Fujitsu Server C122 E119EN User Manual

C122-H004-07EN  
PRIMEQUEST 1000 Series  
Hardware Installation Manual  
FUJITSU LIMITED  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Preface  
This manual describes the specifications and installation location requirements of PRIMEQUEST 1000 series  
installation. The manual is intended for system administrators.  
For details on the regulatory compliance statements and safety precautions, see the PRIMEQUEST 1000 Series  
Safety and Regulatory Information (C122-E115XA).  
Errata and addenda for the manual  
The PRIMEQUEST 1000 Series Errata and Addenda (C122-E119EN) provides errata and addenda for the  
manual. Read the PRIMEQUEST 1000 Series Errata and Addenda (C122-E119EN) thoroughly in reference to the  
manual.  
For Safe Operation  
How to use this manual  
This manual contains important information about the safe use of this product. Read the manual thoroughly to  
understand the information in it before using this product. Be sure to keep this manual in a safe and convenient  
location for quick reference.  
Fujitsu makes every effort to prevent users and bystanders from being injured and to prevent property damage. Be  
sure to use the product according to the instructions in the manual.  
About this product  
This product is designed and manufactured for standard applications. Such applications include, but are not limited  
to, general office work, personal and home use, and general industrial use. The product is not intended for  
applications that require extremely high levels of safety to be guaranteed (referred to below as "safety-critical"  
applications). Use of the product for a safety-critical application may present a significant risk of personal injury  
and/or death. Such applications include, but are not limited to, nuclear reactor control, aircraft flight control, air  
traffic control, mass transit control, medical life support, and missile launch control. Customers shall not use the  
product for a safety-critical application without guaranteeing the required level of safety. Customers who plan to  
use the product in a safety-critical system are requested to consult the Fujitsu sales representatives in charge.  
Storage of accessories  
Keep the accessories in a safe place because they are required for server operation.  
Organization and Notation of This Manual  
This section describes the following topics:  
i
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Organization of this manual  
This manual is organized as follows.  
Chapter 1 provides various useful information on PRIMEQUEST 1000 series installation. The information  
includes device configuration details, device outline drawings, installation specifications, and various layout  
diagrams.  
Chapter 2 describes the cables used with the PRIMEQUEST 1000 series and provides an overview of cable  
connections.  
Chapter 3 provides notes on carrying in and installing the PRIMEQUEST 1000 series server.  
Appendix A provides various information on the mounting racks for the PRIMEQUEST 1000 series and  
PCI_Box.  
Appendix B describes the UPC interface that can be used with the PRIMEQUEST 1000 series.  
The index lists keywords and the pages that they refer to, helping readers quickly find the necessary  
information in the manual.  
Manuals for the PRIMEQUEST 1000 series  
The following manuals have been prepared to provide you with the information necessary to use the PRIMEQUEST  
1000 series.  
You can access HTML versions of these manuals at the following sites:  
Title  
Description  
Manual code  
PRIMEQUEST 1000 Series Describes what manuals you should read and how to C122-E114XA  
Getting Started Guide  
access important information after unpacking the  
PRIMEQUEST 1000 series server. (This manual  
comes with the product.)  
PRIMEQUEST 1000 Series Contains important information required for using the C122-E115XA  
Safety and Regulatory  
Information  
PRIMEQUEST 1000 series safely.  
PRIMEQUEST 1000 Series Provides errata and addenda for the PRIMEQUEST  
C122-E119EN  
C122-B022EN  
Errata and Addenda  
1000 series manuals. This manual will be updated as  
needed.  
PRIMEQUEST 1000  
Describes the functions and features of the  
Series General Description PRIMEQUEST 1000 series.  
ii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Title  
Description  
Manual code  
SPARC Enterprise/  
PRIMEQUEST Common  
Installation Planning  
Manual  
Provides the necessary information and concepts you C120-H007EN  
should understand for installation and facility planning  
for SPARC Enterprise and PRIMEQUEST  
installations.  
PRIMEQUEST 1000  
Series Hardware  
Includes the specifications of and the installation  
location requirements for the PRIMEQUEST 1000  
series.  
C122-H004EN  
Installation Manual  
PRIMEQUEST 1000  
Describes how to set up the PRIMEQUEST 1000  
C122-E107EN  
Series Installation Manual series server, including the steps for installation  
preparation, initialization, and software installation.  
PRIMEQUEST 1000 Series Describes how to use the Web-UI and UEFI to assure C122-E109EN  
User Interface Operating  
Instructions  
proper operation of the PRIMEQUEST 1000  
series server.  
PRIMEQUEST 1000 Series Describes how to use tools and software for system  
C122-E108EN  
C122-E110EN  
C122-E111EN  
Administration Manual  
administration and how to maintain the system  
(component replacement and error notification).  
PRIMEQUEST 1000  
Series Tool Reference  
Provides information on operation methods and  
settings, including details on the MMB, PSA, and UEFI  
functions.  
PRIMEQUEST 1000  
Lists the messages that may be displayed when a  
Series Message Reference problem occurs during operation and describes how to  
respond to them.  
PRIMEQUEST 1000 Series Describes REMCS service installation and operation. C122-E120EN  
REMCS Installation Manual  
PRIMEQUEST 1000 Series Defines the PRIMEQUEST 1000 series related terms C122-E116EN  
Glossary  
and abbreviations.  
PRIMEQUEST 1000 Series Gives a revised version of APPENDIX D Configuring C122-E155EN  
SAN Boot Environment  
Configuration Manual  
the SAN Boot Environment in the PRIMEQUEST 1000  
Series Installation Manual (C122-E107EN). This  
manual describes procedures for installing the SAN  
boot environment and provides the latest information  
including notes on design.  
Related manuals  
The following manuals relate to the PRIMEQUEST 1000 series.  
You can access these manuals at the following site:  
Contact your sales representative for inquiries about the ServerView manuals.  
iii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Title  
Description  
Manual code  
ServerView Suite  
Describes how to install and start ServerView  
Operations Manager in a Windows environment.  
None  
None  
None  
ServerView Operations  
Manager Quick Installation  
(Windows)  
ServerView Suite  
Describes how to install and start ServerView  
Operations Manager in a Linux environment.  
ServerView Operations  
Manager Quick Installation  
(Linux)  
ServerView Suite  
ServerView Installation  
Manager  
Describes the installation procedure using  
ServerView Installation Manager.  
ServerView Suite  
ServerView Operations  
Manager Server  
Management  
Provides an overview of server monitoring using None  
ServerView Operations Manager, and describes  
the user interface of ServerView Operations  
Manager.  
ServerView Suite  
Describes RAID management using ServerView None  
RAID Manager.  
ServerView RAID  
Management User Manual  
ServerView Suite  
Basic Concepts  
Describes basic concepts about ServerView  
Suite.  
None  
ServerView Operations  
Manager  
Describes installation and update installation of None  
ServerView Linux Agent.  
Installation ServerView  
Agents for Linux  
ServerView Operations  
Manager  
Describes installation and update installation of None  
ServerView Windows Agent.  
Installation ServerView  
Agents for Windows  
ServerView Mission  
Critical Option User  
Manual  
Describes the necessary functions unique to  
PRIMEQUEST (notification via the MMB, hot  
replacement command) and ServerView Mission  
Critical Option (SVmco), which is required for  
supporting these functions.  
None  
ServerView RAID Manager Describes the installation and settings required to None  
VMware vSphere ESXi 5  
Installation Guide  
use ServerView RAID Manager on the VMware  
vSphere ESXi 5 server.  
MegaRAID SAS Software  
Provides technical information on using array  
controllers.  
None  
Refer to the manual from the SVS-DVD2  
supplied with the product or from the following  
URL:  
iv  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Title  
Description  
Manual code  
The Fujitsu Technology Solutions manuals server  
MegaRAID SAS Device  
Driver Installation  
Provides technical information on using array  
controllers.  
None  
Refer to the manual from the SVS-DVD2  
supplied with the product or from the following  
URL:  
The Fujitsu Technology Solutions manuals server  
Modular RAID Controller Provides technical information on using array  
None  
Installation Guide  
controllers.  
Refer to the manual from the SVS-DVD2  
supplied with the product or from the following  
URL:  
The Fujitsu Technology Solutions manuals server  
Abbreviations  
This manual uses the following product name abbreviations.  
Formal product name  
Abbreviation  
Red Hat® Enterprise Linux® 5 (for Intel 64)  
Linux  
RHEL5, RHEL  
Red Hat® Enterprise Linux® 5 (for x86)  
Red Hat® Enterprise Linux® 6 (for Intel64)  
Linux  
RHEL6, RHEL  
Red Hat® Enterprise Linux® 6 (for x86)  
Microsoft® Windows Server® 2003, Standard Edition  
Microsoft® Windows Server® 2003, Enterprise Edition  
Microsoft® Windows Server® 2003, Datacenter Edition  
Microsoft® Windows Server® 2003, Standard x64 Edition  
Microsoft® Windows Server® 2003, Enterprise x64 Edition  
Microsoft® Windows Server® 2003, Datacenter x64 Edition  
Microsoft® Windows Server® 2003 R2, Standard Edition  
Microsoft® Windows Server® 2003 R2, Enterprise Edition  
Microsoft® Windows Server® 2003 R2, Datacenter Edition  
Microsoft® Windows Server® 2003 R2, Standard x64 Edition  
Microsoft® Windows Server® 2003 R2, Enterprise x64 Edition  
Microsoft® Windows Server® 2003 R2, Datacenter x64 Edition  
Windows  
Windows Server 2003  
v
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Formal product name  
Microsoft® Windows Server® 2008 Standard  
Microsoft® Windows Server® 2008 Enterprise  
Microsoft® Windows Server® 2008 Datacenter  
Microsoft® Windows Server® 2008 R2 Standard  
Microsoft® Windows Server® 2008 R2 Enterprise  
Microsoft® Windows Server® 2008 R2 Datacenter  
VMware vSphere(R) 4  
Abbreviation  
Windows  
Windows Server 2008  
vSphere 4, VMware 4  
vSphere 5, VMware 5  
ESX, ESX 4.x  
VMware vSphere(R) 5  
VMware(R) ESX(R) 4  
VMware(R) ESXi(TM) 5  
ESXi, ESXi 5.x  
Notation  
This manual uses the following fonts and symbols to express specific types of information.  
Font or  
symbol  
Meaning  
Example  
italics  
Title of a manual that you should refer to  
See the PRIMEQUEST 1000 Series  
Installation Manual (C122-E107EN).  
[ ]  
Window names as well as the names of buttons,  
tabs, and drop-down menus in windows are  
enclosed in brackets.  
Click the [OK] button.  
Notation for the CLI (command line interface)  
The following notation is used for commands.  
Command syntax  
Command syntax is represented as follows.  
- Variables requiring the entry of a value are enclosed in angle brackets < >.  
- Optional elements are enclosed in brackets [ ].  
- Options for optional keywords are grouped in | (stroke) separated lists enclosed in brackets [ ].  
- Options for required keywords are grouped in | (stroke) separated lists enclosed in braces { }.  
Command syntax is written in a box.  
Remarks  
The command output shown in the PDF manuals may include line feeds at places where there is no line feed symbol  
(\ at the end of the line).  
vi  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Notes on notations  
- In this manual, the Management Board and MMB firmware are abbreviated as "MMB."  
- In this manual, IOBs and GSPBs (LIOBs and LGSPBs within partitions) are collectively referred to as IO  
Units.  
- Screenshots contained in this manual may differ from the actual product screen displays.  
- The IP addresses, configuration information, and other such information contained in this manual are display  
examples and differ from that for actual operation.  
Alert messages  
This manual uses the following alert messages to prevent users and bystanders from being injured and to prevent  
property damage.  
This indicates a hazardous (potentially dangerous) situation that is likely to result in death  
or serious personal injury if the user does not perform the procedure correctly.  
This indicates a hazardous situation that could result in minor or moderate personal injury  
if the user does not perform the procedure correctly. This also indicates that damage to the  
product or other property may occur if the user does not perform the procedure correctly.  
This indicates information that could help the user use the product more efficiently.  
Alert messages in the text  
An alert statement follows an alert symbol. An alert statement is indented on both ends to distinguish it from regular  
text. Similarly, one space line is inserted before and after the alert statement.  
Only Fujitsu certified service engineers should perform the following tasks on this product  
and the options provided by Fujitsu. Customers must not perform these tasks under any  
circumstances. Otherwise, electric shock, injury, or fire may result.  
- Newly installing or moving equipment  
- Removing the front, rear, and side covers  
- Installing and removing built-in options  
- Connecting and disconnecting external interface cables  
- Maintenance (repair and periodic diagnosis and maintenance)  
The List of important alert items table lists important alert items.  
Product operating environment  
This product is a computer intended for use in a computer room environment. For details on the product operating  
environment, see this manual.  
