC-SS  
HORIZONTAL TERMINATION CAP  
Figure 16.6 DVP vent components  
66  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
6-1/2 in.  
165 mm  
6-1/2 in.  
165 mm  
6-1/2 in.  
165 mm  
8-3/4 in.  
222 mm  
9-1/4 in.  
235 mm  
6 in.  
152 mm  
6-5/8 in.  
168 mm  
6-5/8 in.  
168 mm  
SLP45  
45° Elbow  
9-7/8 in.  
251 mm  
SLP-90ST  
90° Elbow  
Effective Height/Length  
Pipe  
SLP4  
inches  
4
mm  
102  
SLP6  
6
152  
Effective  
Height/  
Length  
SLP12  
SLP24  
SLP36  
SLP48  
SLP6A  
SLP12A  
12  
305  
24  
610  
36  
914  
48  
1219  
51 - 152  
51 - 305  
2 - 6  
2 - 12  
SLP PIPE  
DVP-SLP24  
Adapter  
SLP-HVS  
Horizontal Pipe  
Support  
SLP-FS  
Ceiling Firestop  
SLP-WS  
Wall Shield Firestop  
Figure 16.7 SLP Series Vent Components  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
67  
B. Vent Components Diagrams (continued)  
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be  
used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm)  
the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a  
DVP-HSM-B will be required.  
8 in.  
(203 mm)  
Heat  
Shield  
15-1/8 in.  
(384 mm)  
Minimum  
Effective Length  
Maximum  
Effective Length  
Term Cap  
Trap1  
Max  
3-1/8 in.  
79 mm  
4-3/4 in.  
121mm  
9-1/4 in.  
235 mm  
Effective  
Length  
12 in.  
(305 mm)  
5-1/4 in.  
133 mm  
Trap2  
SLP-TRAP  
Horizontal Termination Cap  
SLP-TVHW  
Vertical  
Termination Cap  
SLP-CCS-BK  
Cathedral Ceiling  
Support Box-Black  
SLP-SNKD  
Snorkel  
Termination Cap  
26 in.  
660 mm  
DVP-HSM-B  
DVP-2SL  
Extended Heat Shield  
SLP-DCF-BK  
Ceiling Firestop  
Black  
SLP-WT-BK  
Wall Thimble-Black  
PVK-80  
(For use with IPI and DSI appliances only.)  
Figure 16.8 SLP Series Vent Components  
68  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
D. Contact Information  
Heat & Glo, a brand of Hearth & Home Technologies Inc.  
7571 215th Street West, Lakeville, MN 55044  
Please contact your Heat & Glo dealer with any questions or concerns.  
For the location of your nearest Heat & Glo dealer,  
- NOTES -  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
NOTICE  
DO NOT DISCARD THIS MANUAL  
• Important operating  
and maintenance  
instructions included.  
• Read, understand and follow  
these instructions for safe  
installation and operation.  
• Leave this manual with  
party responsible for use  
and operation.  
This product may be covered by one or more of the following patents: (United States) 4593510, 4686807, 4766876, 4793322, 4811534, 5000162,  
5016609, 5076254, 5113843, 5191877, 5218953, 5263471, 5328356, 5341794, 5347983, 5429495, 5452708, 5542407, 5601073, 5613487, 5647340,  
5688568, 5762062, 5775408, 5890485, 5931661, 5941237, 5947112, 5996575, 6006743, 6019099, 6048195, 6053165, 6145502, 6170481, 6237588,  
6296474, 6374822, 6413079, 6439226, 6484712, 6543698, 6550687, 6601579, 6672860, 6688302B2, 6715724B2, 6729551, 6736133, 6748940,  
6748942, 6769426, 6774802, 6796302, 6840261, 6848441, 6863064, 6866205, 6869278, 6875012, 6880275, 6908039, 6919884, D320652, D445174,  
D462436; (Canada) 1297749, 2195264, 2225408, 2313972; (Australia) 780250, 780403, 1418504 or other U.S. and foreign patents pending.  
Printed in U.S.A. - Copyright 2009  
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09  
Download from Www.Somanuals.com. All Manuals Search And Download.  
73  

Grizzly Dust Collector G0508 User Manual
Haier Heat Pump HR18D2VAR User Manual
Hand Held Products Laptop Dolphin 7400 User Manual
Hasbro Electronic Keyboard 9 008 1 User Manual
Hasbro Motorized Toy Car 03102 User Manual
Healthrider Treadmill HRTL10980 User Manual
Heath Zenith Door 598 1143 01 User Manual
Honeywell Marine Lighting SG 60 User Manual
Husqvarna Lawn Mower YTH24V48LS User Manual
IKEA Plumbing Product AA 99076 6 User Manual