Note  
- If you have a comment or request regarding this manual, or if you find any part of this manual unclear, please  
take a moment to share it with us by filling in the form at the following webpage, stating your points  
specifically, and sending the form to us:  
- The contents of this manual may be revised without prior notice.  
vii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
- The PDF file of this manual is intended for display using Adobe® Reader® in single page viewing mode at  
100% zoom.  
- The PRIMEQUEST 1800E2/1800E model supports only 200 V power supply.  
Trademarks  
- Microsoft, Windows, and Windows Server are trademarks or registered trademarks of Microsoft Corporation  
in the United States and/or other countries.  
- Linux is a trademark or registered trademark of Linus Torvalds in the United States and other countries.  
- Red Hat, RPM, and all Red Hat based trademarks and logos are trademarks or registered trademarks of Red  
Hat, Inc. in the United States and other countries.  
- Intel and Xeon are trademarks or registered trademarks of Intel Corporation.  
- Ethernet is a registered trademark of Fuji Xerox Co., Ltd. in Japan and is a registered trademark of Xerox  
Corp. in the United States and other countries.  
- VMware is a trademark or registered trademark of VMware, Inc. in the United States and other countries.  
- Xen is a trademark or registered trademark of Citrix Systems, Inc. or its subsidiaries in the United States and  
other countries.  
- Other company names and product names are the trademarks or registered trademarks of their respective  
owners.  
- Trademark indications are omitted for some system and product names in this manual.  
Safety Precautions  
List of important alert items  
This manual does not contain important alert items.  
Warning labels  
The following warning labels are affixed to this product. These labels are intended for the users of this product.  
Never remove the warning labels.  
viii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
* The label is affixed at either location.  
Warning label location (PRIMEQUEST 1800E2/1800E rear)  
Warning label location (PRIMEQUEST 1800E2/1800E rear) (IOBs removed)  
ix  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Warning label location (PCI_Box)  
Notes on Handling the Product  
Adding optional products  
For stable operation of the PRIMEQUEST 1000 series server, use only a Fujitsu certified optional product as an  
added option.  
Note that the PRIMEQUEST 1000 series server is not guaranteed to operate with any optional product not certified  
by Fujitsu.  
Maintenance  
Only Fujitsu certified service engineers should perform the following tasks on this  
product and the options provided by Fujitsu. Customers must not perform these tasks  
under any circumstances. Otherwise, electric shock, injury, or fire may result.  
- Newly installing or moving equipment  
- Removing the front, rear, and side covers  
- Installing and removing built-in options  
- Connecting and disconnecting external interface cables  
- Maintenance (repair and periodic diagnosis and maintenance)  
Only Fujitsu certified service engineers should perform the following tasks on this  
product and the options provided by Fujitsu. Customers must not perform these tasks  
under any circumstances. Otherwise, product failure may result.  
x
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
- Unpacking an optional Fujitsu product, such as an optional adapter, delivered to  
the customer  
Modifying or recycling the product  
Modifying this product or recycling a secondhand product by overhauling it without prior  
approval may result in personal injury to users and/or bystanders or damage to the product  
and/or other property.  
Note on erasing data from hard disks when disposing of the product or transferring  
it  
Disposing of this product or transferring it as is may enable third parties to access the data on the hard disk and use  
it for unforeseen purposes. To prevent the leakage of confidential information and important data, all of the data  
on the hard disk must be erased before disposal or transfer of the product.  
However, it can be difficult to completely erase all of the data from the hard disk. Simply initializing (reformatting)  
the hard disk or deleting files on the operating system is insufficient to erase the data, even though the data appears  
at a glance to have been erased. This type of operation only makes it impossible to access the data from the operating  
system. Malicious third parties can restore this data.  
If you save your confidential information or other important data on the hard disk, you should completely erase the  
data, instead of simply carrying out the aforementioned operation, to prevent the data from being restored.  
To prevent important data on the hard disk from being leaked when the product is disposed of or transferred, you  
will need to take care to erase all the data recorded on the hard disk on your own responsibility.  
Furthermore, if a software license agreement restricts the transfer of the software (operating system and application  
software) on the hard disk in the server or other product to a third party, transferring the product without deleting  
the software from the hard disk may violate the agreement. Adequate verification from this point of view is also  
necessary.  
Support and service  
SupportDesk (available only in Japan, for a fee)  
For stable system operation, we recommend concluding our SupportDesk agreement, which provides a maintenance  
and operation support service. SupportDesk agreement customers receive a same-day response service for hardware  
problems. They are eligible for regular checkups, remote notification of potential-failure predictions, and  
information on system problems. Moreover, they can avail themselves of other services such as troubleshooting  
support by phone for hardware and software problems, and access to operation support information from a dedicated  
Product and service inquiries  
For all product use and technical inquiries, contact the distributor where you purchased your product, or a Fujitsu  
sales representative or systems engineer (SE). If you do not know the appropriate contact address for inquiries about  
the PRIMEQUEST 1000 series, use the Fujitsu contact line.  
Fujitsu contact line  
We accept Web inquiries. For details, visit our website:  
xi  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Preface  
Warranty  
If a component failure occurs during the warranty period, we will repair it free of charge in accordance with the  
terms of the warranty agreement. For details, see the warranty.  
Before requesting a repair  
If a problem occurs with the product, confirm the problem by referring to 11.2 Troubleshooting in the  
PRIMEQUEST 1000 Series Administration Manual (C122-E108EN). If the error recurs, contact your sales  
representative or a field engineer. Confirm the model name and serial number shown on the label affixed to the  
right front of the device and report it. Also check any other required items beforehand according to 11.2  
Troubleshooting in the PRIMEQUEST 1000 Series Administration Manual (C122-E108EN). The system settings  
saved by the customer will be used during maintenance.  
Revision History  
Edition  
01  
Date  
Revised location (type) (*)  
Description  
2010-02-09 -  
-
Incorporated differences in Errata and  
Addenda (C122-E119-01EN)  
02  
03  
2010-03-12 All pages  
2010-08-20 All pages  
Incorporated differences in Errata and  
Addenda (C122-E119-02EN to C122-  
E119-10EN)  
- Added items about 1800E2  
- Incorporated differences in  
Errata and Addenda (C122-  
E119-11EN to C122-  
04  
2011-04-28 All pages  
E119-18EN)  
Incorporated differences in Errata and  
Addenda (C122-E119-19EN)  
05  
06  
2011-05-31 All pages  
2011-12-20 All pages  
Incorporated differences in Errata and  
Addenda (C122- E119-20EN to C122-  
E119-24EN)  
Added items about 19-inch racks  
(models 2742/2737/2724/2642/  
2624/2616)  
07  
2012-06-19 Chapter 1 and Appendix A  
* Chapter, section, and item numbers in the "Revised location" column refer to those in the latest edition of the  
document. However, a number marked with an asterisk (*) denotes a chapter, section, or item in a previous edition  
of the document.  
This manual shall not be reproduced or copied without the permission of Fujitsu Limited.  
Copyright 2010 - 2012 FUJITSU LIMITED  
xii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Contents  
Contents  
CHAPTER 1 Installation Information .................................................................................................................. 1  
1.1 Device Configuration Details .................................................................................................................... 2  
1.2 Outline Drawings of the Devices ............................................................................................................... 3  
1.2.1 PRIMEQUEST 1800E2/1800E outline drawings ................................................................................. 3  
1.2.2 PCI_Box outline drawings ................................................................................................................... 4  
1.3 Installation Specifications ......................................................................................................................... 6  
1.3.1 PRIMEQUEST 1800E2 installation specifications ............................................................................... 6  
1.3.2 PRIMEQUEST 1800E installation specifications ................................................................................. 7  
1.3.3 PCI_Box installation specifications ...................................................................................................... 9  
1.4 Installation Area ...................................................................................................................................... 11  
1.5 Cooling and Exhaust Air Flows in the Devices ....................................................................................... 14  
1.5.1 Cooling and exhaust air flows in the PRIMEQUEST 1800E2/1800E ................................................ 14  
1.5.2 Cooling and exhaust air flows in the PCI_Box .................................................................................. 15  
1.6 Installation Environment ......................................................................................................................... 16  
1.6.1 Dust ................................................................................................................................................... 16  
1.6.2 Corrosive gases ................................................................................................................................. 16  
1.6.3 Seawater (salt damage) .................................................................................................................... 17  
1.7 Security Actions ...................................................................................................................................... 18  
CHAPTER 2 Connection Information ............................................................................................................... 19  
2.1 Overview of Connections ........................................................................................................................ 20  
2.1.1 Overview of Connections (PRIMEQUEST 1800E2) .......................................................................... 20  
2.1.2 Overview of Connections (PRIMEQUEST 1800E) ............................................................................ 21  
2.2 Signal Cable Connections ...................................................................................................................... 23  
2.2.1 Basic interfaces and peripheral devices (PRIMEQUEST 1800E2) ................................................... 23  
2.2.2 Basic interfaces and peripheral devices (PRIMEQUEST 1800E) ..................................................... 25  
2.2.3 External interface connectors in detail .............................................................................................. 28  
2.3 Power Cable Connections ...................................................................................................................... 32  
2.3.1 Power cable connections of the PRIMEQUEST 1800E2/1800E ....................................................... 32  
2.3.2 Power cable connections of the PCI_Box ......................................................................................... 34  
2.4 Input Power Connection Specifications .................................................................................................. 38  
2.4.1 PRIMEQUEST 1000 series main unit ................................................................................................ 38  
2.4.2 PCI_Box ............................................................................................................................................ 38  
2.5 Power Cable Connections under a Raised Floor (Except in Europe) ..................................................... 40  
Box) .................................................................................................................................................... 41  
CHAPTER 3 Notes on Carrying In and Installing the Product ......................................................................... 43  
3.1 Elevator Load Conditions ........................................................................................................................ 44  
3.2 Earthquake Preparedness Measures ..................................................................................................... 45  
APPENDIX A Racks ........................................................................................................................................ 47  
A.1 Rack Mounting ....................................................................................................................................... 48  
A.1.1 Arrangements for installation work .................................................................................................... 48  
A.2 Rack Mounting Requirements ................................................................................................................ 51  
A.2.1 Requirements for mounting in a Fujitsu 19-inch rack ........................................................................ 51  
A.3 Fujitsu 19-inch Racks ............................................................................................................................. 60  
A.3.1 Types of 19-inch rack ....................................................................................................................... 60  
A.3.2 Outline drawings of 19-inch racks ..................................................................................................... 62  
A.3.3 Bottom view drawings of 19-inch racks ............................................................................................. 75  
APPENDIX B UPC Interface ............................................................................................................................ 81  
B.1 Overview ................................................................................................................................................ 82  
B.2 Signal Cable ........................................................................................................................................... 83  
B.3 Connection of Main Unit and CVCF and Signal Line Definitions ............................................................ 84  
xiii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Contents  
B.4 Cable Connector .................................................................................................................................... 86  
Index ................................................................................................................................................................. 87  
xiv  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Figures  
Figures  
Warning label location (PRIMEQUEST 1800E2/1800E rear) ............................................................................. ix  
Warning label location (PRIMEQUEST 1800E2/1800E rear) (IOBs removed) .................................................. ix  
Warning label location (PCI_Box) ....................................................................................................................... x  
FIGURE 1.1 PRIMEQUEST 1800E2/1800E (front view) ................................................................................... 3  
FIGURE 1.2 PRIMEQUEST 1800E2/1800E (rear view) .................................................................................... 3  
FIGURE 1.3 PRIMEQUEST 1800E2/1800E (top view) ..................................................................................... 4  
FIGURE 1.4 PRIMEQUEST 1800E2/1800E (right side view) ............................................................................ 4  
FIGURE 1.5 PCI_Box front view ........................................................................................................................ 5  
FIGURE 1.6 PCI_Box rear view ......................................................................................................................... 5  
FIGURE 1.7 PCI_Box top view .......................................................................................................................... 5  
FIGURE 1.8 PCI_Box right side view ................................................................................................................ 5  
FIGURE 1.13 Cooling and exhaust air flows in the PCI_Box .......................................................................... 15  
FIGURE 2.1 Overview of device connections (PRIMEQUEST 1800E2) ......................................................... 20  
FIGURE 2.2 Overview of device connections (PRIMEQUEST 1800E) ........................................................... 21  
1800E2) ................................................................................................................................................. 23  
................................................................................................................................................................ 26  
FIGURE 2.7 MMB external interfaces in detail ................................................................................................ 29  
FIGURE 2.8 IOB external interfaces in detail .................................................................................................. 30  
FIGURE 2.9 GSPB external interfaces in detail ............................................................................................... 30  
FIGURE 2.10 PCI_Box external interfaces in detail ........................................................................................ 31  
FIGURE 2.13 Dual power feed configuration ................................................................................................... 33  
................................................................................................................................................................ 35  
FIGURE 2.16 200 to 240 V dual power feed configuration .............................................................................. 36  
................................................................................................................................................................ 37  
FIGURE 2.20 Distribution panel breaker characteristics ................................................................................. 42  
FIGURE A.1 Caution on rack mounting ........................................................................................................... 51  
FIGURE A.2 Rack mounting requirements (PRIMEQUEST 1800E2/1800E) .................................................. 54  
FIGURE A.3 Cable holder locations ................................................................................................................ 55  
FIGURE A.4 Removing a cable holder (Model 1740) ...................................................................................... 56  
FIGURE A.5 Removing a cable holder (Model 1640/Model 1624) .................................................................. 57  
FIGURE A.6 Conditions of rack depth ............................................................................................................. 58  
FIGURE A.7 Conditions regarding rack posts ................................................................................................. 59  
xv  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Figures  
FIGURE A.20 Bottom view drawing of the (standard) 19-inch rack ................................................................. 76  
FIGURE A.21 Bottom view drawing of the (slim) 19-inch rack ........................................................................ 77  
78  
FIGURE A.23 Bottom view drawing of connected 19-inch racks (standard) ................................................... 79  
FIGURE A.24 Bottom view drawing of connected 19-inch racks (slim) ........................................................... 79  
FIGURE B.1 UPC port locations (PRIMEQUEST 1800E2/1800E) .................................................................. 82  
FIGURE B.2 Connection of the main unit and CVCF ...................................................................................... 84  
FIGURE B.3 Correspondence between UPC interface and signal cable pins ................................................. 86  
xvi  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Tables  
Tables  
TABLE 1.1 Device names and configuration details .......................................................................................... 2  
TABLE 1.2 PRIMEQUEST 1800E2 installation specifications ........................................................................... 6  
TABLE 1.3 PRIMEQUEST 1800E installation specifications ............................................................................. 7  
TABLE 1.4 PCI_Box installation specifications .................................................................................................. 9  
TABLE 1.5 Tolerable limits for corrosive gases ............................................................................................... 16  
TABLE 2.1 Notes on device connections (PRIMEQUEST 1800E2) ................................................................ 20  
TABLE 2.2 Notes on device connections (PRIMEQUEST 1800E) .................................................................. 22  
TABLE 2.6 Power cable specifications of the PCI_Box ................................................................................... 38  
39  
TABLE 2.8 Breaker characteristics for the customer's distribution panel ........................................................ 41  
TABLE 3.1 Elevator load conditions ................................................................................................................ 44  
TABLE A.1 Arrangements for installation work ................................................................................................ 48  
TABLE A.2 Recommended racks for mounting ............................................................................................... 52  
TABLE A.3 PRIMEQUEST 1000 series external dimensions* ......................................................................... 52  
TABLE A.4 Rack mounting requirements ........................................................................................................ 52  
TABLE A.5 Types of 19-inch rack .................................................................................................................... 60  
TABLE B.1 Signal line definitions .................................................................................................................... 84  
xvii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
Tables  
xviii  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CHAPTER 1  
Installation Information  
This chapter provides various useful information on PRIMEQUEST  
1000 series installation. The information includes device configuration  
details, device outline drawings, installation specifications, and  
various layout diagrams.  
1.1 Device Configuration Details ........................................ 2  
1.2 Outline Drawings of the Devices .................................. 3  
1.3 Installation Specifications ............................................. 6  
1.4 Installation Area ......................................................... 11  
1.6 Installation Environment ............................................. 16  
1.7 Security Actions ......................................................... 18  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.1  
Device Configuration Details  
TABLE 1.1 Device names and configuration details lists device names and configuration details.  
TABLE 1.1 Device names and configuration details  
Device name  
Description of configuration  
Size (height)  
PRIMEQUEST 1800E2/1800E  
Can accommodate up to 4 system boards (up to 8 12U  
CPUs) and up to 2 IO boards.  
PCI_Box  
Expands the number of PCI Express slots.  
Up to 2 units can be connected to the  
PRIMEQUEST 1800E2/1800E.  
4U  
The PCI Box has 12 PCI Express slots.  
Remarks  
inch racks. For details on the 19-inch racks, see APPENDIX A Racks or contact the distributor where you purchased  
your product, or your sales representative.  
2
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.2  
Outline Drawings of the Devices  
This section provides outline drawings of each device.  
1.2.1  
PRIMEQUEST 1800E2/1800E outline drawings  
This section includes outline drawings of the PRIMEQUEST 1800E2/1800E (front, rear, top, and right side views).  
PRIMEQUEST 1800E2/1800E (front view)  
FIGURE 1.1 PRIMEQUEST 1800E2/1800E (front view)  
PRIMEQUEST 1800E2/1800E (rear view)  
FIGURE 1.2 PRIMEQUEST 1800E2/1800E (rear view)  
3
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
             
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
PRIMEQUEST 1800E2/1800E (top view)  
FIGURE 1.3 PRIMEQUEST 1800E2/1800E (top view)  
PRIMEQUEST 1800E2/1800E (right side view)  
FIGURE 1.4 PRIMEQUEST 1800E2/1800E (right side view)  
1.2.2  
PCI_Box outline drawings  
This section includes outline drawings of the PCI_Box (front, rear, top, and right side views).  
PCI_Box front view  
4
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
FIGURE 1.5 PCI_Box front view  
PCI_Box rear view  
FIGURE 1.6 PCI_Box rear view  
PCI_Box top view  
FIGURE 1.7 PCI_Box top view  
PCI_Box right side view  
FIGURE 1.8 PCI_Box right side view  
5
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
               
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.3  
Installation Specifications  
This section lists the installation specifications of each device.  
1.3.1  
PRIMEQUEST 1800E2 installation specifications  
TABLE 1.2 PRIMEQUEST 1800E2 installation specifications  
Item  
Description  
482 (18.98)  
External  
Width  
dimensions  
[mm (in.)]  
Depth (*1)  
Height  
800 (31.50)  
530 (20.87)  
150 (330)  
14,400 (13,649)  
14 (494)  
Weight [kg (lb)] (*2)  
Air conditioning  
requirements  
Maximum heat output [kJ/h (BTU/h)]  
Exhaust air  
FAN at low speed (Low)  
flow [m3/min  
(ft3/min)] (*3)  
FAN at normal speed (Normal)  
FAN at high speed (High)  
21 (742)  
24 (848)  
Temperature Operating  
and humidity  
requirements  
(*4)  
Temperature [°C (°F)]  
Humidity [%RH]  
(*5)  
20 to 80  
Maximum wet-bulb  
temperature [°C (°F)]  
29 (84.2)  
Non-operating (*6) Temperature [°C (°F)]  
Humidity [%RH]  
0 to 50 (32 to 122)  
8 to 80  
Maximum wet-bulb  
temperature [°C (°F)]  
29 (84.2)  
Noise [dB] (*7) (*8)  
Acoustic power level [B] (*8)  
61  
7.8  
Allowable  
vibration [m/  
s2 (gal)]  
Operating (including standby state)  
4.0 (400) (synthetic seismic  
waves)  
Non-operating (*9)  
10.0 (1000) (synthetic  
seismic waves)  
Allowable dust concentration [mg/m3]  
Input voltage and number of phases  
0.15  
Power  
200 to 240 VAC ±10%  
requirements  
1φ  
Frequency and fluctuation range  
50/60 Hz +2/-4%  
6
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
Item  
Description  
4.00 kW / 4.21 kVA  
95 W / 126 VA  
Maximum  
power  
Operating  
Standby  
Input voltage: 200 V  
Input voltage: 200 V  
consumption/  
apparent  
power  
Power factor (*10)  
0.95 or more  
20 or less  
Rush current [A] (Inrush time) (*11)  
Leakage current [mA] (*12)  
3.5 or less  
*1 The dimensions do not include protrusions.  
*2 The values are for the device with all options installed.  
However, the values do not include the weight of mounted rack-mount rails (7 kg) and cables.  
You can use the following formula to calculate the weight of the device based on its configuration:  
Equipment weight = 86 + (11 x A) + (8 x B) + (2 x C) [kg]  
- A = Number of mounted SBs (1 to 4)  
- B = Number of mounted IO Units (1 or 2)  
- C = Number of mounted expansion power supply units (0 to 2)  
*3 If the intake air temperature is high (but within the normal temperature range), the fan enters high-speed mode  
even when operation is normal.  
*4 Condensation is not permitted.  
*5 The temperature requirements depend on the altitude at the installation site.  
- Installation at 0 to 500 m (0 to 1640 ft.) above sea level: 5 to 35°C (41 to 95.0°F)  
- Installation at 500 to 1000 m (1640 to 3281 ft.) above sea level: 5 to 34°C (41 to 93.2°F)  
- Installation at 1000 to 1500 m (3281 to 4921 ft.) above sea level: 5 to 33°C (41 to 91.4°F)  
- Installation at 1500 to 3000 m (4921 to 9843 ft.) above sea level: 5 to 30°C (41 to 86.0°F)  
The altitude specifications for the installation site include an allowable margin of error of ±100 m.  
*6 "Non-operating" refers to the condition where a device has been disconnected from the power supply and stored.  
*7 The actual acoustic noise level depends on the listener's location and the rack mounting conditions.  
*8 The noise and acoustic power levels depend on the ambient temperature.  
*9 "Non-operating" refers to the installed device in the power-off state.  
*10 This is the value during operation.  
*11 This value is for a single input cable.  
*12 This value is for a single device.  
1.3.2  
PRIMEQUEST 1800E installation specifications  
TABLE 1.3 PRIMEQUEST 1800E installation specifications  
Item  
Description  
482 (18.98)  
External  
Width  
dimensions  
[mm (in.)]  
Depth (*1)  
Height  
800 (31.50)  
530 (20.87)  
7
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
Item  
Description  
150 (330)  
Weight [kg (lb)] (*2)  
Air conditioning  
requirements  
Maximum heat output [kJ/h (BTU/h)]  
14,400 (13,649)  
14 (494)  
21 (742)  
24 (848)  
(*5)  
Exhaust air  
FAN at low speed (Low)  
flow [m3/min  
(ft3/min)] (*3)  
FAN at normal speed (Normal)  
FAN at high speed (High)  
Temperature Operating  
and humidity  
requirements  
(*4)  
Temperature [°C (°F)]  
Humidity [%RH]  
20 to 80  
Maximum wet-bulb  
temperature [°C (°F)]  
29 (84.2)  
Non-operating (*6) Temperature [°C (°F)]  
Humidity [%RH]  
0 to 50 (32 to 122)  
8 to 80  
Maximum wet-bulb  
temperature [°C (°F)]  
29 (84.2)  
Noise [dB] (*7) (*8)  
Acoustic power level [B] (*8)  
61  
7.8  
Allowable  
vibration [m/  
s2 (gal)]  
Operating (including standby state)  
4.0 (400) (synthetic seismic  
waves)  
Non-operating (*9)  
10.0 (1000) (synthetic  
seismic waves)  
Allowable dust concentration [mg/m3]  
Input voltage and number of phases  
0.15  
Power  
200 to 240 VAC ±10%  
Single phase  
requirements  
Frequency and fluctuation range  
50/60 Hz +2/-4%  
4.00 kW / 4.21 kVA  
95 W / 126 VA  
Maximum  
power  
Operating  
Standby  
Input voltage: 200 V  
Input voltage: 200 V  
consumption/  
apparent  
power  
Power factor (*10)  
0.95 or more  
20 or less  
Rush current [A] (Inrush time) (*11)  
Leakage current [mA] (*12)  
3.5 or less  
*1 The dimensions do not include protrusions.  
*2 The values are for the device with all options installed.  
However, the values do not include the weight of mounted rack-mount rails (7 kg) and cables.  
You can use the following formula to calculate the weight of the device based on its configuration:  
Equipment weight = 86 + (11 x A) + (8 x B) + (2 x C)  
8
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
- A = Number of mounted SBs (1 to 4)  
- B = Number of mounted IO Units (1 or 2)  
- C = Number of mounted expansion power supply units (0 to 2)  
*3 If the intake air temperature is high (but within the normal temperature range), the fan enters high-speed mode  
even when operation is normal.  
*4 Condensation is not permitted.  
*5 The temperature requirements depend on the altitude at the installation site.  
- Installation at 0 to 500 m (0 to 1640 ft.) above sea level: 5 to 35°C (41 to 95.0°F)  
- Installation at 500 to 1000 m (1640 to 3281 ft.) above sea level: 5 to 34°C (41 to 93.2°F)  
- Installation at 1000 to 1500 m (3281 to 4921 ft.) above sea level: 5 to 33°C (41 to 91.4°F)  
- Installation at 1500 to 3000 m (4921 to 9843 ft.) above sea level: 5 to 30°C (41 to 86.0°F)  
The altitude specifications for the installation site include an allowable margin of error of ±100 m.  
*6 "Non-operating" refers to the condition where a device has been disconnected from the power supply and stored.  
*7 The actual acoustic noise level depends on the listener's location and the rack mounting conditions.  
*8 The noise and acoustic power levels depend on the ambient temperature.  
*9 "Non-operating" refers to the installed device in the power-off state.  
*10 This is the value during operation.  
*11 This value is for a single input cable.  
*12 This value is for a single device.  
1.3.3  
PCI_Box installation specifications  
TABLE 1.4 PCI_Box installation specifications  
Item  
Description  
482 (18.98)  
External dimensions Width  
[mm (in.)]  
Depth (*1)  
740 (29.13)  
175 (6.89)  
35 (77)  
Height  
Weight [kg (lb)] (*2)  
Air conditioning  
requirements  
Maximum heat output [kJ/h (BTU/h)]  
1,656 (1,570)  
3 (106)  
Exhaust air flow  
[m3/min (ft3/min)]  
(*3)  
FAN at low speed (Low)  
FAN at normal speed (Normal)  
FAN at high speed (High)  
4 (141)  
5 (177)  
Temperature and  
humidity  
Operating  
Temperature [°C (°F)] (*5)  
Humidity [%RH]  
20 to 80  
requirements (*4)  
Maximum wet-bulb  
temperature [°C (°F)]  
29 (84.2)  
Non-operating (*6) Temperature [°C (°F)] 0 to 50 (32 to 122)  
Humidity [%RH]  
8 to 80  
Maximum wet-bulb  
temperature [°C (°F)]  
29 (84.2)  
9
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
Item  
Description  
Noise [dB]  
(Included in main  
unit specifications)  
Acoustic power level [B]  
(Included in main  
unit specifications)  
Allowable vibration Operating (including standby state)  
[m/s2 (gal)]  
4.0 (400) (synthetic  
seismic waves)  
Non-operating (*6)  
10.0  
(1000) (synthetic  
seismic waves)  
Allowable dust concentration [mg/m3]  
0.15  
Power requirements Input voltage and number of phases  
200 to 240  
VAC ±10%  
100 to 120  
VAC ±10%  
1φ  
Frequency and fluctuation range  
50/60 Hz +2/-4%  
450 W / 475 VA  
460 W / 485 VA  
10 W / 40 VA  
Maximum power  
consumption/  
Operating  
Input voltage: 200 V  
Input voltage: 100 V  
Input voltage: 200 V  
Input voltage: 100 V  
apparent power  
Standby  
10 W / 35 VA  
Power factor (*7)  
0.95 or more  
25 or less  
Rush current [A] (Inrush time) (*8)  
Leakage current [mA] (*9)  
3.5 or less  
*1 The dimensions do not include protrusions.  
*2 The values are for the device with all options installed.  
However, the values do not include the weight of mounted rack-mount rails (7 kg) and cables.  
*3 If the intake air temperature is high (but within the normal temperature range), the fan enters high-speed mode  
even when operation is normal.  
*4 Condensation is not permitted.  
*5 The temperature requirements depend on the altitude at the installation site.  
- Installation at 0 to 500 m (0 to 1640 ft.) above sea level: 5 to 35°C (41 to 95.0°F)  
- Installation at 500 to 1000 m (1640 to 3281 ft.) above sea level: 5 to 34°C (41 to 93.2°F)  
- Installation at 1000 to 1500 m (3281 to 4921 ft.) above sea level: 5 to 33°C (41 to 91.4°F)  
- Installation at 1500 to 3000 m (4921 to 9843 ft.) above sea level: 5 to 30°C (41 to 86.0°F)  
The altitude specifications for the installation site include an allowable margin of error of ±100 m.  
*6 "Non-operating" refers to the condition where a device has been disconnected from the power supply and stored.  
*7 This is the value during operation.  
*8 This value is for a single input cable.  
*9 This value is for a single device.  
10  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.4  
Installation Area  
This section shows the installation area and service areas of the PRIMEQUEST 1000 series and PCI_Box. The  
diagrams assume that the devices are mounted in Fujitsu 19-inch racks.  
The actual installation and service areas may vary depending on the 19-inch rack with the mounted device. For  
details on the 19-inch racks, see APPENDIX A Racks or contact the distributor where you purchased your product,  
or your sales representative.  
No.  
Description  
(1)  
(2)  
Service area  
Front of the device  
FIGURE 1.9 Service area with the 19-inch rack model 1740 (19R-174xx) installed  
11  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
No.  
Description  
(1)  
(2)  
Service area  
Front of the device  
FIGURE 1.10 Service area with the 19-inch rack model 1640 (19R-164xx) installed  
12  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
No.  
Description  
(1)  
(2)  
Service area  
Front of the device  
FIGURE 1.11 Service area with the 19-inch rack model 1624 (19R-162xx) installed  
13  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.5  
Cooling and Exhaust Air Flows in the Devices  
This section shows the cooling and exhaust air flows in each device.  
Note  
An important consideration in the planning for installation of the device is the cooling and exhaust air flows. If the  
device is installed without regard to these air flows, the device may take in exhaust air from another device, or vice  
versa. The exhaust air would likely have an effect on that device. Such an installation runs the risk of continuous  
output of intake air temperature alarms from this device or another device that monitors the intake air temperature.  
1.5.1  
Cooling and exhaust air flows in the PRIMEQUEST 1800E2/1800E  
No.  
Description  
Air intake  
(1)  
(2)  
(3)  
Exhaust air  
Exhaust vent  
FIGURE 1.12 Cooling and exhaust air flows in the PRIMEQUEST 1800E2/1800E  
14  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.5.2  
Cooling and exhaust air flows in the PCI_Box  
No.  
Description  
Air intake  
(1)  
(2)  
(3)  
Exhaust air  
Exhaust vent  
FIGURE 1.13 Cooling and exhaust air flows in the PCI_Box  
15  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.6  
Installation Environment  
This section describes matters regarding the installation environment of equipment.  
1.6.1  
Dust  
Airborne dust  
Ensure that airborne dust does not exceed 0.15 mg/m3 in computer rooms. Most computers are designed to withstand  
this level of airborne dust. This is the same as the permissible level for airborne dust in a general office and should  
be easily attainable in a computer room where there is little inflow of outside air containing airborne dust and  
cigarette smoke.  
Removing dust  
Airborne dust is collected by air filters in the air conditioner. The computer room must be periodically cleaned to  
remove dust on and under the floor. Cleaning is required in the following situations:  
- When the construction of the computer room has just been completed, and it is ready to house equipment.  
- When the computer room has been repaired.  
- When equipment already in position in the computer room has been relocated.  
1.6.2  
Corrosive gases  
Corrosive gases must be removed and kept out by using appropriate air cleaning facilities. Maintaining positive  
pressure in the computer room with filtered air will serve as a safeguard against the entry of corrosive gases from  
an outside source. TABLE 1.5 Tolerable limits for corrosive gases lists the tolerable limits for different kinds of  
corrosive gases.  
TABLE 1.5 Tolerable limits for corrosive gases  
Gas name  
Hydrogen sulfide (H2S)  
Tolerable limit  
7.1 ppb and under  
37 ppb and under  
6.6 ppb and under  
3.4 ppb and under  
3.6 ppb and under  
52 ppb and under  
420 ppb and under  
5 ppb and under  
Sulfur dioxide (sulfur oxide) (SO2)  
Hydrogen chloride (HCI)  
Chlorine (CI2)  
Hydrogen fluoride (HF)  
Nitrogen dioxide (nitrogen oxide) (NO2)  
Ammonia (NH3)  
Ozone (O3)  
Oil vapor  
0.2 mg/m3 and under  
16  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.6.3  
Seawater (salt damage)  
The air in the vicinity of coastal areas contains large amounts of airborne sea salt particles. If these particles remain  
inside computers, substances are formed by a condensation reaction of chemicals. These substances and the  
humidity lead to insulation failure and the corrosion and deterioration of components and materials. Therefore,  
computers should be installed in locations at a distance from coastal areas.  
The following outlines installation criteria for preventing salt water damage due to airborne sea salt particles.  
Criteria: The installation site shall not be within 0.5 km of the ocean or coastal areas (unless the computer room  
uses air conditioners to filter out airborne sea salt particles from outside air).  
17  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 1 Installation Information  
1.7  
Security Actions  
For details on security actions, see "CHAPTER 8 Security Actions" in the SPARC  
Enterprise/PRIMEQUEST Common Installation Planning Manual (C120-H007EN).  
18  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2  
Connection Information  
This chapter describes the cables used with the PRIMEQUEST 1000  
series and provides an overview of cable connections.  
2.1 Overview of Connections ........................................... 20  
2.2 Signal Cable Connections .......................................... 23  
2.3 Power Cable Connections .......................................... 32  
in Europe) .............................................................. 40  
................................................................................ 41  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.1  
Overview of Connections  
This section describes an overview of connections for the PRIMEQUEST 1000 series.  
2.1.1  
Overview of Connections (PRIMEQUEST 1800E2)  
FIGURE 2.1 Overview of device connections (PRIMEQUEST 1800E2) shows an overview of device connections  
for the PRIMEQUEST 1800E2.  
FIGURE 2.1 Overview of device connections (PRIMEQUEST 1800E2)  
TABLE 2.1 Notes on device connections (PRIMEQUEST 1800E2)  
Number in  
Component  
Description  
Figure 2.1  
*1  
System board  
PRIMEQUEST 1800E2 Up to 4 units can be  
mounted.  
*2  
IO board PRIMEQUEST 1800E2 Up to 2 units can be  
mounted.  
IO unit  
20  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
             
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
Number in  
Component  
Figure 2.1  
Description  
*3  
*4  
*5  
GSPB  
PRIMEQUEST 1800E2 Up to 2 units can be  
mounted.  
MMB  
PRIMEQUEST 1800E2 Up to 2 units can be  
mounted.  
PCI_Box  
PRIMEQUEST 1800E2 Up to 2 units can be  
connected.  
2.1.2  
Overview of Connections (PRIMEQUEST 1800E)  
FIGURE 2.2 Overview of device connections (PRIMEQUEST 1800E) shows an overview of device connections  
for the PRIMEQUEST 1800E.  
FIGURE 2.2 Overview of device connections (PRIMEQUEST 1800E)  
21  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
TABLE 2.2 Notes on device connections (PRIMEQUEST 1800E)  
Number in  
Component  
Description  
PRIMEQUEST 1800E Up to 4 units can be  
Figure 2.2  
*1  
System board  
mounted.  
*2  
*3  
*4  
*5  
IO board PRIMEQUEST 1800E  
Up to 2 units can be  
mounted.  
IO unit  
GSPB  
PRIMEQUEST 1800E  
PRIMEQUEST 1800E  
PRIMEQUEST 1800E  
Up to 2 units can be  
mounted.  
MMB  
Up to 2 units can be  
mounted.  
PCI_Box  
Up to 2 units can be  
connected.  
22  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.2  
Signal Cable Connections  
This section provides a cable connection diagram and a list of signal cables. The section also describes dos and  
don'ts on cable preparation.  
2.2.1  
Basic interfaces and peripheral devices (PRIMEQUEST 1800E2)  
1800E2) shows a diagram of cable connections for the basic interfaces and peripheral devices of the PRIMEQUEST  
cables.  
Cable connection diagram (PRIMEQUEST 1800E2)  
FIGURE 2.3 Interface cable connections (for the basic interfaces and peripheral devices) (PRIMEQUEST  
1800E2)  
Remarks  
23  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
- For a 10GBase-CR cable, use the 10GBase-CR (TWINAX) cable specified for the connected switch product.  
List of cables  
Determine the length of an external interface cable by considering the extra length required for laying the cable  
inside the cabinet.  
TABLE 2.3 Cables (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E2)  
No.  
(1)  
Name  
Model name  
TPCBL-B005  
TPCBL-B010  
TPCBL-B015  
TPCBL-B030  
TPCBL-B050  
TPCBL-B100  
Commercially available types  
Length  
Twisted-pair cable  
(Category 5  
Sold separately: Select from lengths of 5, 10, 5 m  
15, 30, 50, and 100 m.  
10 m  
UTP cable)  
100Base-TX and 10Base-T connections use  
15 m  
this cable (Category 5).  
RJ45 8Pin - RJ45 8Pin  
30 m  
50 m  
100 m  
(2)  
Enhanced Category 5 TPCBL-C005  
Sold separately: Select from lengths of 5, 10, 5 m  
UTP cable  
15, 30, 50, and 100 m.  
TPCBL-C010  
10 m  
1000Base-T, 100Base-TX, and 10Base-  
TPCBL-C015  
TPCBL-C030  
TPCBL-C050  
TPCBL-C100  
15 m  
T connections use this cable (Category 5e).  
RJ45 8Pin - RJ45 8Pin  
30 m  
50 m  
100 m  
(3)  
(4)  
SAS cable  
CBL-SASM1U Sold separately: Select from lengths of 1.5 1.5 m  
and 3 m.  
miniSAS (SFF-8088) - miniSAS (SFF-8088)  
CBL-SASM3U  
3 m  
For use in countries other than Japan  
RS232C cable  
FMV-CBL501  
1.5 m  
(D-Sub 9Pin-9Pin,  
crossover cable)  
(5)  
(6)  
PCI Express cable  
Included with  
PCI_Box  
2 m  
Multimode  
CBL-MLLB02  
CBL-MLLB05  
CBL-MLLB15  
Sold separately: Select from lengths of 2, 5, 2 m  
Fibre Channel cable  
and 15 m.  
5 m  
Dual LC connector - Dual LC connector  
15 m  
Without cable insulation  
CBL-MLLC05  
CBL-MLLC10  
CBL-MLLC20  
CBL-MLLC30  
Sold separately: Select from lengths of 5, 10, 5 m  
20, 30, 40, and 50 m.  
10 m  
Dual LC connector - Dual LC connector  
20 m  
With cable insulation  
30 m  
24  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
No.  
Name  
Model name  
CBL-MLLC40  
CBL-MLLC50  
Commercially available types  
Length  
40 m  
50 m  
CBL-MLLD1A Sold separately: 100 m (with cable  
insulation)  
100 m  
Dual LC connector - Dual LC connector  
(7)  
Multimode  
Fibre Channel cable  
CBL-MLSB02  
CBL-MLSB05  
CBL-MLSB15  
Sold separately: Select from lengths of 2, 5, 2 m  
and 15 m.  
5 m  
Dual LC connector - Dual SC connector  
Without cable insulation  
15 m  
CBL-MLSC05  
CBL-MLSC10  
CBL-MLSC20  
CBL-MLSC30  
CBL-MLSC40  
CBL-MLSC50  
Sold separately: Select from lengths of 5, 10, 5 m  
20, 30, 40, and 50 m.  
10 m  
Dual LC connector - Dual SC connector  
20 m  
With cable insulation  
30 m  
40 m  
50 m  
CBL-MLSA1A Sold separately: 100 m (with cable  
insulation)  
100 m  
Dual LC connector - Dual SC connector  
(8)  
SAS cable  
PG-CBLA014/  
PG-CBLA015/  
PG-CBLA016  
Sold separately: Select from lengths of 2, 4, 2 m  
and 6 m.  
4 m  
6 m  
miniSAS (SFF-8088) - miniSAS (SFF-8088)  
For a 10GBase-CR cable, use the 10GBase-CR (TWINAX) cable specified for the connected switch product.  
2.2.2  
Basic interfaces and peripheral devices (PRIMEQUEST 1800E)  
1800E) shows a diagram of cable connections for the basic interfaces and peripheral devices of the PRIMEQUEST  
Cable connection diagram  
25  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.4 Interface cable connections (for the basic interfaces and peripheral devices) (PRIMEQUEST  
1800E)  
Remarks  
List of cables  
Determine the length of an external interface cable by considering the extra length required for laying the cable  
inside the cabinet.  
TABLE 2.4 Cables (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E)  
No.  
(1)  
Name  
Model name  
TPCBL-B005  
TPCBL-B010  
TPCBL-B015  
TPCBL-B030  
TPCBL-B050  
Commercially available types  
Length  
Twisted-pair cable  
(Category 5 UTP  
cable)  
Sold separately: Select from lengths of 5, 10, 5 m  
15, 30, 50, and 100 m.  
10 m  
100Base-TX and 10Base-T connections use  
15 m  
this cable (Category 5).  
RJ45 8Pin - RJ45 8Pin  
30 m  
50 m  
26  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
No.  
Name  
Model name  
Commercially available types  
Length  
100 m  
TPCBL-B100  
(2)  
Enhanced Category 5 TPCBL-C005  
Sold separately: Select from lengths of 5, 10, 5 m  
UTP cable  
15, 30, 50, and 100 m.  
TPCBL-C010  
10 m  
1000Base-T, 100Base-TX, and 10Base-T  
TPCBL-C015  
TPCBL-C030  
TPCBL-C050  
TPCBL-C100  
15 m  
connections use this cable (Category 5e).  
RJ45 8Pin - RJ45 8Pin  
30 m  
50 m  
100 m  
(3)  
(4)  
SAS cable  
CBL-SASM1U Sold separately: Select from lengths of 1.5 1.5 m  
and 3 m.  
miniSAS (SFF-8088) - miniSAS (SFF-8088)  
CBL-SASM3U  
3 m  
For use in countries other than Japan  
RS232C cable  
FMV-CBL501  
1.5 m  
(D-Sub 9Pin-9Pin,  
crossover cable)  
(5)  
(6)  
PCI Express cable  
Included with  
PCI_Box  
2 m  
Multimode  
CBL-MLLB02  
CBL-MLLB05  
CBL-MLLB15  
Sold separately: Select from lengths of 2, 5, 2 m  
Fibre Channel cable  
and 15 m.  
5 m  
Dual LC connector - Dual LC connector  
15 m  
Without cable insulation  
CBL-MLLC05  
CBL-MLLC10  
CBL-MLLC20  
CBL-MLLC30  
CBL-MLLC40  
CBL-MLLC50  
Sold separately: Select from lengths of 5, 10, 5 m  
20, 30, 40, and 50 m.  
10 m  
Dual LC connector - Dual LC connector  
20 m  
With cable insulation  
30 m  
40 m  
50 m  
CBL-MLLD1A Sold separately: 100 m (with cable  
insulation)  
100 m  
Dual LC connector - Dual LC connector  
(7)  
Multimode  
CBL-MLSB02  
CBL-MLSB05  
CBL-MLSB15  
Sold separately: Select from lengths of 2, 5, 2 m  
Fibre Channel cable  
and 15 m.  
5 m  
Dual LC connector - Dual SC connector  
Without cable insulation  
15 m  
CBL-MLSC05  
CBL-MLSC10  
CBL-MLSC20  
CBL-MLSC30  
Sold separately: Select from lengths of 5, 10, 5 m  
20, 30, 40, and 50 m.  
10 m  
Dual LC connector - Dual SC connector  
20 m  
With cable insulation  
30 m  
27  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
No.  
Name  
Model name  
CBL-MLSC40  
CBL-MLSC50  
Commercially available types  
Length  
40 m  
50 m  
CBL-MLSA1A Sold separately: 100 m (with cable  
insulation)  
100 m  
Dual LC connector - Dual SC connector  
(8)  
SAS cable  
PG-CBLA014/  
PG-CBLA015/  
PG-CBLA016  
Sold separately: Select from lengths of 2, 4, 2 m  
and 6 m.  
4 m  
6 m  
miniSAS (SFF-8088) - miniSAS (SFF-8088)  
2.2.3  
External interface connectors in detail  
This section shows the mounting locations of the external interface connectors for the PRIMEQUEST 1000 series.  
Consider the mounting location when calculating the extra length of a cable.  
External interface connectors in the PRIMEQUEST 1800E2/1800E main unit  
FIGURE 2.5 External interface connectors in the PRIMEQUEST 1800E2/1800E main unit (front view)  
28  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.6 External interface connectors in the PRIMEQUEST 1800E2/1800E main unit (rear view)  
MMB external interfaces in detail  
FIGURE 2.7 MMB external interfaces in detail  
IOB external interfaces in detail  
29  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.8 IOB external interfaces in detail  
GSPB external interfaces in detail  
FIGURE 2.9 GSPB external interfaces in detail  
PCI_Box external interfaces in detail  
30  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
No.  
Description  
PCI Express interface #1  
PCI Express interface #0  
(1)  
(2)  
FIGURE 2.10 PCI_Box external interfaces in detail  
31  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.3  
Power Cable Connections  
This section shows diagrams of the input power distribution for the PRIMEQUEST 1000 series main unit and the  
PCI_Box.  
2.3.1  
Power cable connections of the PRIMEQUEST 1800E2/1800E  
This section shows diagrams of the input power distribution for the PRIMEQUEST 1800E2/1800E.  
Standard configuration (primary power feed, no redundant power supply)  
FIGURE 2.11 Standard configuration (primary power feed, no redundant power supply)  
*1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.  
*2 The power distribution box must be prepared separately.  
*3 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.  
Redundant power supply configuration (primary power feed, redundant power supply)  
32  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
             
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.12 Redundant power supply configuration (primary power feed, redundant power supply)  
*1 Power cables (AC#0 to AC#2) are connected to PSUs (PSU#0 to PSU#2) on a one-to-one basis.  
*2 This change to the power supply configuration requires a redundant power supply (200 V), which must be  
prepared separately.  
*3 The power distribution box must be prepared separately.  
*4 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.  
Dual power feed configuration  
FIGURE 2.13 Dual power feed configuration  
*1 Power cables (AC#0 to AC#3) are connected to PSUs (PSU#0 to PSU#3) on a one-to-one basis.  
*2 This change to the power supply configuration requires a dual power supply (200 V), which must be prepared  
separately.  
*3 The power distribution box must be prepared separately.  
*4 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.  
33  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.3.2  
Power cable connections of the PCI_Box  
This section shows diagrams of the input power distribution for the PCI_Box.  
Remarks  
Use the same power configuration for the PCI_Box as that for the main unit, which is either a redundant  
configuration or dual power feed configuration.  
200 to 240 V standard configuration (primary power feed, no redundant power supply)  
FIGURE 2.14 200 to 240 V standard configuration (primary power feed, no redundant power supply)  
*1 The power cable (AC#0) is connected to the PSU (PSU#0) on a one-to-one basis.  
*2 The power distribution box must be prepared separately.  
*3 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.  
200 to 240 V redundant power supply configuration (primary power feed, redundant power  
supply)  
34  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.15 200 to 240 V redundant power supply configuration (primary power feed, redundant power  
supply)  
*1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.  
*2 This change to the power supply configuration requires a redundant power supply (200 V) for the PCI_Box, and  
the power supply must be prepared separately.  
*3 The power distribution box must be prepared separately.  
*4 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.  
200 to 240 V dual power feed configuration  
35  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.16 200 to 240 V dual power feed configuration  
*1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.  
*2 This change to the power supply configuration requires a redundant power supply (200 V) for the PCI_Box, and  
the power supply must be prepared separately.  
*3 The power distribution box must be prepared separately.  
*4 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.  
100 to 120 V configuration (primary power feed, no redundant power supply)  
36  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.17 100 to 120 V configuration (primary power feed, no redundant power supply)  
*1 The power cable (AC#0) is connected to the PSU (PSU#0) on a one-to-one basis.  
*2 This change to the power supply configuration requires a 100 V power supply for the PCI_Box, and the power  
supply must be prepared separately.  
*3 Use the power cable supplied with the 100 V power supply for the PCI_Box instead of the standard power cable  
supplied with the device.  
100 to 120 V redundant power supply configuration (primary power feed, redundant power  
supply)  
FIGURE 2.18 100 to 120 V redundant power supply configuration (primary power feed, redundant power  
supply)  
*1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.  
*2 This change to the power supply configuration requires a redundant power supply (100 V) for the PCI_Box, and  
the power supply must be prepared separately.  
*3 Use the power cable supplied with the redundant power supply (100 V) for the PCI_Box instead of the standard  
power cable supplied with the device.  
37  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.4  
Input Power Connection Specifications  
This section lists the specifications of input power connections.  
2.4.1  
PRIMEQUEST 1000 series main unit  
connections specifications of the PRIMEQUEST 1000 series main unit.  
TABLE 2.5 Power cable specifications of the PRIMEQUEST 1000 series main unit  
Plug type  
IEC320-C20 type  
Remarks  
Shape of receptacle IEC320-C19 type  
outlet  
Remarks  
- Connect the device with the power cable supplied with the device or the power cable supplied with the optional  
component. Do not use the power cable supplied with the device to connect a different product.  
- Use a plug that matches the shape of the receptacle outlet.  
2.4.2  
PCI_Box  
TABLE 2.6 Power cable specifications of the PCI_Box lists the input power connections specifications of the  
PCI_Box.  
TABLE 2.6 Power cable specifications of the PCI_Box  
Plug type  
IEC320-C14 type  
Remarks  
Shape of receptacle  
outlet  
IEC320-C13 type  
Remarks  
- Connect the device with the power cable supplied with the device or the power cable supplied with the optional  
component. Do not use the power cable supplied with the device to connect a different product.  
- Use a plug that matches the shape of the receptacle outlet.  
38  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
               
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.4.3  
Connections between the power distribution box and distribution panel  
specifications of power cables between the power distribution box and distribution panel.  
TABLE 2.7 Specifications of the power cable between the power distribution box and distribution panel  
Destination  
Plug type  
Remarks  
Shape of receptacle  
outlet  
NEMA L6-30R (North America  
For use in countries  
other than Japan  
NEMA L6-30P  
only)  
30A-220VAC  
Shape of receptacle  
outlet  
IEC60309  
For use in Brazil  
IEC60309-32A  
32A-250VAC  
Remarks  
- Connect the device with only the power cable supplied with the device. Do not use the power cable supplied  
with the device to connect a different product.  
- Use a plug that matches the shape of the receptacle outlet.  
39  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.5  
Power Cable Connections under a Raised Floor (Except in  
Europe)  
For a power distribution box (or the main unit or the PCI_Box) whose power cable is connected under a raised  
floor, the recommended underfloor height is at least 300 mm (11.8 in.), depending on the connector shape and the  
Europe).)  
If the underfloor height is less than 300 mm (11.8 in.), install the receptacle outlet sideways. (See (2) in FIGURE  
In either case, prepare a receptacle outlet close to the device.  
FIGURE 2.19 Power cable connections under a raised floor (except in Europe)  
Remarks  
- The above figure shows an example with the device mounted in a Fujitsu 19-inch rack.  
- The values in parentheses ( ) are in inches.  
40  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
2.6  
Shutoff Characteristic of the Customer's Distribution Panel  
(Only When Connected to the Power Distribution Box)  
To protect the device when it is connected to the customer's distribution panel through a power distribution box,  
the breaker of the device (or the power distribution box) must trip before the corresponding breaker in the customer's  
distribution panel. For this reason, the breakers in the customer's distribution panel must meet the characteristics  
characteristics.  
TABLE 2.8 Breaker characteristics for the customer's distribution panel  
Power input  
Device name  
Breaker for use in countries other than Breaker for use in  
European countries (*) Europe (*)  
32 A  
200 to 240 VAC Power distribution box 30 A  
* Capacity of a breaker in the customer's distribution panel  
Use a long-time-delay type of breaker whose characteristics correspond to phase D shown in FIGURE 2.20  
Distribution panel breaker characteristics (IEC898 or DIN0641 Part II). Alternatively, use a slower breaker.  
41  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 2 Connection Information  
FIGURE 2.20 Distribution panel breaker characteristics  
42  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 3  
Notes on Carrying In and  
Installing the Product  
This chapter provides notes on carrying in and installing the  
PRIMEQUEST 1000 series server.  
3.1 Elevator Load Conditions ........................................... 44  
3.2 Earthquake Preparedness Measures ......................... 45  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 3 Notes on Carrying In and Installing the Product  
3.1  
Elevator Load Conditions  
The rack with the device mounted is wider than the average computer. Therefore, to use an elevator to carry in the  
rack, the rack may need the side boards or doors removed before loading on the elevator. When using an elevator  
to carry in the rack, see the elevator load conditions in TABLE 3.1 Elevator load conditions and confirm that you  
are properly loading the rack on the elevator.  
TABLE 3.1 Elevator load conditions  
Elevator code  
Load  
capacity  
[kg]  
Width  
(*1)  
Depth  
(*1)  
Height  
(*1)  
Width  
(*2)  
Height  
(*2)  
Rack  
Models 2742/2737/2724/  
2642/2624/2616  
Models 1740/1640/1624  
P-6-C0  
450  
600  
750  
900  
1000  
1400  
850  
2300  
800  
2100  
Cannot be loaded  
Cannot be loaded  
Can be loaded  
Can be loaded  
Can be loaded  
P-9-C0  
1400  
1400  
1600  
1100  
1350  
1350  
2300  
2300  
2300  
2300  
800  
800  
900  
2100  
2100  
2100  
2100  
P-11-C0  
P-13-C0  
P-15-C0  
1600  
1800  
1500  
1300  
900  
1000  
P-17-C0  
P-20-C0  
P-24-C0  
1150  
1350  
1600  
1800  
2000  
1500  
1350  
2300  
2300  
2300  
1000  
1100  
2100  
2100  
2100  
Can be loaded  
Can be loaded  
Can be loaded  
1800  
2000  
1700  
1500  
1000  
1100  
2000  
2150  
1750  
1600  
1100  
*1 Interior dimensions of the cab [mm]  
*2 Door opening dimensions [mm]  
44  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 3 Notes on Carrying In and Installing the Product  
3.2  
Earthquake Preparedness Measures  
The purpose of the earthquake preparedness measures is to prevent the computer from falling and breaking, and to  
ensure operator safety as well as quick system recovery. To prevent damage to the computer system from an  
earthquake, Fujitsu provides an earthquake countermeasure called "fixed construction." (A fixed construction  
prevents the device from falling by fixing it in place.)  
The necessity of a fixed construction is determined from the following factors:  
- Magnitude of floor vibrations at the installation site  
- Whether the floor is a raised floor  
- Device structure  
Before choosing an earthquake countermeasure and performing the actual work for earthquake preparedness,  
consult with Fujitsu's engineering works department.  
45  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
CHAPTER 3 Notes on Carrying In and Installing the Product  
46  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
APPENDIX A Racks  
This appendix provides various information on the mounting racks for  
the PRIMEQUEST 1000 series and PCI_Box.  
A.1 Rack Mounting ........................................................... 48  
A.2 Rack Mounting Requirements ................................... 51  
A.3 Fujitsu 19-inch Racks ................................................ 60  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
A.1  
Rack Mounting  
The PRIMEQUEST 1000 series (including peripheral devices) has been developed and its operation guaranteed  
installation work must be satisfied for safe use of a unit mounted in a Fujitsu 19-inch rack.  
When mounting the PRIMEQUEST products in a rack manufactured by another company, customers need to  
confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and requirements.  
For details on the models 2742/2737/2724/2642/2624/2616, contact the distributor where you purchased your  
product, or your sales representative.  
A.1.1  
Arrangements for installation work  
Arrange the installation work by using the following steps.  
Remarks  
For the models 2742/2737/2724/2642/2624/2616, contact the distributor where you purchased your product, or  
your sales representative.  
TABLE A.1 Arrangements for installation work  
(1)  
(2)  
(3)  
(4)  
Remarks  
Consider  
Select a rack.  
Select a fixed  
construction.  
Arrange for an  
optional  
earthquake-  
resistant  
earthquake-  
resistance kit.  
anchoring for rack  
installation.  
If the rack is fixed Select a rack that Fixed  
in place comes without a construction  
Earthquake-  
resistance kit  
(*1)(*2)  
*1 The engineer responsible  
arranges for the bolts and other  
parts that secure the rack to the  
building.  
stabilizer.  
using an  
earthquake-  
resistance kit  
*2 There are earthquake-  
resistance kits for the base racks  
and expansion racks.  
For base rack: Front part x 1, rear  
part x 1, side part x 2, and 1 set of  
rack fixing bolts  
For expansion rack: Front part x 1,  
rear part x 1, and 1 set of rack  
fixing bolts  
Note  
If an earthquake-resistance kit for  
a base rack is used for an  
expansion rack, there will be  
leftover parts. These are the parts  
48  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
(1)  
(2)  
(3)  
(4)  
Remarks  
Consider  
Select a rack.  
Select a fixed  
construction.  
Arrange for an  
optional  
earthquake-  
resistant  
earthquake-  
resistance kit.  
anchoring for rack  
installation.  
to be attached to the sides of the  
rack.  
If an earthquake-resistance kit for  
an expansion rack is used for a  
base rack, there will not be enough  
parts. These are the parts to be  
attached to the sides of the rack.  
Operation without the side parts  
attached is not possible.  
Fixed  
None (*1)  
None  
*1 The engineer responsible  
arranges for the bolts and other  
parts that secure the rack to the  
building.  
construction  
using leveling feet  
If the rack is not Select a rack that -  
*3 Even if the selected rack comes  
with a stabilizer, it can also be  
fixed in place with an earthquake-  
resistance kit. However, among  
the components included in the  
earthquake-resistance kit, the  
leftover part will be the part to be  
attached to the front of the rack.  
*4 Even if the selected rack comes  
with a stabilizer, it can also be  
fixed in place with leveling feet  
while the stabilizer remains  
attached. In such cases, the  
stabilizer is not necessarily  
functional.  
fixed in place  
comes with a  
stabilizer.  
(*3)(*4)  
(1) Consider earthquake-resistant anchoring for rack installation.  
Before selecting a 19-inch rack, consider whether to use earthquake-resistant anchoring for rack installation  
according to the customer's required earthquake-resistance level and the conditions in the building where the rack  
will be installed.  
A rack fixed in place in a general building is earthquake-resistant up to an acceleration of 1000 gal.  
For a rack not to be fixed in place, be sure to select one that comes with a stabilizer. Use the stabilizer to prevent  
the rack from toppling during maintenance of any device mounted in the rack. In such cases, the rack in a general  
building is earthquake-resistant up to an acceleration of 250 gal.  
49  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
(2) Select a rack.  
For a rack to be fixed in place, select one that comes without a stabilizer. See "(3) Select a fixed construction"  
below.  
Note  
For a rack not to be fixed in place, be sure to select one that comes with a stabilizer, regardless of whether the  
building or flooring has earthquake-resistant (seismic) features. Use the stabilizer to prevent the rack from toppling  
during maintenance of any device mounted in the rack.  
(3) Select a fixed construction.  
The two types of construction for fixing the rack in place are as follows:  
- Construction using an optional earthquake-resistance kit  
- Construction using leveling feet  
After considering conditions such as the installation floor, select either construction type appropriate to the  
conditions.  
To use an earthquake-resistance kit to fix the rack in place, see "(4) Arrange for an optional earthquake-resistance  
kit" below.  
To use leveling feet to fix the rack in place, see TABLE A.1 Arrangements for installation work.  
Note  
Unless it is fixed to the floor, a rack that comes without a stabilizer cannot be used. The rack must be fixed in place  
to prevent it from toppling, such as during maintenance of a device mounted in the rack.  
(4) Arrange for an optional earthquake-resistance kit.  
To use an earthquake-resistance kit, arrange for the optional earthquake-resistance kit appropriate to the respective  
base or expansion rack.  
- For Model 1740 base rack: 19R-17ST1  
- For Model 1740 expansion rack: 19R-17ST2  
- For Model 1640/1624 base rack: 19R-16ST1  
- For Model 1640/1624 expansion rack: 19R-16ST2  
50  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
A.2  
Rack Mounting Requirements  
This section describes rack mounting requirements.  
Note  
When mounting in the rack, do not hold the cabinet by the handle of a fan.  
No.  
Description  
(1)  
Handle of a fan  
FIGURE A.1 Caution on rack mounting  
A.2.1  
Requirements for mounting in a Fujitsu 19-inch rack  
This section explains the requirements for mounting in a Fujitsu 19-inch rack. For safe use of the PRIMEQUEST  
1000 series server mounted in a Fujitsu 19-inch rack, observe the mounting requirements described below.  
Recommended racks for mounting  
The following table lists the recommended racks for mounting the PRIMEQUEST 1000 series server and PCI_Box.  
51  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
TABLE A.2 Recommended racks for mounting  
Fujitsu 19-inch rack  
Model 2742  
Depth (mm)  
Open area ratio  
1050  
1050  
1050  
1050  
1050  
1050  
1050  
1050  
1050  
80%  
80%  
80%  
80%  
80%  
75%  
80%  
80%  
80%  
Model 2737  
Model 2724  
Model 2642  
Model 2624  
Model 2616  
Model 1740  
Model 1640  
Model 1624  
TABLE A.3 PRIMEQUEST 1000 series external dimensions*  
Model  
Height  
530 mm  
(12U)  
Width  
Depth  
800 mm  
PRIMEQUEST 1800E2/1800E  
440 mm  
(Panel included:  
482 mm)  
* The external dimensions do not include protrusions.  
Note  
The Fujitsu 19-inch rack comes with a blank panel covering the front of each empty space that has no mounted  
device.  
If warm exhaust air from the device circulates to the front of the rack and reenters the device, it may cause a  
temperature alarm and lead to a device failure.  
Be sure to use the blank panel to cover the front of an empty space that has no mounted device.  
Rack mounting requirements  
The following table lists the requirements for mounting in one rack.  
TABLE A.4 Rack mounting requirements  
Number of  
Model  
Mounting area  
mountable units  
PRIMEQUEST 1800E2/1800E  
Up to 2 units  
The bottom of the mounted device  
must not be below 1U.  
The top of the mounted device must  
not be above the upper limit (26U).  
(*)  
PCI_Box  
No mounting requirements (*)  
52  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
*:  
For the models 2742/2737/2724/2642/2624/2616, the bottom of the mounted device must not be below  
2U. It is not mountable at 1U of the lowest rack.  
For details, contact the distributor where you purchased your product, or your sales representative.  
No.  
Description  
(1)  
(2)  
PCI_Box (4U)  
PRIMEQUEST 1800E2/1800E upper limit  
position (26U)  
53  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
(3)  
(4)  
Description  
PRIMEQUEST 1800E2/1800E cabinet (12U)  
PRIMEQUEST 1800E2/1800E lower limit  
position (1U)  
FIGURE A.2 Rack mounting requirements (PRIMEQUEST 1800E2/1800E)  
Removing the cable holders from the Fujitsu 19-inch rack (only for mounting in the Models  
2742/2737/2724/2642/2624/2616/1740/1640/1624)  
If the attached cable holders are in the mounting area for the PRIMEQUEST 1000 series server in the Fujitsu 19-  
inch rack, remove the cable holders or adjust the mounting location of the server so that the mounting area does  
not include the locations of the cable holders.  
54  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
(1)  
Description  
PRIMEQUEST 1800E2/1800E  
Locations of the cable holders to be removed  
(Both sides of the (upper) front cover)  
FIGURE A.3 Cable holder locations  
55  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
Procedure for removing cable holders (Model 1740)  
Remove the cable holders by using a Phillips screwdriver.  
No.  
(1)  
Description  
M5 screw  
(2)  
(3)  
Cable holder  
Phillips screwdriver  
FIGURE A.4 Removing a cable holder (Model 1740)  
Procedure for removing cable holders (Model 1640/Model 1624)  
Remove the cable holders by using a Phillips screwdriver.  
Before removing cable holders on the side of the door hinges, you need to remove the attached door.  
56  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
Cable holder  
Machine screw (SEMS w/washer screw M5 x 12)  
FIGURE A.5 Removing a cable holder (Model 1640/Model 1624)  
A.2.2  
Requirements for mounting in a rack manufactured by another company  
When mounting the PRIMEQUEST products in a rack manufactured by another company, customers need to  
confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and requirements.  
Note  
Fujitsu does not guarantee there will be no problems arising from the mounting of the PRIMEQUEST 1000 series  
server (including peripheral devices) in a rack manufactured by another company.  
Examples: Cooling problem due to an insufficient supply of cooling air because of the rack structure, and insufficient  
earthquake-resistance because the rack manufactured by another company is not strong enough  
If mounting in a rack manufactured by another company cannot be avoided, confirm that the rack satisfies all of  
the following structural requirements.  
Conditions of rack depth  
57  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
The device is mounted in a rack using a rack mounting kit (supplied with the PRIMEQUEST 1000 series server).  
Therefore, the following conditions regarding distance must be satisfied. One condition is the allowable spacing  
between posts. The second condition is the length from the inside of the front cover to the front surface of the front  
rack posts. The third condition is the length from the front surface of the front rack posts to the inside of the rear  
cover.  
FIGURE A.6 Conditions of rack depth  
Conditions regarding rack posts  
58  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
FIGURE A.7 Conditions regarding rack posts  
A: Space for attaching the device front panel: 483 mm (19.0 in.) or more  
B: Distance between holes on the left and right device mounting posts (common to the front and rear posts): 465  
mm (18.3 in.)  
C: Distance between the left and right posts (common to the front and rear posts): 450 mm (17.7 in.) or more  
D: EIA standard, universal pitch  
E: Length of each side of a square hole: 9 to 9.5 mm (0.354 to 0.374 in.)  
Other conditions  
Besides structural conditions, the following conditions must also be considered.  
- Cooling of devices mounted in the rack  
Especially, cover the front of empty spaces in the rack and take other such necessary measures to prevent  
exhaust air from devices from recirculating to the air intake.  
- Securing the maintenance work area (service area)  
Secure the service area required for the maintenance work performed by a Fujitsu certified service engineer.  
Referring to the Fujitsu rack service areas in 1.4 Installation Area and to the installation manual of the rack  
used, determine the service areas.  
59  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
A.3  
Fujitsu 19-inch Racks  
This section shows the types, outline drawings, and bottom view drawings of Fujitsu 19-inch racks.  
Remarks  
For the outline drawings and dimensions of the models 2742/2737/2724/2642/2624/2616, contact the distributor  
where you purchased your product, or your sales representative.  
A.3.1  
Types of 19-inch rack  
TABLE A.5 Types of 19-inch rack lists the racks in which the PRIMEQUEST 1000 series server and PCI_Box  
can be mounted.  
Remarks  
For the racks on which models can be mounted, the models 2742/2737/2724/2642/2624/2616 are also available.  
For details, contact the distributor where you purchased your product, or your sales representative.  
TABLE A.5 Types of 19-inch rack  
Item Model name Product name Width  
No. (*1)  
Depth Height  
(*1) (*1)  
Total  
Rack  
Total  
rack  
Remarks  
weight weight  
capacity  
(*2)(*3)  
(*2)  
weight  
(*2)  
1
19R-174A1  
19R-174A2  
19R-174B1  
19-inch rack 700  
1272  
2000  
800  
143  
943  
40U  
Model 1740 (27.6)  
(base/with  
(50.1)  
(78.8)  
(1760) (315)  
(*4)  
(2075) with side  
boards  
stabilizer)  
(standard)  
2
3
19-inch rack 700  
Model 1740 (27.6)  
(base/without  
1050  
2000  
800  
135  
935  
40U  
(41.3)  
(78.8)  
(1760) (297)  
(2057) with side  
boards  
stabilizer)  
(standard)  
19-inch rack 700  
Model 1740 (27.6)  
(expansion/  
with  
1272  
2000  
800  
110  
910  
40U  
(50.1)  
(78.8)  
(1760) (242)  
(*4)  
(2002) without side  
boards  
stabilizer)  
(standard)  
(*5)  
4
19R-174B2  
19-inch rack 700  
1050  
2000  
800  
102  
902  
40U  
Model 1740 (27.6)  
(41.3)  
(78.8)  
(1760) (224)  
(1984)  
60  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
Item Model name Product name Width  
No. (*1)  
Depth Height  
(*1) (*1)  
Total  
Rack  
Total  
rack  
Remarks  
weight weight  
capacity  
(*2)(*3)  
(*2)  
weight  
(*2)  
(expansion/  
without  
without side  
boards  
stabilizer)  
(standard)  
(*5)  
5
19R-164A1  
19R-164A2  
19R-164B1  
19-inch rack 600  
Model 1640 (23.6)  
(base/with  
1050  
2000  
800  
126  
926  
40U  
(41.3)  
(78.8)  
(1760) (277)  
(*4)  
(2037) with side  
boards  
stabilizer)  
(slim)  
6
7
19-inch rack 600  
Model 1640 (23.6)  
(base/without  
stabilizer)  
1050  
2000  
800  
118  
918  
40U  
(41.3)  
(78.8)  
(1760) (256)  
(2019) with side  
boards  
(slim)  
19-inch rack 600  
Model 1640 (23.6)  
(expansion/  
with  
1050  
2000  
800  
94  
894  
40U  
(41.3)  
(78.8)  
(1760) (206)  
(*4)  
(1966) without side  
boards  
stabilizer)  
(slim)  
8
19R-164B2  
19-inch rack 600  
Model 1640 (23.6)  
(expansion/  
without  
1050  
2000  
800  
86  
886  
40U  
(41.3)  
(78.8)  
(1760) (189)  
(1949) without side  
boards  
stabilizer)  
(slim)  
9
19R-162A1  
19R-162A2  
19-inch rack 600  
Model 1624 (23.6)  
(base/with  
1050  
1264  
480  
94  
574  
24U  
(41.3)  
(49.7)  
(1056) (206)  
(*4)  
(1262) with side  
boards  
stabilizer)  
10  
19-inch rack 600  
Model 1624 (23.6)  
(base/without  
stabilizer)  
1050  
1264  
480  
86  
566  
24U  
(41.3)  
(49.7)  
(1056) (189)  
(1245) with side  
boards  
(slim)  
11  
19R-162B1  
19-inch rack 600  
1050  
1264  
480  
75  
555  
24U  
Model 1624 (23.6)  
(41.3)  
(49.7)  
(1056) (165)  
(*4)  
(1221) without side  
boards  
61  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
Item Model name Product name Width  
No. (*1)  
Depth Height  
(*1) (*1)  
Total  
Rack  
Total  
rack  
Remarks  
weight weight  
capacity  
(*2)(*3)  
(*2)  
weight  
(*2)  
(expansion/  
with  
stabilizer)  
(slim)  
12  
19R-162B2  
19-inch rack 600  
Model 1624 (23.6)  
(expansion/  
without  
1050  
(41.3)  
1264  
(49.7)  
480  
67  
547  
24U  
(1056) (147)  
(1203) without side  
boards  
stabilizer)  
(slim)  
*1 Rack size [mm (in.)]  
*2 Weight [kg (lb.)]  
*3 The value does not include the weight of the rack itself.  
*4 The rack weight includes the weight of the stabilizer that prevents the rack from toppling.  
*5 To use an expansion rack (MC-R7RC21), connect it to a base rack (MC-R7RC11). Expansion racks (MC-  
R7RC21) can also be connected together.  
A.3.2  
Outline drawings of 19-inch racks  
This section provides outline drawings of each rack.  
Remarks  
For the outline drawings and dimensions of the models 2742/2737/2724/2642/2624/2616, contact the distributor  
where you purchased your product, or your sales representative.  
19-inch rack Model 1740 (base/with stabilizer)  
62  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
(5)  
(6)  
Top view  
Rear view  
Right side view  
Front view  
Stabilizer  
Top cover  
FIGURE A.8 Outline drawing of the 19-inch rack Model 1740 (base/with stabilizer)  
63  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
19-inch rack Model 1740 (base/without stabilizer)  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
Top view  
Rear view  
Right side view  
Front view  
FIGURE A.9 Outline drawing of the 19-inch rack Model 1740 (base/without stabilizer)  
19-inch rack Model 1740 (expansion/with stabilizer)  
64  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
65  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
(5)  
(6)  
(7)  
Top view  
Rear view  
Right side view  
Front view  
Bottom view  
Leveling foot  
Caster  
FIGURE A.10 Outline drawing of the 19-inch rack Model 1740 (expansion/with stabilizer)  
19-inch rack Model 1740 (expansion/without stabilizer)  
66  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
Top view  
Rear view  
Right side view  
Front view  
FIGURE A.11 Outline drawing of the 19-inch rack Model 1740 (expansion/without stabilizer)  
19-inch rack Model 1640 (base/with stabilizer)  
67  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
(5)  
(6)  
Top view  
Rear view  
Right side view  
Front view  
Stabilizer  
Top cover  
FIGURE A.12 Outline drawing of the 19-inch rack Model 1640 (base/with stabilizer)  
19-inch rack Model 1640 (base/without stabilizer)  
68  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
Top view  
Rear view  
Right side view  
Front view  
FIGURE A.13 Outline drawing of the 19-inch rack Model 1640 (base/without stabilizer)  
19-inch rack Model 1640 (expansion/with stabilizer)  
69  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
Top view  
Rear view  
Right side view  
70  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(4)  
(5)  
(6)  
(7)  
Front view  
Bottom view  
Leveling foot  
Caster  
FIGURE A.14 Outline drawing of the 19-inch rack Model 1640 (expansion/with stabilizer)  
19-inch rack Model 1640 (expansion/without stabilizer)  
No.  
Description  
(1)  
Top view  
71  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(2)  
(3)  
(4)  
Rear view  
Right side view  
Front view  
FIGURE A.15 Outline drawing of the 19-inch rack Model 1640 (expansion/without stabilizer)  
19-inch rack Model 1624 (base/with stabilizer)  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
(5)  
Top view  
Rear view  
Right side view  
Front view  
Stabilizer  
72  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(6)  
Top cover  
FIGURE A.16 Outline drawing of the 19-inch rack Model 1624 (base/with stabilizer)  
19-inch rack Model 1624 (base/without stabilizer)  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
Top view  
Rear view  
Right side view  
Front view  
FIGURE A.17 Outline drawing of the 19-inch rack Model 1624 (base/without stabilizer)  
19-inch rack Model 1624 (expansion/with stabilizer)  
73  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
(5)  
(6)  
(7)  
Top view  
Rear view  
Right side view  
Front view  
Bottom view  
Leveling foot  
Caster  
FIGURE A.18 Outline drawing of the 19-inch rack Model 1624 (expansion/with stabilizer)  
74  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
19-inch rack Model 1624 (expansion/without stabilizer)  
No.  
Description  
(1)  
(2)  
(3)  
(4)  
Top view  
Rear view  
Right side view  
Front view  
FIGURE A.19 Outline drawing of the 19-inch rack Model 1624 (expansion/without stabilizer)  
A.3.3  
Bottom view drawings of 19-inch racks  
This section provides bottom view drawings of 19-inch racks.  
75  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
Bottom view drawing of the (standard) 19-inch rack  
FIGURE A.20 Bottom view drawing of the (standard) 19-inch rack  
Bottom view drawing of the (slim) 19-inch rack  
76  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
FIGURE A.21 Bottom view drawing of the (slim) 19-inch rack  
Bottom view drawing of the rack equipped with the pullout stabilizer (standard type only)  
77  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
FIGURE A.22 Bottom view drawing of the rack equipped with the pullout stabilizer (standard type only)  
Bottom view drawing of connected 19-inch racks (standard)  
78  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
FIGURE A.23 Bottom view drawing of connected 19-inch racks (standard)  
Bottom view drawing of connected 19-inch racks (slim)  
FIGURE A.24 Bottom view drawing of connected 19-inch racks (slim)  
79  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX A Racks  
80  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
APPENDIX B UPC Interface  
This appendix describes the UPC interface that can be used with the  
PRIMEQUEST 1000 series.  
B.1 Overview .................................................................... 82  
B.2 Signal Cable .............................................................. 83  
Definitions .............................................................. 84  
B.4 Cable Connector ........................................................ 86  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX B UPC Interface  
B.1  
Overview  
The CVCF provides a stable power supply to the system even in the event of a power abnormality or major power  
outage.  
Through a connection between the CVCF and a UPC port on the main unit with a signal cable, the CVCF can notify  
the main unit of abnormal power conditions when it detects them. On receiving such notification, the main unit  
performs emergency shutdown processing, and thus can safely stop operation.  
The following figure shows the locations of the UPC ports of the PRIMEQUEST 1000 series:  
No.  
(1)  
(2)  
Description  
UPC#1 port  
UPC#0 port  
FIGURE B.1 UPC port locations (PRIMEQUEST 1800E2/1800E)  
82  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX B UPC Interface  
B.2  
Signal Cable  
For the signal cable, use a shielded-pair cable that satisfies the following specifications.  
- Direct current resistance (round trip/one pair): 400 W/km or lower  
- Cable length: up to 10 m (33 ft.)  
83  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX B UPC Interface  
B.3  
Connection of Main Unit and CVCF and Signal Line Definitions  
This section shows the connection of the main unit and CVCF. This section also provides definitions of the signal  
lines.  
The figure below is a connection diagram of the main unit and CVCF.  
FIGURE B.2 Connection of the main unit and CVCF  
TABLE B.1 Signal line definitions  
Signal name  
Pin  
Function  
*BPS/  
6
Hardware abnormality signal  
*UALM  
When this signal becomes valid, the PRIMEQUEST notifies the system administrator of  
a CVCF abnormal condition.  
When the *ACOFF signal goes ON with the *BPS signal already ON, the system judges  
that battery-supported operation cannot be executed by the CVCF. In this case, forcible  
system stop is executed instead of shutdown processing. Stopping operation in this manner  
may cause damage to the system or data.  
The signal becomes valid when this line and GND (pin 5) are short-circuited.  
*BTL  
7
Near-end-of-battery-discharge notification signal  
The signal on this line notifies the PRIMEQUEST of the approaching end of discharge of  
the CVCF battery.  
This signal is used to notify the PRIMEQUEST that the power supply will shortly be  
stopped because of battery power depletion, when power is being supplied from the CVCF  
due to a power failure.  
When the signal goes ON, the system judges that battery-supported operation cannot be  
executed any longer. In this case, forcible system stop is executed instead of shutdown  
processing. Stopping operation in this manner may cause damage to the system or data.  
The signal becomes valid when this line and GND (pin 5) are short-circuited.  
*ACOFF  
9
Power failure detection signal  
The signal on this line notifies the PRIMEQUEST that the CVCF has detected a power  
failure.  
When the signal becomes valid, the PRIMEQUEST performs automatic shutdown  
processing.  
84  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX B UPC Interface  
Signal name  
Pin  
Function  
The length of the time from when the *ACOFF signal goes ON to when shutdown  
processing actually starts can be specified from the MMB according to the operation. (*1)  
The signal becomes valid when this line and GND (pin 5) are short-circuited.  
GND  
5
Common ground signal  
*1: Shutdown Delay after UPS detected AC Failure: There is a possibility that the power failure detection signal  
will be caused by a momentary power interruption. To be prepared for such cases, the maximum wait time until  
shutdown can be specified (default value: 5 seconds).  
85  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRIMEQUEST 1000 Series Hardware Installation Manual  
APPENDIX B UPC Interface  
B.4  
Cable Connector  
This section describes the connector type and the correspondence between the UPC interface and the signal cable  
pins.  
Connector type  
D-SUB9 male connector (receptacle: female)  
Pin assignment  
The figure below shows the UPC interface and pin assignment of the signal cable.  
Unused pins (pins 1, 2, 3, 4, and 8 in the FIGURE B.2 Connection of the main unit and CVCF) must not be used.  
The pin assignment on the cable side is as shown below.  
FIGURE B.3 Correspondence between UPC interface and signal cable pins  
86  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
PRIMEQUEST 1000 Series Hardware Installation Manual  
Index  
Index  
[Numbers]  
External interface connectors in the PRIMEQUEST  
1800E2/1800E main unit (front view)............................. 28  
External interface connectors in the PRIMEQUEST  
1800E2/1800E main unit (rear view)............................... 29  
100 to 120 V configuration (primary power feed, no  
redundant power supply).................................................. 37  
100 to 120 V redundant power supply configuration (primary  
power feed, redundant power supply).............................. 37  
200 to 240 V dual power feed configuration.................... 36  
200 to 240 V redundant power supply configuration (primary  
power feed, redundant power supply).............................. 35  
200 to 240 V standard configuration (primary power feed, no  
redundant power supply).................................................. 34  
[F]  
Fujitsu 19-inch Racks....................................................... 60  
[G]  
GSPB external interfaces in detail................................... 30  
[I]  
[A]  
Input Power Connection Specifications........................... 38  
Installation Area............................................................... 11  
Installation Environment.................................................. 16  
Installation Information...................................................... 1  
Installation Specifications.................................................. 6  
Interface cable connections (for the basic interfaces and  
peripheral devices) (PRIMEQUEST 1800E)................... 26  
Interface cable connections (for the basic interfaces and  
peripheral devices) (PRIMEQUEST 1800E2)................. 23  
IOB external interfaces in detail....................................... 30  
Arrangements for installation work.................................. 48  
[B]  
Bottom view drawing of connected 19-inch racks (slim)....  
Bottom view drawing of connected 19-inch racks (standard)  
.......................................................................................... 79  
Bottom view drawing of the (slim) 19-inch rack............. 77  
Bottom view drawing of the (standard) 19-inch rack...... 76  
Bottom view drawing of the rack equipped with the pullout  
stabilizer (standard type only).......................................... 78  
Breaker characteristics for the customer's distribution panel  
.......................................................................................... 41  
[M]  
MMB external interfaces in detail.................................... 29  
[N]  
[C]  
Notes on Carrying In and Installing the Product.............. 43  
Cable Connector............................................................... 86  
Cable holder locations...................................................... 55  
Cables (for the basic interfaces and peripheral devices)  
(PRIMEQUEST 1800E)................................................... 26  
Cables (for the basic interfaces and peripheral devices)  
(PRIMEQUEST 1800E2) ................................................ 24  
Caution on rack mounting................................................ 51  
Conditions of rack depth.................................................. 58  
Conditions regarding rack posts....................................... 59  
Connection Information................................................... 19  
Connection of Main Unit and CVCF and Signal Line  
Definitions........................................................................ 84  
Connection of the main unit and CVCF........................... 84  
Cooling and Exhaust Air Flows in the Devices............... 14  
Cooling and exhaust air flows in the PCI_Box................ 15  
Cooling and exhaust air flows in the PRIMEQUEST  
1800E2/1800E.................................................................. 14  
Correspondence between UPC interface and signal cable pins  
.......................................................................................... 86  
Notes on device connections (PRIMEQUEST 1800E)....  
Notes on device connections (PRIMEQUEST 1800E2)....  
[O]  
Outline drawing of the 19-inch rack Model 1624 (base/  
without stabilizer)............................................................. 73  
Outline drawing of the 19-inch rack Model 1624 (base/with  
stabilizer).......................................................................... 73  
Outline drawing of the 19-inch rack Model 1624 (expansion/  
without stabilizer)............................................................. 75  
Outline drawing of the 19-inch rack Model 1624 (expansion/  
with stabilizer).................................................................. 74  
Outline drawing of the 19-inch rack Model 1640 (base/  
without stabilizer)............................................................. 69  
Outline drawing of the 19-inch rack Model 1640 (base/with  
stabilizer).......................................................................... 68  
Outline drawing of the 19-inch rack Model 1640 (expansion/  
without stabilizer)............................................................. 72  
Outline drawing of the 19-inch rack Model 1640 (expansion/  
with stabilizer).................................................................. 71  
Outline drawing of the 19-inch rack Model 1740 (base/  
without stabilizer)............................................................. 64  
Outline drawing of the 19-inch rack Model 1740 (base/with  
stabilizer).......................................................................... 63  
Outline drawing of the 19-inch rack Model 1740 (expansion/  
without stabilizer)............................................................. 67  
Outline drawing of the 19-inch rack Model 1740 (expansion/  
with stabilizer).................................................................. 66  
[D]  
Device Configuration Details............................................. 2  
Device names and configuration details............................. 2  
Distribution panel breaker characteristics........................ 42  
Dual power feed configuration......................................... 33  
[E]  
Earthquake Preparedness Measures................................. 45  
Elevator Load Conditions................................................. 44  
Elevator load conditions................................................... 44  
87  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
PRIMEQUEST 1000 Series Hardware Installation Manual  
Index  
Outline Drawings of the Devices....................................... 3  
Overview.......................................................................... 82  
Overview of Connections................................................. 20  
Overview of device connections (PRIMEQUEST 1800E)....  
Specifications of the power cable between the power  
distribution box and distribution panel............................. 39  
Standard configuration (primary power feed, no redundant  
power supply)................................................................... 32  
[T]  
Overview of device connections (PRIMEQUEST 1800E2)...  
Tolerable limits for corrosive gases................................. 16  
Types of 19-inch rack....................................................... 60  
[P]  
[U]  
PCI_Box external interfaces in detail............................... 31  
PCI_Box front view........................................................... 5  
PCI_Box installation specifications................................... 9  
PCI_Box rear view............................................................. 5  
PCI_Box right side view.................................................... 5  
PCI_Box top view.............................................................. 5  
Power Cable Connections................................................ 32  
Power Cable Connections under a Raised Floor (Except in  
Europe)............................................................................. 40  
Power cable connections under a raised floor (except in  
Europe)............................................................................. 40  
Power cable specifications of the PCI_Box..................... 38  
Power cable specifications of the PRIMEQUEST 1000 series  
main unit........................................................................... 38  
PRIMEQUEST 1000 series external dimensions............. 52  
PRIMEQUEST 1800E2/1800E (front view)...................... 3  
PRIMEQUEST 1800E2/1800E (rear view)....................... 3  
PRIMEQUEST 1800E2/1800E (right side view).............. 4  
PRIMEQUEST 1800E2/1800E (top view)........................ 4  
PRIMEQUEST 1800E2 installation specifications............ 6  
PRIMEQUEST 1800E installation specifications.............. 7  
UPC Interface................................................................... 81  
UPC port locations (PRIMEQUEST 1800E2/1800E)..... 82  
[R]  
Rack Mounting................................................................. 48  
Rack Mounting Requirements.......................................... 51  
Rack mounting requirements........................................... 52  
Rack mounting requirements (PRIMEQUEST  
1800E2/1800E)................................................................. 54  
Racks................................................................................ 47  
Recommended racks for mounting.................................. 52  
Redundant power supply configuration (primary power feed,  
redundant power supply).................................................. 33  
Removing a cable holder (Model 1640/Model 1624)...... 57  
Removing a cable holder (Model 1740)........................... 56  
[S]  
Security Actions............................................................... 18  
Service area with the 19-inch rack model 1624 (19R-162xx)  
installed............................................................................ 13  
Service area with the 19-inch rack model 1640 (19R-164xx)  
installed............................................................................ 12  
Service area with the 19-inch rack model 1740 (19R-174xx)  
installed............................................................................ 11  
Shutoff Characteristic of the Customer's Distribution Panel  
(Only When Connected to the Power Distribution Box)....  
Signal Cable..................................................................... 83  
Signal Cable Connections................................................ 23  
Signal line definitions....................................................... 84  
88  
C122-H004-07EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Ei Electronics Smoke Alarm Ei 176 User Manual
Extron electronic Network Card MLC 226 IP User Manual
Fisher Price Car Seat 79700 User Manual
Fisher Price Motorized Toy Car 73690 User Manual
Fluke Power Supply 43B User Manual
Frigidaire Dishwasher FGID2466QB User Manual
FujiFilm Digital Camera 16404791 User Manual
GE Clothes Dryer DBVH520 User Manual
Gianni Industries Door GL600 S User Manual
Go Video DVR VR2945 User Manual